Facility record · Verified 26 Oct 2026

Nxtra NCR 2 — Sector 81, NoidaNxtra by Airtel · Sector 81, Noida, Delhi NCR · 3.5 MW listed IT power, 1,500 racks

Record PRJ-073Uttar Pradesh — Noida, Delhi NCRTier D — listed only5 public sources checkedAdditive: yes, within the NCR cluster
Stage unverifiedStage conflict with a broker sheetFacilityLowest density in the registry
3.5MW
Listed IT power
1,500
Racks
2.3kW
Per rack — the lowest here
6MW
A broker’s figure
26MW
Nxtra’s NCR cluster
—
Commissioning date

NCR 2 at Sector 81, Noida, is listed by Nxtra by Airtel at 3.5 MW of IT power across 1,500 racks — 2.3 kW a rack, which is the lowest density of any facility recorded in this registry. The same site appears in a broker listing at 6 MW and described as under construction, phase three. Neither the operator’s card nor the broker sheet says when it was built or how full it is, and the two disagree about both its size and its stage.

1At a glance

Operator
Nxtra Data Limited, the data centre subsidiary of Bharti Airtel
Facility
NCR 2, at Sector 81, Noida, in the Delhi National Capital Region. One directory places it at B-192, Block B, Phase 2
Listed capacity
3.5 MW of IT power across 1,500 racks
Density
2.3 kW a rack. The lowest in this registry
Carrier neutrality
Stated as carrier neutral
Status
Unresolved. The operator’s card states no stage. A broker listing describes the site as under construction at phase three
Not disclosed
Commissioning date, current load, tenant list, floor area and power source
Additivity
Additive within Nxtra’s 38.5 MW Delhi NCR cluster

22.3 kW a rack

Two and a third kilowatts a cabinet is not an unusual number in Indian colocation history. It is unusual to see it published next to a rack count in 2026.

Where this sits against the rest of the market
Reference pointkW a rackNote
Nxtra NCR 2, this record2.3the lowest in the registry
Nxtra NCR 13.6the operator’s other Noida legacy hall
A broker sheet for this siteup to 3.0stated maximum per cabinet
Nxtra MUM 4, Mahape11.7the operator’s most modern hall
PDG MU2, Navi Mumbaiimplied well above 206.4 kW per square metre across a five-storey building
TCS HyperVault, Hyderabad, claimedabove 170frontier AI design

At 2.3 kW a cabinet, power is not the constraint on this building — space is. A tenant needing 100 kW of IT load needs about 44 cabinets here, where the same load fits in nine at Mahape density. That reverses the usual Indian data centre economics, where power and cooling dominate and floor space is the thing operators have plenty of.

It also has a specific consequence for anyone valuing the asset. A hall that is space-constrained rather than power-constrained is a candidate for redevelopment rather than refurbishment: the value is in the land, the connection and the address, not in the racks.

The commercial read

A 2.3 kW a cabinet hall cannot be sold to any customer who is buying for AI, and there is no refurbishment that fixes it without rebuilding the cooling and power distribution entirely.

Its value is land, connection and location — which is exactly how operators end up selling these buildings or redeveloping them.

3The stage conflict

The capacity disagreement is minor. The stage disagreement is not, because it decides whether this building is an asset or a construction site.

What each source says about the same address
SourceCapacityStage
Operator’s Noida page3.5 MW, 1,500 racksnot stated
Broker capacity sheet6.00 MWunder construction, phase three
Facility directory1,500 rackslisted, no stage
Gridvik record3.5 MW, 1,500 racksstage unverified

Both readings are possible. A facility can be operating at 3.5 MW with a 6 MW build-out in progress, in which case the broker sheet describes a future state and the operator card describes today. Or the broker sheet is stale and the building completed years ago.

Gridvik records the operator’s numbers and the unresolved stage. What it does not do is pick the more attractive reading. The distinction matters commercially: an operating asset is a refresh opportunity, and a building site is a fit-out opportunity, and nobody should be quoting firm prices against the wrong one.

4Timeline

  • The operator’s Noida page lists NCR 2 at 3.5 MW of IT power and 1,500 racks, carrier neutral, with no commissioning status
  • A broker capacity sheet for the same address offers 6 MW and describes phase three as under construction
  • No commissioning date, occupancy figure or build-out confirmation has been published by the operator

5Limits and open questions

What this record is
A 3.5 MW, 1,500-rack card with the lowest density in the registry and a third-party claim of a larger expansion
What it is not
Evidence of live load, of a completed building, or of the 6 MW expansion the broker sheet describes
What Gridvik will not do
We will not adopt 6 MW, describe the building as under construction, or reconcile 3.5 against 6 without a company statement
The question worth asking
Is phase three real, and if it is, at what density? A 6 MW completion at modern density would be a materially different asset from a 3.5 MW legacy hall
Why it stays in the registry
Because it holds the density floor for the whole dataset, and the floor is informative
What changes the tier
A commissioning or construction statement from the operator, an occupancy figure, or a confirmed build-out programme

6Sources

Sources: Nxtra Noida data centre page, Nxtra by Airtel site, DataCenterMap Noida listings, Baxtel facility records, broker facility capacity sheet, Airtel FY26 annual report.