TCS HyperVault — Bharat Future City, HyderabadHyperVault AI Data Center Limited, a TCS subsidiary · 264 acres · up to 1 GW

Record PRJ-063Telangana — Bharat Future City, Hyderabad regionTier B — land secured, not built14 public sources cross-checkedAdditive: no
Money and MW agreeNot builtCampus proposalCeiling, not a cheque
1,000MW
Up to, at full build
264ac
Land secured
₹70,000cr
Investment ceiling
₹70cr
Per MW
170kW
Rack density stated
2 Jun 2028
State’s requested date

On 5 September 2026 HyperVault, the AI data centre subsidiary of TCS, announced it had secured 264 acres at Bharat Future City in Hyderabad for a campus of up to 1 GW, with up to ₹70,000 crore of investment from HyperVault and its partners. Divide one by the other and it is ₹70 crore a megawatt — exactly the top of the band at which Indian capacity has actually been built, which makes this the cleanest large number in the registry. Two things are more important than the headline. The committed equity is ₹18,000 crore from TCS and TPG, a quarter of the ceiling. And the design rack density is above 170 kW, which is the highest stated figure in the country and changes what this building is.

1At a glance

Operator
HyperVault AI Data Center Limited, a subsidiary of Tata Consultancy Services. Incorporated as a wholly owned subsidiary after a ₹7.5 crore capital infusion approved by the TCS board in October 2025 and formalised in December 2025
Capital partner
TPG, which committed alongside TCS in November 2025. Of the ₹18,000 crore, TCS contributes about ₹9,180 crore and TPG about ₹8,820 crore
Land
264 acres at Bharat Future City, Hyderabad region. Secured, per the company release
Capacity
Up to 1 GW at full build. IT versus facility basis is not specified. Phased, against customer demand
Investment
Up to ₹70,000 crore, about $7.92 billion at ₹88.40 to the dollar, described as HyperVault and its partners. A ceiling contingent on demand, not committed spend
Per megawatt
₹70 crore. The top of the ₹52 to ₹70 crore band observed across built Indian capacity
Rack density
Above 170 kW per rack, per the TCS executive quoted at the announcement. Direct-to-chip liquid cooling, large power blocks
Jobs
About 7,000 direct and indirect. The state IT minister separately described 7,000 direct and nearly 15,000 indirect
Schedule
No company schedule. Telangana’s chief minister asked for inauguration on 2 June 2028, chosen to coincide with Telangana Formation Day. Initial monetisation has been indicated as FY28
Design claims
Green energy and water-neutral design, high-density GPU deployments aimed at frontier AI companies and hyperscalers
Additivity
No. This is a site inside the 1 GW HyperVault programme already recorded, not additional to it. The OpenAI commitment is a separate customer record and neither is additive to this campus

2₹70 crore a megawatt — the number that holds

The registry contains many large rupee figures that fail their first division. This one passes, and the reason is worth understanding.

Committed equityTCS and TPG, November 2025₹18,000 cr1 GW at ₹52 cr a MWthe cheapest observed build rate₹52,000 cr1 GW at ₹70 cr a MWthe top of the observed band₹70,000 crThe headline is a ceiling that matches the top of the build band. The committed equity is 25.7% of it; the rest is debt raised phase by phase, against customers that do not yet exist.
Figure 1The ceiling against the build band and against the money actually committed. ₹70,000 crore is exactly what 1 GW costs at the top of the observed range, which suggests the number was built from an engineering plan.
The test, applied
TestResultReading
₹70,000 crore ÷ 1,000 MW₹70 crorethe top of the ₹52 to ₹70 crore band
What 1 GW costs at ₹52 crore a megawatt₹52,000 crorethe floor
What 1 GW costs at ₹70 crore a megawatt₹70,000 croreexactly the announced ceiling
Margin for GPUsnone inside the ceilingcompute would be a further multiple and is not in this figure
Conclusionthe rupee ceiling and the capacity were calculated togetherwhich almost no other announcement in this registry manages

Two caveats belong next to the praise. First, ₹70 crore a megawatt is the top of the band, which is where a campus with 170 kW racks should sit — the electrical and cooling plant per megawatt is far heavier than in a conventional hall. Second, the ceiling excludes the GPUs. A 1 GW AI campus with accelerators inside would cost several times ₹70,000 crore, and none of that is in the figure.

This is the counterpart to the SentraForge record at ₹188.6 crore a megawatt and the ReNew record at ₹93.3. Those are not worse projects; their rupee figures buy more than data halls. HyperVault’s figure buys a very expensive building and nothing else, which is what a data centre number should look like.

3₹18,000 crore inside ₹70,000 crore

The single most important caveat in this record is that the headline is a ceiling and the committed money is a quarter of it.

What is committed and what is contingent
ItemAmountStatus
TCS equity₹9,180 crorecommitted, November 2025
TPG equity₹8,820 crorecommitted, November 2025
Committed equity, total₹18,000 crore25.7% of the ceiling
Announced investment ceiling₹70,000 crorecontingent on customer demand, phased
Implied debt and partner capitalabout ₹52,000 crorenot committed, to be raised phase by phase
What that means per phaseroughly ₹18,000 crore of equity funds 250 MWat ₹70 crore a megawatt, before any debt

This is a normal and sensible structure for a data centre build. No operator funds 1 GW of speculative capacity from equity. What matters is that the market reads ₹70,000 crore as a commitment when the company has committed ₹18,000 crore and described the rest as dependent on demand.

There is also a strategic asymmetry worth noting. TCS is not a data centre operator by history — it is the largest Indian IT services company, with an existing business selling exactly the managed services that sit on top of this capacity. That gives HyperVault something no colocation developer has: a distribution channel that already sells to the world’s largest enterprises. It is also why the OpenAI relationship exists.

The risk sits in the same place. A captive channel can fill capacity, and it can also mean the capacity is priced internally rather than at market rates. No pricing, tenancy or utilisation has been disclosed.

41 GW at 170 kW a rack

Rack density is the number that separates an AI campus from a data centre with AI on the brochure. TCS has given a specific one, and it is the highest in this registry.

What 170 kW a rack implies
MeasureValueBasis
Stated design densityabove 170 kW a rackTCS executive at the announcement
Racks at 1 GWabout 5,8801,000,000 kW ÷ 170 kW
Racks at 1 GW, conventional 8 kW colo125,000the same capacity at 16 times the rack count
Coolingdirect-to-chip liquidstated. Air cannot remove 170 kW from a cabinet
What changes in the buildingcoolant distribution, high-amperage busway, heavier floor loading, closed-loop heat rejectiona different bill of materials from any Indian campus built before 2024
Floor areanot disclosed264 acres is the site, not the building
Comparable in this registryPDG MU2 at about 6.4 kW per square metre; CoreWeave Taloja at 100 to 160 kW a rack170 kW is at the top of the global range, not the Indian one

About 5,880 racks is the arithmetic that matters for anyone selling into this project. It is a small number of very large, very expensive racks, and it means the buying pattern is nothing like a colocation campus. Five thousand racks of conventional equipment is a procurement programme with dozens of suppliers. Five thousand liquid-cooled 170 kW racks is a handful of very large contracts.

The other detail in the record is the AMD collaboration announced in February 2026, covering an AI-ready rack-scale design on AMD’s Helios platform with a blueprint supporting up to 200 MW. That does not make AMD the exclusive silicon — the customer list is described as frontier AI companies and hyperscalers — but it tells you whose reference design the early phases are being drawn around.

5264 acres and a date the state chose

A 1 GW campus on 264 acres is a land-intensive object: 3.8 MW an acre, which is low-density by Indian standards and is what you get when you leave room for substations, water and phased shells on a big parcel.

The commitments, separated by who made them
CommitmentMade byStrength
264 acres securedHyperVault, in its own releasethe strongest item in the record
Up to 1 GWHyperVaulta design ceiling
Up to ₹70,000 croreHyperVault and partnersa ceiling contingent on demand
Inauguration on 2 June 2028Telangana chief minister, requested of TCSa state request, not a company commitment
7,000 direct and indirect jobsstate announcementa projection at full build
Green energy and water-neutral designHyperVaulta design claim with no generation, PPA or water source attached
Beat five competing statesTelangana officialsa competitive claim that cannot be verified

The date deserves particular care because of how it arose. 2 June 2028 was not announced by the company. It was requested by the chief minister at the meeting, and it coincides with Telangana Formation Day. A political date and an engineering date are different objects, and the record should show which one this is.

The project also has a Davos origin — discussions between the chief minister and Tata Sons chairman N Chandrasekaran in January 2026 — which tells you the state courting was at the highest level and that the land, rather than the capital, was the prize. Bharat Future City is a state-developed node, so the land is being provided as part of a wider urban plan rather than bought on the open market.

6Who the tenant is

This is the most consequential open question in the record, and part of the answer is already public.

What is known about demand
ItemPosition
Named customer relationshipOpenAI committed to 100 MW of HyperVault capacity under the Stargate initiative, announced February 2026. That is a customer commitment, not a building
Named anchor for HyderabadNone. The campus has not been pre-let and no tenant has been announced for any phase
Target customer typefrontier AI companies, hyperscalers and global enterprises, for training, inference and agentic workloads
ChannelTCS’s existing enterprise relationships and the ChatGPT Enterprise rollout across Tata companies
Phase 1 size and dateNot disclosed
Monetisation guidanceinitial monetisation indicated for FY28, meaningful contribution from FY29
Concentration riskif OpenAI is the anchor, one customer that has signed letters of intent rather than leases elsewhere sets the pace of the whole campus

A 1 GW campus does not get built on letters of intent. It gets built in tranches of 100 to 200 MW, each justified by a signed lease, and the public record does not contain one for this site.

The counterweight is that TCS is an unusually well-hedged developer. It has an existing services business that can fill capacity through its own contracts, a named AI customer in OpenAI, a design partnership with AMD and a balance sheet that can carry an empty phase through a soft quarter. Very few Indian data centre developers have any of those things.

The concentration to watch

100 MW of OpenAI demand inside a 1 GW campus means the campus is 10% pre-committed on a public relationship and 90% speculative.

That is not a criticism. It is the honest starting position for every large Indian AI campus in this registry, and the only one that has been stated plainly.

7Timeline

  • The TCS board approves a ₹7.5 crore capital infusion to create HyperVault AI Data Center Limited as a wholly owned subsidiary, formalised in December 2025
  • TCS and TPG commit up to ₹18,000 crore to fund the HyperVault AI data centre business, with TPG contributing up to ₹8,820 crore
  • Telangana chief minister A Revanth Reddy and Tata Sons chairman N Chandrasekaran discuss the project at the World Economic Forum in Davos
  • A collaboration with AMD is announced covering an AI-ready rack-scale design on the AMD Helios platform, with a blueprint supporting up to 200 MW. OpenAI commits to 100 MW of HyperVault capacity under Stargate
  • HyperVault announces 264 acres secured at Bharat Future City for a campus of up to 1 GW, with up to ₹70,000 crore of investment from HyperVault and partners, rack density above 170 kW, and about 7,000 jobs. The chief minister asks for inauguration on 2 June 2028
  • National and trade coverage, including Moneycontrol, ET, Reuters, Times of India and Newminute, reports the announcement. Telangana says it beat five other states
  • No phase size, phase date, EPC contractor, power sanction, water allocation, tenant or construction start is in the public domain

8Procurement

Procurement window and scope
Gridvik assessment · 26 Oct 2026
What will be bought
Liquid cooling at scale — coolant distribution units, manifolds, cold plates, high-ampacity busway — plus HV and MV substations, transformers, closed-loop heat rejection, BMS and EPMS, and DCIM built for 170 kW racks
Scale of the first phase
Not published. On comparable programmes a first phase of 100 to 200 MW is the norm, which on this specification is ₹7,000 to ₹14,000 crore of capital
Repeatability
Phased build against demand. A 1 GW design delivered in tranches is a repeatable package, and the vendor who wins phase one normally wins phase two
Likely window
No dates. A 2 June 2028 inauguration request implies ordering in 2027. The AMD design blueprint suggests the rack architecture is being set now
Decision stage
Design. Land secured, no construction start
Who to approach
HyperVault, with TCS group procurement and TPG governance behind it. A large corporate buyer with formal vendor processes — slow to enter, hard to displace
Quality of evidence
Strong on the announcement — a company press release, a state announcement and international wire coverage. Weak on engineering and phasing
Our confidence
High on 264 acres, the 1 GW ceiling and the ₹70,000 crore ceiling. Low on everything about phase one
All estimates are labelled as estimates. No tender dates claimed, no private contact data published.
Unlock GridFeed →

9Assumptions and method

Every figure and where it comes from
FigureBasisConfidence
264 acresHyperVault press release of 5 September 2026High
Up to 1 GWSame release. A design ceiling, phased against demandHigh as a ceiling
Up to ₹70,000 croreSame release, attributed to HyperVault and its partnersHigh as a ceiling, not as committed capital
₹70 crore per MWGridvik arithmetic: ₹70,000 crore ÷ 1,000 MWArithmetic
₹18,000 crore committed equityTCS and TPG announcement of November 2025, with TCS at ₹9,180 crore and TPG at ₹8,820 croreHigh
25.7%Gridvik arithmetic: ₹18,000 crore ÷ ₹70,000 croreArithmetic
above 170 kW a rackTCS executive, quoted in Newminute, 6 September 2026Statement, not a specification
about 5,880 racksGridvik arithmetic: 1,000,000 kW ÷ 170 kWArithmetic with a stated assumption
3.8 MW an acreGridvik arithmetic: 1,000 MW ÷ 264 acresArithmetic
2 June 2028Requested by the Telangana chief minister, not announced by the companyPolitical target
100 MW OpenAICustomer commitment of February 2026. Not a phase of this campusRecorded as a customer commitment

10Limits and open questions

What Gridvik will not do
We will not add 1 GW to the HyperVault programme record, attach the OpenAI 100 MW to a specific phase, treat 2 June 2028 as a company commitment, or record the ₹70,000 crore as committed capital. Nothing is built.
First question
What is phase one, in megawatts and rupees, and when does it start? Every other question is downstream
Second question
Who is the anchor? 100 MW of OpenAI demand is 10% of the campus and is a customer relationship rather than a lease on this site
Third question
Where does 1 GW of power come from? Green energy and water-neutral design are stated; no generation, transmission, water source or approval is public
Fourth question
Is 170 kW a rack the design average or the peak? It is the highest density claimed in the registry and it determines both the cooling contract and the capital cost
Why this record matters
It is the largest single AI data centre commitment by an Indian company, it is priced correctly against the build band, and it establishes 170 kW racks as the design reference for Indian AI capacity. It also shows what a real ceiling looks like next to a headline
What changes the tier
A phase one award, a construction start, a named tenant, a power sanction, or an EPC contract

11Sources

Sources: TCS press release of 5 September 2026, Telangana government announcement, Moneycontrol, Economic Times, Times of India, Reuters, The News Minute, Medianama, Analytics India Magazine, ICICI Direct, Progressive Robot, Elets eGov, Superpower Daily.