Sell to India's data centre boom — know when each project buys.

62 projects, one calendar. We track procurement windows, sanctioned load, and time-to-power so you quote at the right substation at the right month — not 12 months too early. Public-data-only, source-linked.

✓ $15–30K/yr Vendor Pipeline  ·  All rows source-linked  ·  Weekly diff  ·  Not investment advice
vendor-procurement-hero.png
VENDOR PIPELINE · LIVE
Why vendors pay for timing

Quoting too early costs more than quoting too late

Every month you wait for a substation that isn't sanctioned is a month your competitor is locking the next one. Gridvik tells you which of the 62 is actually moving this quarter.

📅

Procurement Calendar

For each of 62, we flag cooling, DG, UPS, fibre, substation, BMS windows — with confidence and last-checked date. No more "2 quarters before go-live" guess.

  • Sanctioned load + headroom → is power real?
  • Land possession → is site real?
  • Conf 1–3 → how sure are we?
📇

Contacts, not just companies

Where public, we link the press release + EPC award so your BD team knows who signed what. No private database scraping — public sources only, citable in your proposal.

  • 62 rows, every URL exact
  • Direct utility/DISCOM confirmation still required
⚡

Power Reality Filter

Filter by sanctioned load, headroom, grant disbursal, TTP — the 4 fields you can't scrape. The Power & Approvals Layer is the difference between a headline and a site you can energize.

See exact Power Layer fields →

What you get — Vendor Pipeline $15–30K/yr

Analyst-led pilot today (Dashboard/API in development) — a sheet + walkthrough. Hosted filters are planned and will be offered only after release is verified. All rows source-linked.

Live Tracker — filter to your SKU

ProjectStateProc. WindowSanctioned
Sify SiruseriTNQ1 2027 · Cooling45 MW · Conf 3
AdaniConneX Taloja (80MW ph1)MHQ3 2027 · Substation80 MW · Conf 3
STT Chennai 60MWTNQ4 2026 · Fibre20 MW headroom
Google Vizag (proposed)AP2028+ · LandAt own risk · HC

Sample — 4 of 62. Full sheet has 62 with source URL + verified_date + confidence. See 8-row free preview →

Pricing — fixed, invoiced in USD

Vendor Pipeline
$15–30K /yr
Procurement calendar (62) + power reality + contacts where public + weekly diff + 2 analyst calls.
  • Single team, unlimited viewers
  • pilot = sheet + walkthrough, hosted later
Get Fixed-Price Link →

We reply in 24h with hosted checkout (card never touches us). See Terms & Refund.

How vendors use it in a Monday pipeline review

1. Filter "Q1–Q2 2027 + Cooling + TN/MH" → 11 projects.
2. Sort by sanctioned load headroom "OK" → 6.
3. Check land possession "KIADB/MIDC ✓" → 3 to call this week.
That's the meeting.

Read: Power Bottleneck guide →
Power bottleneck — Gridvik

Built for BD heads, not just researchers

You don't need another market report. You need a date, a substation, and a URL you can put in your quote. That's what we sell.

Talk to us in 24h →Free: Power Readiness Index v0 →