Approved record · Verified 22 Oct 2026

RKD Construction — Cuttack, OdishaRKD Construction Private Limited · Cuttack district, Odisha · capacity undisclosed

Record PRJ-051Odisha — Cuttack districtTier C — approved only8 public sources cross-checked
Approved, not builtNo MW disclosedProject proposalDescribed as an edge facility
₹1,500cr
Approved
220
Jobs claimed
0
MW disclosed
23 Sep 2026
Approved
Cuttack
District
—
Schedule

RKD Construction Private Limited received Odisha’s approval on 23 September 2026 for a ₹1,500 crore data centre in Cuttack district, with 220 jobs claimed. It was one of four data centre and AI projects approved that day, and the smallest by a factor of nine. No capacity has been published. The state’s own project list, however, carries one descriptive detail that changes how the project should be read: it calls it a regional edge data processing facility, not a data centre campus.

1At a glance

Proponent
RKD Construction Private Limited. The company’s operating role in the data centre is not explained in any public document
Approved by
The 46th meeting of the Odisha high-level clearance authority, chaired by chief minister Mohan Charan Majhi, on 23 September 2026
Approved investment
₹1,500 crore, about $170 million at ₹88.40 to the dollar
Location
Cuttack district. The state also refers to it as Kataka, which is the Odia name for Cuttack
Description
A regional edge data processing facility, per the state clearance project list
Jobs claimed
220
Capacity disclosed
None. No megawatt, rack count, floor area or building count
Site
Not disclosed. No parcel, no acreage, no industrial estate named
Status
Approved. No land allotment, power sanction, design, construction or schedule
Additivity
Flagged unresolved. Contributes nothing to any total

2The one descriptive detail that matters

Every other record in this registry describes what is being built. This one, in the state’s own project list, describes what kind of thing it is: a regional edge data processing facility.

Campus against edge facility — why the label changes everything
Regional edge facilityData centre campus
Typical capacityUnder 5 MW, often 1 to 3 MW20 MW and above
Design intentGetting compute close to users, low latencyScale and efficiency
RedundancyOften N or N+1N+1, 2N or better
BuildingA floor or a single-storey hallMulti-storey, often phased over years
At ₹1,500 croreImplausible — far too much moneyPlausible for a mid-sized first phase

That creates a genuine puzzle rather than a resolution. ₹1,500 crore is too much for a small edge site and the right order of magnitude for a mid-sized data centre. The state’s description points one way and the money points the other.

One reading reconciles them: the ₹1,500 crore covers a portfolio of several edge sites in the district or region rather than one building, and the clearance is for the programme. That is common with edge deployments, which are uneconomic one at a time. No party has said so.

3What ₹1,500 crore could be

At Uttar Pradesh rates₹33 crore per MWabout 45 MWAt CtrlS Chennai rates₹56 crore per MWabout 27 MWAt HCLTech rates₹70 crore per MWabout 21 MWDisclosed for this projectno capacity publishedzeroThree plausible sizes, a two-to-one spread, no published answer. And the state’s own description suggests a different kind of facility entirely.
Figure 1Capacity implied by the approved investment at three published Indian build rates. All are arithmetic, none is a forecast, and the state’s own description suggests the true answer is smaller.

The comparison worth keeping is the one across the four approvals that day. The other three were ₹1,04,550 crore, ₹22,634 crore and ₹14,257 crore. This one was ₹1,500 crore, which is less than one and a half per cent of the total cleared in the meeting and about seven per cent of the smallest of the other three.

That is not a comment on the project’s merit. It is a comment on how the market reads approvals. Four data centre approvals in one state on one day, presented as a single number, are dominated entirely by one proposal — and the small ones, which are the ones that actually get built quickly, disappear in the reporting.

The honest read

A ₹1,500 crore state approval with no capacity, no site and no operator explanation is a very early stage project.

But small projects are the ones that commission. A single ₹1,500 crore facility is far more likely to be energised within three years than a 1 GW park, and the registry needs the small ones for exactly that reason.

4Timeline

  • The Odisha high-level clearance authority, at its 46th meeting, approves RKD Construction Private Limited’s ₹1,500 crore data centre in Cuttack district with 220 jobs claimed. It is the smallest of four data centre and AI approvals worth ₹1,42,941 crore that day.
  • Trade and state coverage repeats the value and the jobs figure. The state project list carries the description regional edge data processing facility. No capacity appears in any report
  • No capacity, site, land allotment, power sanction, design, contractor or schedule has been published

5What we refuse to invent

Why there is no capacity
Because none was published. The implied range above is arithmetic on published build rates, labelled as such, and is not carried into the registry
Why there is no site
No parcel, acreage or industrial estate is named. Cuttack district is a large area
Why there is no design section
No floor area, building count, redundancy standard, density, cooling architecture or PUE has been published
Why there is no power section
No connection, substation or allocation has been published
Why the operator is not identified
RKD Construction is a construction company and its role — developer, contractor, landlord or operator — is not explained in any public document
Why it is not marked edge or campus
Because the state’s description and the investment value point in different directions and Gridvik cannot resolve the conflict
What would change this page
A capacity figure, a named site, a power sanction, a construction start or a statement of what RKD will operate

6Limits and open questions

The central gap
No capacity, no site and no explanation of who will run it. Three unknowns on an approved ₹1,500 crore project
Capacity basis
Nothing published at all
The facility type
Described by the state as a regional edge data processing facility, which is not consistent with ₹1,500 crore for a single site
Company role
RKD Construction is a construction firm. Whether it intends to own, operate or simply build the facility is unstated
Site
Cuttack district only. No parcel
Partners and tenants
None named
What we will not claim
No capacity, no site, no operator role, no tenants, no schedule, and no characterisation of the facility as either edge or campus

7Sources

This record was compiled entirely from publicly available sources, cross-checked against one another.

Government of Odisha clearance·Business Standard·Economic Times Datacenters·Times of India·Kalinga TV·Voice & Data·Odisha TV·Outsource Accelerator

Gridvik does not publish source URLs on record pages; citations are retained in the internal source register and are available on request.

What this page is, and what it is not

A short record of a small approval with no capacity attached. It is published as short deliberately, because the public record contains almost nothing else.

Corrections are free and published with a date.