Nxtra MUM 2 — Airoli, Navi MumbaiNxtra by Airtel · Airoli, Navi Mumbai · 7 MW listed IT power, 1,100 racks

Record PRJ-069Maharashtra — Airoli, Navi MumbaiTier D — listed only6 public sources checkedAdditive: yes, within the Mumbai cluster
Stage unverifiedPrime micro-marketFacilityNo PUE or date
7MW
Listed IT power
1,100
Racks
6.4kW
Per rack
150MW
PDG MU1 design next door
71MW
Nxtra’s Mumbai cluster
—
Commissioning date

MUM 2 at Airoli is listed by Nxtra by Airtel at 7 MW of IT power across 1,100 racks — 6.4 kW a rack. Airoli and the adjoining Mahape belt is where India’s hyperscale money is currently going: PDG’s MU1 campus next door has about 50 MW live and is designed for 150 MW, an Equinix facility in Airoli Knowledge Park carries 48 MW, and NTT’s NAV1 is planned to 150 MW. A 7 MW building in that company is a legacy asset in the best possible location.

1At a glance

Operator
Nxtra Data Limited, the data centre subsidiary of Bharti Airtel
Facility
MUM 2, at Airoli in Navi Mumbai, on Digha MIDC Road
Listed capacity
7 MW of IT power across 1,100 racks
Density
6.4 kW a rack. Gridvik arithmetic from the two published figures
Carrier neutrality
Stated as carrier neutral
Status
Stage unverified. No commissioning date is stated on the card
Not disclosed
Commissioning date, floor area, PUE, tenant list and power source
Micro-market
Airoli, adjacent to Mahape and Ghansoli, is one of the largest concentrations of data centre investment in India
Additivity
Additive within Nxtra’s 71 MW Mumbai cluster. Not additive to the national platform aggregate

27 MW among 48 MW neighbours

The useful comparison here is not with other Nxtra buildings. It is with the neighbours.

The Airoli–Mahape micro-market, as reported
Operator and siteScaleStatus
PDG MU1, Airoliabout 50 MW live, 150 MW campus designoperating and expanding
Equinix, Airoli Knowledge Park48 MWoperating, reported to have a 220 kV substation with diverse feeds
NTT NAV1, Mahape–Airoli boundaryup to 150 MW across four planned buildingsbuilding, with a 45 MW first building reported live
AirTrunk (formerly Lumina), Airoli60 MW in two phasesin development
Nxtra MUM 2, Airoli7 MWlisted, stage unverified

Read that table as a supplier and the conclusion is immediate. This micro-market contains several hundred megawatts of operating and committed capacity, and Nxtra’s Airoli building is 7 MW of it — around 2% of the local total. The site is not where a capacity sale happens. It is where a relationship that can reach Nxtra’s 1 GW plan begins.

The strategic value of the location is real, though. An operator with a small legacy hall in Airoli holds land, a connection and a licence in a micro-market where land and connections are the binding constraints. That is why these buildings do not close even when they are small: the site is worth more than the plant on it.

3Why small legacy sites survive

A 7 MW building surrounded by 150 MW campuses looks like a candidate for replacement. Three things keep it in service.

The case for keeping it
ReasonExplanation
Latency and addressTenants who need to be in Airoli have limited choices, and an existing connection is unlikely to be re-let to a competitor
Network effectsCarrier-neutral buildings accumulate cross-connects. Every tenant that joins makes the building more valuable to the next one, and moving means re-establishing them
Approvals and powerA live connection in a constrained corridor is an asset that cannot be recreated quickly, whatever the building’s size
What erodes itThe neighbours are building at 11 kW and above per rack. At 6.4 kW this building cannot host the workloads now being ordered, which puts a ceiling on rent

The density point is the one to watch. Nxtra’s own newer halls at Mahape run at 11.3 and 11.7 kW a rack. This one runs at 6.4. Every generation of equipment since 2023 has made that gap more expensive to bridge, and the migration path for high-density tenants points at Mahape rather than here.

What a reseller should notice

A building at 6.4 kW a rack cannot sell to AI buyers. It can sell to everyone who is not an AI buyer, which in India in 2026 is still most of the market.

That is the honest state of the installed base, and it is why AI capacity commands a premium.

4Timeline

  • Airoli and Mahape become the centre of Navi Mumbai data centre development, with NTT, and later PDG, Equinix and others building large campuses
  • Hyperscale investment in the micro-market accelerates: PDG MU1 expands toward 150 MW, NTT builds NAV1, AirTrunk enters the corridor
  • The operator’s Mumbai page lists MUM 2 at 7 MW of IT power and 1,100 racks, carrier neutral, with no commissioning date
  • No stage change and no additional detail for this facility in the public record

5Procurement

Procurement window and scope
Gridvik assessment · 26 Oct 2026
What this site buys
Refresh, efficiency and incremental expansion at conventional density: cooling upgrades, containment, UPS, switchgear replacement, DCIM
What it will not buy
Liquid cooling or high-density power packages. The Mahape buildings are the ones specified for that
Account logic
Treat Airoli as a relationship site and Mahape as the buying site. They are about eight kilometres apart and belong to the same owner
Likely window
No published programme. The capital is being spent on new AI campuses in Mumbai, Chennai and Kolkata
Decision stage
Operating. No expansion programme evidenced
Quality of evidence
Medium. One operator card with two numbers, plus a well-documented surrounding market
Our confidence
High on 7 MW and 1,100 racks. Nil on date, PUE, occupancy and tenants
All estimates are labelled as estimates. No tender dates claimed, no private contact data published.
Unlock GridFeed →

6Limits and open questions

What this record is
A 7 MW, 1,100-rack facility in one of India’s prime data centre micro-markets
What it is not
Evidence of live load, a commission date, or a building capable of hosting current-generation AI workloads
What Gridvik will not do
We will not infer occupancy, publish a PUE, or describe the building as an AI facility because its neighbours are
The question worth asking
Does Nxtra intend to rebuild Airoli or let it run down while Mahape absorbs the demand? That decision, not the current capacity, determines whether this site buys anything again
Why it stays in the registry
Because the micro-market context is the most valuable thing on the page, and because small legacy halls are the majority of India’s installed capacity
What changes the tier
A commissioning statement, an expansion announcement, a PUE, or a redevelopment plan

7Sources

Sources: Nxtra Mumbai data centre page, Nxtra by Airtel site, DataCenterMap Mumbai listings, Baxtel facility records, Data Center Dynamics on NTT NAV1 and PDG MU1, Airtel FY26 annual report.