Campus record · Enriched · Verified 22 Oct 2026

Equinix Mumbai — MB1 to MB3Equinix India · Chandivali and Andheri East, Mumbai · about 2,720 cabinets live

Record PRJ-048Maharashtra — ChandivaliTier A — procurement-relevantScope amended: MB4 identified14 public sources cross-checked
Live and expandingCampus aggregateRegistry scope was incompleteNot additive — campus umbrella
$95m
MB3 initial
1,370
MB3 cabinets live
5,475
MB3 at full build
$365m
Cumulative India
5
India buildings
270+
Customers

Equinix entered India by buying two Mumbai data centres in 2021. It has since built the rest. MB3 opened on 8 April 2026 — its first self-built facility in the city — at an initial investment of over US$95 million, with more than 1,370 cabinets live and a design that scales to more than 5,475. Alongside MB1 and MB2, which together hold more than 1,350 cabinets, the campus is operating at roughly 40% of the cabinet count it is built to reach. Equinix has also quietly opened a fourth Mumbai building, MB4, which Gridvik’s own registry scope did not include.

1At a glance

Operator
Equinix India Private Limited, a subsidiary of Equinix, the world’s largest data centre company by revenue
How Equinix entered India
By acquisition in 2021, taking over two operating Mumbai data centres rather than building from scratch
The campus
Three interconnected buildings at Chandivali and Andheri East — MB1 on high ground, MB2 and MB3 adjacent to each other — joined by physically diverse dark fibre. A fourth, MB4, has also been opened and sits outside this record’s original scope
MB1 and MB2
More than 1,350 cabinets combined. MB1 is the only data centre in India hosting direct connect nodes for AWS, Google Cloud and Oracle Cloud
MB3
Announced June 2022. Opened 8 April 2026. Initial investment over US$95 million, revised up from the $86 million announced in 2022. More than 1,370 cabinets live, scaling to more than 5,475 at full build. Five storeys on nearly four acres
Land
In November 2024 Equinix bought 5,597 square metres — about 1.38 acres — in Chandivali for ₹155 crore, about $18 million, with an existing 5,386 square metre building on it
Cumulative India investment
About $365 million across five buildings as of April 2026
Customer base
More than 270 customers in India across network service providers and cloud platforms, with access to five internet exchanges
Additivity
Not additive. This is a campus umbrella. The individual buildings are what count
Status
Live and expanding. Equinix has said it is in talks to acquire further Mumbai land

2Four buildings, an unfinished scope

The Mumbai campus, building by building
BuildingCabinetsHow it arrivedStatus
MB1Included in the 1,350 combined with MB2Acquired in 2021Live
MB2Included in the 1,350 combined with MB1Acquired in 2021; adjacent to MB3Live
MB31,370 live, 5,475 at full buildSelf-built. Announced 2022, opened April 2026Live, expanding
MB4Not covered by this recordOpened separately; not in the original registry scopeLive

Gridvik’s master file carried this record as "MB1 to MB3". That scope is now incomplete. Trade coverage of the MB3 opening describes the new building joining the company’s existing Mumbai sites MB1, MB2 and MB4, and the company’s own Mumbai pages list MB1, MB2 and MB3 with more buildings implied.

The record has been re-scoped to state this rather than silently excluded, because a campus total that misses a building is the kind of error that compounds.

The naming confusion, stated plainly

MB3 is described in different outlets as the company’s third Mumbai data centre and its fourth in India. Both are right: it is the third Equinix building in Mumbai by sequence and the fourth numbered IBX in the country once MB4 is counted.

For anyone reconciling Equinix capacity, the lesson is to count buildings from the operator’s own pages, not from press releases, because the sequence and the numbering do not match.

3Cabinets across the campus

MB1 and MB2 combinedacquired in 20211,350 cabinetsMB3, phase 1opened 8 April 20261,370 cabinetsCampus live and deliveredderivedabout 2,720Campus at full buildderived from published ceilingsabout 6,825The campus is operating at roughly 40% of the cabinet count it has been designed to reach.
Figure 1Published cabinet counts, with the two derived totals. Equinix publishes cabinets and not megawatts, so cabinet count is the only consistent unit for this campus.
What the campus holds, in cabinets and in derived megawatts
MeasureCabinetsDerived MW at 5 kW
MB1 and MB2more than 1,350about 6.8 MW
MB3 phase 1more than 1,370about 6.9 MW
Campus live and deliveredabout 2,720about 13.6 MW
MB3 at full buildmore than 5,475about 27.4 MW
Campus at full buildabout 6,825about 34.1 MW
Mumbai market operating capacity—about 890 MW

Two things stand out. The campus is running at about 40% of the cabinet count it is designed to reach, which is normal for a campus that has just added its largest building and will fill it over several years. And at roughly 34 MW when complete, this campus represents about four per cent of Mumbai’s operating capacity — the largest data centre company in the world is a mid-sized participant in India’s largest data centre market.

That is the single most useful strategic fact on this page. India’s market is not dominated by the global incumbents. It is dominated by domestic operators, hyperscalers building for themselves, and the Adani and Reliance groups.

4The $95 million, and what it bought

MB3’s investment, announced against delivered
June 2022April 2026
Initial investmentover $86 millionover $95 million
Cabinets, first phasemore than 1,375more than 1,370
Cabinets, full buildmore than 4,150more than 5,475
First phase openingQ2 20248 April 2026
Sitefour-acre plot, Chandivalinearly four acres, five storeys, adjacent to MB2

Three things moved in four years: the cost went up by about 10%, the cabinet ceiling went up by almost a third, and the opening slipped by roughly two years.

That is a reasonable outcome for a first self-build in a new country. The cost escalation is modest by the standards of any construction project, and the capacity increase suggests the design was improved rather than cut back. The delay is the normal consequence of a company that had never built in India learning to build in India.

Cost per cabinet, phase one
About $69,000 per cabinet, or roughly $13.9 million per megawatt at a 5 kW design
What that includes
The shell for a five-storey building designed for more than 5,475 cabinets, of which about a quarter is fitted out
Land separately
₹155 crore for 1.38 acres plus an existing building, registered November 2024
Cumulative India spend
About $365 million, being the two acquired Mumbai buildings, MB3, MB4 and Chennai CN1

5Interconnection is the product

The reason a $95 million building in Chandivali is worth more than its megawatts is that it sells access, not space.

What an Equinix Mumbai customer is actually buying
AssetWhy it matters
Cloud on-rampsMB1 is the only data centre in India hosting direct connect nodes for AWS, Google Cloud and Oracle Cloud simultaneously
Internet exchangesAccess to five internet exchanges, which is the reason content, carrier and CDN businesses colocate here
Equinix FabricSoftware-defined interconnection to more than 270 Equinix data centres globally, so a Mumbai tenant can reach a partner in Frankfurt without leaving the building
Dark fibrePhysically diverse fibre between MB1, MB2 and MB3, creating one logical campus across three sites
Ecosystem densityMore than 270 customers in India — networks, clouds, content providers, financial firms

This is why the cost per megawatt here is three times a hyperscale build and why that comparison is misleading. A hyperscale campus sells bulk power to one tenant. A retail IBX sells a thousand small connections to a thousand businesses, and the cross-connects are the margin.

It is also why Equinix keeps buying land in Mumbai rather than building in cheaper states. Interconnection value is geographically trapped. A campus in a cheaper city with no internet exchange and no cloud on-ramp is not a substitute for one in Chandivali, however much the power costs.

6Bought, then built

The sequence of how Equinix built an Indian business is worth recording, because it is a template.

The India build sequence
DateMove
2021Acquires two operating Mumbai data centres, gaining customers, interconnection and internet exchanges on day one rather than after a five-year build
June 2022Announces MB3, a self-build on a four-acre Chandivali plot, at over $86 million, with a Q2 2024 opening
November 2024Buys 1.38 acres in Chandivali for ₹155 crore, with an existing building, to expand the campus footprint
September 2025Opens CN1 in Chennai, its first building outside Mumbai, connecting it to the Mumbai campus for a national proposition
8 April 2026Opens MB3, its first self-built Mumbai facility, at over $95 million, taking cumulative India investment to about $365 million
April 2026States it is holding talks to acquire further land in Mumbai for continued expansion

The pattern is: buy the ecosystem, then build inside it, then extend the brand to a second city connected to the first. Equinix did not try to win India with megawatts. It bought the interconnection position and has been adding capacity onto it ever since.

The strategic read

For a supplier, Equinix is the most predictable premium buyer in India and the least likely to be won on price. Its specification is set globally, its vendors are largely global, and its Indian builds inherit from both.

The opening is in localisation: anything that must be locally sourced, locally certified or locally serviced is where a new entrant can actually compete.

7Timeline

  • Equinix acquires two operating Mumbai data centres, entering India with existing customers, interconnection and internet exchanges.
  • Equinix announces MB3, its third Mumbai facility, at over $86 million on a four-acre Chandivali plot. First phase to open in Q2 2024 with more than 1,375 cabinets, scaling to more than 4,150.
  • Equinix India buys 5,597 square metres in Chandivali for ₹155 crore, with an existing 5,386 square metre building, registered with the state.
  • Chennai CN1 opens, the company’s first Indian building outside Mumbai, interconnected with the Mumbai campus.
  • MB3 opens. Over $95 million initial investment, more than 1,370 cabinets, scaling to more than 5,475. Cumulative India investment disclosed at about $365 million across five buildings.
  • Campus live with about 2,720 cabinets across MB1 to MB3, with MB4 also operating. About 4,100 further cabinets of MB3 capacity remain unbuilt

8Procurement

Procurement window and scope
Gridvik assessment · 22 Oct 2026
This record
A live campus of four buildings with roughly 4,100 unbuilt cabinets in MB3 alone, and an operator actively buying more Mumbai land
What is already installed
Phase one plant for 1,370 cabinets in MB3, plus the acquired plant in MB1 and MB2
What comes next
MB3’s remaining halls to 5,475 cabinets, a fifth Mumbai building on land now being negotiated, and further Chennai phases
Specification driver
A global Equinix standard applied in India. Liquid-cooling readiness, Fabric connectivity and 99.999% uptime are all specified before a local requirement is considered
Land constraint
Chandivali is built up. The November 2024 purchase of 1.38 acres included an existing building, which tells you how little contiguous land is left in the sub-market
Why the buyer is attractive
A repeat purchaser with a disclosed multi-year India programme, not a one-off project company
Order window
MB3 fit-out and a fifth Mumbai building: 2027 onward
Procurement heat
Steady and premium. The hard part is the vendor list, not the opportunity
All estimates are labelled as estimates. No tender dates claimed, no private contact data published.
Unlock GridFeed →

Rows with a lock are the paid layer.

9Assumptions and method

What is sourced
Both acquisitions, all cabinet counts, both investment figures, the opening dates, the land transaction and its price, the site size and storey count, the customer and internet exchange counts, the Fabric capability, the cloud on-ramps, and the statement about further land talks
What is derived
Campus cabinet totals, all megawatt equivalents at a 5 kW per cabinet assumption, all cost per megawatt and per cabinet figures, and the share of the Mumbai market
Capacity figure used
None as a campus. The derived megawatts are shown for comparison only and are never added to Gridvik’s national total, because no building in this campus publishes a megawatt figure
Additivity rule
Not additive. Campus umbrella record, deliberately excluded from all totals to prevent double counting once individual buildings are recorded
Density assumption
5 kW per cabinet. Justification: this is the design density Equinix has published for its Chennai CN1 building, where 3.6 MW over 800 cabinets is 4.5 kW and 25 MW over 4,250 cabinets is 5.9 kW
Scope correction
The record’s original scope of MB1 to MB3 was incomplete. MB4 is identified and excluded, and this is stated rather than silent
Currency
₹88.40 to the US dollar, fixed quarterly

10Limits and open questions

The central gap
No megawatt figure from Equinix anywhere in this campus. Every megawatt on this page is derived and labelled
MB4
Identified but not recorded. Its capacity, opening date and role are not in this record
MB1 and MB2 separately
Only a combined figure of more than 1,350 cabinets is published. The split is not disclosed
Utilisation
Not disclosed for any building
Tenants
Not named. The customer count is given, not the list
Phase dates
MB3’s remaining phases have no published dates
The fifth building
Land talks are confirmed. No site, size, capacity or timing has been disclosed
What we will not claim
No megawatt as an operator figure, no MB4 capacity, no utilisation, no tenants, and no campus total presented as a published number

11Sources

This record was compiled entirely from publicly available sources, cross-checked against one another.

Equinix newsroom·Equinix India data centre pages·Equinix blog·DatacenterDynamics·The Hindu BusinessLine·LiveMint·Economic Times·Business Standard·CRE Matrix·Hindustan Times·W.Media·Data Centre News India·Construction World·Telecom Economic Times

Gridvik does not publish source URLs on record pages; citations are retained in the internal source register and are available on request.

What this page is, and what it is not

A campus record where the operator publishes cabinets and not megawatts, and where Gridvik’s own scope turned out to be missing a building. Both are stated.

Corrections are free and published with a date.