Anant Raj / Ashok Cloud — Manesar, Panchkula and RaiAnant Raj Cloud / Ashok Cloud · Haryana and Andhra Pradesh · 28 MW live, 357 MW targeted

Record PRJ-058Haryana — Manesar, Panchkula, Rai; plus Andhra PradeshTier A — operating and audited14 public sources cross-checkedAdditive: no
Live revenue357 MW is guidancePortfolio aggregateDemerger in progress
28MW
Operational
₹90cr
Q1 FY27 DC revenue
₹12.9cr
Revenue per MW per year
₹25,000cr
Haryana MoU
357MW
FY32 target
1:1
Demerger entitlement

Anant Raj is the only company in this registry that reports audited revenue from Indian data centre capacity, and that makes it the most useful record here even though it is not the largest. 28 MW is operational across Manesar and Panchkula. That capacity produced ₹90 crore of data centre and allied services revenue in the quarter to June 2026 — ₹12.9 crore of revenue per megawatt per year. Everything above 28 MW is company guidance: 63 MW by December 2026, 117 MW by FY28 and 357 MW by FY32, backed by a ₹25,000 crore Haryana MoU for 307 MW. The October news was a marketing MoU with Orange Business that carries no consideration, no joint venture and no capacity.

1At a glance

Operator
Anant Raj Cloud, the data centre and cloud arm of the listed Anant Raj Limited (NSE: ANANTRAJ). The business is being demerged into Ashok Cloud Private Limited
Platform name
Ashok Cloud, marketed in association with Orange Business, which has worked with the group on managed cloud services since 2024
Built capacity
28 MW of IT load: 21 MW at Manesar and 7 MW at Panchkula, as of FY26
Revenue
₹90 crore in data centre and allied services for Q1 FY27, the quarter to June 2026. Annualised, ₹360 crore
Revenue per megawatt
₹12.9 crore a year per MW of live IT load. Gridvik arithmetic from the two figures above
Announced capacity
63 MW by December 2026, 117 MW by FY28 and 357 MW by FY32 — 307 MW in Haryana across Manesar, Panchkula and Rai, plus 50 MW in Andhra Pradesh
Haryana MoU
₹25,000 crore, signed June 2026 under Make in Haryana, covering about 307 MW. That is ₹81.4 crore per announced megawatt
Andhra Pradesh
A 50 MW data centre and IT park under an APEDB MoU of 14 November 2025, about ₹4,500 crore in two phases. Site not identified in company filings
October event
A three-party MoU of 6 October 2026 between Anant Raj Cloud Singapore, Orange Business Services Singapore and the Haryana government. The exchange filing states no consideration, no shareholding arrangement and no joint venture
Corporate action
Board approved a composite scheme of arrangement on 21 July 2026 to demerge the data centre and cloud business into Ashok Cloud Private Limited, with a 1:1 share entitlement for existing shareholders
Additivity
No. This is a portfolio aggregate spanning sites and states. It is not summed with any facility-level record

2The number that matters: revenue per megawatt

Almost every record in this registry is a claim about the future. This one contains a measurement, and it is worth more than the other 240 rows.

28 MW of live capacity produced ₹90 crore of revenue in a quarter. Annualise that and it is ₹360 crore, which is ₹12.9 crore of revenue per megawatt per year. That is the realised yield on built Indian data centre capacity from a listed company, disclosed under SEBI rules, not a broker estimate.

What ₹12.9 crore a megawatt a year implies
TestResultReading
Annual revenue per MW₹12.86 croremeasured, from audited disclosure
Annual revenue at 357 MW, at today’s yieldabout ₹4,590 croreif every promised megawatt earns what the built ones earn
Company’s own forward rental expectation at 307 MW₹3,300 crore₹10.75 crore per MW — within 17% of the measured yield
Company’s FY32 revenue target from data centre and cloud₹9,000 croreimplies about ₹5,700 crore from services above the rental line
Gross payback at ₹81.4 crore a megawattabout 6.3 yearsbefore power, staff, interest, tax and downtime

Two things follow. First, the company’s own forward guidance is internally consistent: ₹3,300 crore of expected rentals across 307 MW works out at ₹10.75 crore a megawatt, which is close to what the built 28 MW actually earns. That is rare, and it means the pricing assumption in the Haryana programme is not fantasy.

Second, the FY32 revenue target of ₹9,000 crore cannot come from colocation alone. At ₹10.75 to ₹12.9 crore a megawatt, 357 MW of rental capacity supports roughly ₹3,800 to ₹4,600 crore. The remaining ₹4,400 to ₹5,200 crore has to come from cloud, GPU or managed services earning several times the rental yield per megawatt. That is the real bet in this company, and it is not a data centre bet at all.

For anyone pricing Indian capacity, ₹12.9 crore a megawatt a year is the anchor. Multiply by your own megawatts and you have a revenue line. Divide your build cost by it and you have a payback period.

Why this is the most valuable row in the registry

Everything else in these 242 records is an announcement. This is the only disclosed revenue figure attached to a disclosed built capacity, and it lets every other Indian data centre be valued instead of admired.

3357 MW against 28 MW

Operational today21 Manesar + 7 Panchkula28 MWTarget, December 2026company guidance63 MWTarget, FY28company guidance117 MWTarget, FY32307 Haryana + 50 Andhra Pradesh357 MWThe only bar that is audited is the first one. Everything above it is company guidance, and the gap to the top bar is 12.8 times today’s built capacity.
Figure 1The built bar and the promised bars. Every target above 28 MW is company guidance, and the top bar requires 12.8 times the capacity that exists today.

The trajectory is unusually specific for an Indian operator, which is to its credit. It is also unusually steep.

The stated path, and what each step requires
TargetCapacityAdded from todayImplied capital at ₹81.4 cr/MW
Today28 MW—already spent
December 202663 MW35 MW in about six monthsabout ₹2,850 crore
FY28117 MW89 MWabout ₹7,240 crore
FY32357 MW329 MWabout ₹26,780 crore

The December 2026 target is the one to test. Adding 35 MW of IT load in roughly six months is possible for a company with shells ready, and it is the kind of claim that either happens on schedule or quietly moves. The registry should be updated when the December number is reported.

The FY32 target of 357 MW implies almost ₹27,000 crore of capital, against a ₹25,000 crore Haryana MoU. Those two numbers are close enough to be the same plan, which is a good sign — the commitment and the capacity were built from the same arithmetic rather than from a headline.

4The October MoU that adds nothing

On 6 October 2026 Anant Raj Cloud Singapore, Orange Business Services Singapore and the Haryana government signed a three-party memorandum of understanding for global marketing of Ashok Cloud and onboarding of overseas customers. The BSE filing is explicit: no consideration, no shareholding arrangement and no joint venture.

What the MoU does and does not do
ItemPosition
Capacity addedNone
Money committedNone. The filing says no consideration
Equity or structureNone. No shareholding arrangement and no joint venture
What it actually isA marketing and customer-onboarding framework, with Orange Business exploring a technology-partner role covering architecture, AI hardware and technical expertise
Why it matters anywayOrange Business is a serious global enterprise channel. A marketing agreement with them is a cheap way to test whether Indian capacity can be sold to overseas buyers, which is the single biggest open question in the domestic market
What it is notevidence of capacity, capital or a new customer

This is worth spelling out because the announcement circulated as though it were an expansion. It was not. The 307 MW and the ₹25,000 crore were both already in the public domain from June 2026. The news was a channel partnership, and the honest description of a channel partnership is that it has no megawatts in it.

It is still strategically interesting. Indian data centre operators have built capacity largely for domestic enterprise and hyperscale demand. Selling into overseas enterprise through a global systems integrator is a different funnel and it is the one that could absorb the 200 MW planned at Rai. Whether it will is unknown, and the filing contains nothing that commits anyone to anything.

5What ₹25,000 crore buys in Haryana

The June 2026 Haryana MoU is the biggest number attached to this company and it deserves the same treatment as any other: divide it by the capacity and see if it holds.

₹25,000 crore against 307 MW
TestValueReading
Implied cost per MW₹81.4 croreabove the ₹52 to ₹70 crore band in this registry
Capacity at ₹52 crore a megawatt481 MWwhat the money would buy at the cheapest observed rate
Capacity at ₹70 crore a megawatt357 MWwhich is, almost exactly, the company’s own FY32 total
Likely reason for the premiumthe plan converts about 4 million square feet of existing commercial property into data centre space, so land and shell are inside the numberand existing buildings are rarely as efficient per megawatt as purpose-built halls
What it probably excludesIT equipment and cloud infrastructurewhich is where the ₹9,000 crore revenue target actually comes from

The conversion of existing commercial property is the genuinely distinctive part of this record. It is the fastest way to add capacity in India — a building exists, the land is owned, the approvals are mostly in place — and it is the reason 28 MW became 63 MW in a year rather than in four. It is also the reason the cost per megawatt is high: retrofitting a commercial floorplate for 5 to 10 kW racks costs more per megawatt than building a purpose-designed hall.

That has a direct procurement consequence. Retrofits buy in small, awkward packages: transformers that fit an existing riser, chillers that fit a plant room that was designed for air conditioning, and a great deal of electrical rework. They rarely buy a 300 MW campus package.

6The demerger into Ashok Cloud

This record will not exist in its current form for much longer, and that matters for anyone tracking it.

The corporate action
ItemDetail
ApprovedComposite scheme of arrangement approved by the board on 21 July 2026
What happensThe data centre and cloud business is demerged from Anant Raj Limited into Ashok Cloud Private Limited
Share entitlement1:1 — existing shareholders receive one Ashok Cloud share for each Anant Raj share
Why it mattersA separate listed vehicle for the data centre business would be valued on data centre multiples rather than on real estate multiples
StatusApproved by the board. Completion depends on shareholder, creditor, tribunal and regulatory approvals, and no completion date is in the public record reviewed
What changes in the registryThe operator name will change and the reporting entity will change. The capacity does not

The strategic logic is obvious and correct. Anant Raj trades at a real estate valuation. A pure data centre and cloud company with 28 MW live and a visible path to 357 MW would trade on a different multiple entirely. The demerger is a value-unlock exercise, and the 1:1 entitlement makes clear the group intends existing holders to own both.

What suppliers should note: after the demerger, the entity signing purchase orders will be Ashok Cloud, and its balance sheet will be new. The parent’s real estate cash flows will no longer be inside the same entity. Credit terms with a newly demerged operator deserve a fresh look.

7Timeline

  • Anant Raj Cloud signs an MoU with the Andhra Pradesh Economic Development Board for a 50 MW data centre and IT park, about ₹4,500 crore in two phases. No site is identified
  • The group signs an MoU with the Government of Haryana under Make in Haryana, committing ₹25,000 crore to data centre infrastructure covering about 307 MW of IT load across Manesar, Panchkula and Rai
  • The board approves a composite scheme of arrangement to demerge the data centre and cloud business into Ashok Cloud Private Limited with a 1:1 share entitlement
  • The BSE investor presentation sets the target at 357 MW of total IT load by FY32: 50 MW Manesar, 57 MW Panchkula, 200 MW Rai and 50 MW Andhra Pradesh, with 117 MW targeted to commence by FY28
  • Data centre and allied services revenue of ₹90 crore on 28 MW of operational capacity
  • Anant Raj Cloud Singapore, Orange Business Services Singapore and the Government of Haryana sign a marketing and customer-onboarding MoU. No consideration, no shareholding, no joint venture, no capacity
  • BSE filing under Regulation 30 discloses the MoU. Company shares trade at about ₹615
  • Q2 FY27 results were scheduled for 28 October 2026 and had not been published at the time of this record. The December 2026 63 MW target remains unverified

8Procurement

Procurement window and scope
Gridvik assessment · 26 Oct 2026
What is being bought
Retrofit electrical packages for existing commercial buildings plus new-build packages at Rai: transformers, MV switchgear, UPS, chillers, CRAC and CRAH units, BMS and EPMS, structured cabling, fire suppression
Why retrofits matter
About 4 million square feet of existing property is being converted. That is a different equipment profile from a greenfield campus and it favours vendors who can work inside occupied buildings and constrained risers
Cloud layer
Ashok Cloud runs in association with Orange Business. The cloud and GPU layer is a separate buying centre from the colocation shell
Likely window
Continuous. 35 MW is targeted by December 2026, then 54 MW more by FY28. This is one of the few records in the registry with a live order book rather than a date in 2029
Decision stage
Active. 28 MW operating, 35 MW in progress
Who to approach
Anant Raj Cloud, soon Ashok Cloud. A listed group with a disclosed investor-relations function, which makes it unusually easy to reach a named person
Quality of evidence
High. BSE and NSE filings, audited financials, a published investor presentation, plus trade press
Our confidence
High on built capacity and revenue. Low on the timing of anything above 63 MW
All estimates are labelled as estimates. No tender dates claimed, no private contact data published.
Unlock GridFeed →

9Assumptions and method

Every figure and where it comes from
FigureBasisConfidence
28 MW operationalCompany filings and Q2 FY26 disclosure: 21 MW Manesar, 7 MW PanchkulaHigh
₹90 crore Q1 FY27 revenueCompany disclosure, data centre and allied servicesHigh
₹12.86 crore revenue per MW per yearGridvik arithmetic: ₹90 crore × 4 ÷ 28 MWArithmetic on audited inputs
63 MW by December 2026Company guidanceGuidance only, and the nearest test
117 MW FY28 and 357 MW FY32BSE investor presentation, 11 August 2026Guidance only
₹25,000 crore Haryana MoUCompany disclosure, June 2026High as a commitment, not as deployed capital
₹81.4 crore per MWGridvik arithmetic: ₹25,000 crore ÷ 307 MWArithmetic
₹3,300 crore expected rentals at 307 MWCompany investor materialCompany estimate
₹9,000 crore FY32 revenue targetCompany disclosureCompany target
No consideration, no JVBSE filing, 7 October 2026, Annexure BHigh

10Limits and open questions

What Gridvik will not do
We will not attribute the 357 MW to any one site, sum it with other operators in the same building or city, or treat the ₹25,000 crore as spent. The record is non-additive
The question the market should ask
What happens to the ₹12.9 crore a megawatt yield when 357 MW is chasing the same customers? Indian colocation pricing has held because capacity has been scarce. A company adding 329 MW changes that
Second question
Where do the ₹9,000 crore of FY32 revenue come from? Roughly half must come from cloud and services, which requires GPU supply, enterprise sales capability and a channel. The Orange agreement is an attempt at the channel and it commits nothing
Third question
What does the demerged Ashok Cloud look like on day one? Its capital structure, debt and land ownership will determine whether it can fund 329 MW of additional build
Fourth question
Is the Andhra Pradesh site real? A 50 MW park worth ₹4,500 crore is in the plan and no district has been named in filings
Why this record matters
It is the only operating, audited, listed data centre business in the registry. Everything else is a promise; this is a business with a P&L, and that makes it the benchmark against which the promises should be priced

11Sources

Sources: Anant Raj BSE investor presentation, BSE Regulation 30 filings, NSE annual report FY2025-26, Anant Raj exchange disclosures, Economic Times, ETDatacenters, Equitybulls, Tradebrains, Whalesbook, Indian Infrastructure, Angel One, Screener, Business Upturn, Kalkine.