Facility record · Verified 26 Oct 2026

Nxtra BLR 2 — Hoskote, BengaluruNxtra by Airtel · Hoskote, Bengaluru · 14 MW listed IT power, 2,800 racks

Record PRJ-076Karnataka — Hoskote, BengaluruTier D — listed only8 public sources checkedAdditive: yes, within the Bengaluru cluster
Stage unverifiedInside a planned 500 MW parkFacilityPUE published
14MW
Listed IT power
2,800
Racks
5kW
Per rack
1.55
Declared PUE ceiling
500MW
Planned state park nearby
60MLD
Treated water offered

BLR 2 at Hoskote is listed by Nxtra by Airtel at 14 MW of IT power across 2,800 racks — 5 kW a rack, with a declared PUE below 1.55. What makes this building more interesting than its size is where it is. In April 2026 Karnataka announced three sustainable data parks totalling 1,000 MW, including 500 MW near Hoskote, with solar power supplied directly from the Pavagada park and 60 million litres a day of secondary treated water from the Bengaluru water board. The operator already had 20 MW in that corridor before the policy existed.

1At a glance

Operator
Nxtra Data Limited, the data centre subsidiary of Bharti Airtel
Facility
BLR 2 at Hoskote, on Whitefield Main Road, east of Bengaluru. One of two Nxtra buildings in the town
Listed capacity
14 MW of IT power across 2,800 racks
Density
5 kW a rack. Roughly double the operator’s Whitefield building and below its Mahape halls
Efficiency
Declared PUE below 1.55
Status
Stage unverified on the operator’s card. One directory describes a planned 450,000 square foot hyperscale campus at Hoskote with 5,000 racks and 40 MW, which does not match this card
Policy context
Hoskote is the site of a planned 500 MW sustainable data park announced by Karnataka in April 2026
Not disclosed
Commissioning date, occupancy, floor area for this building and tenant list
Additivity
Additive within Nxtra’s 45.4 MW Bengaluru cluster

25 kW a rack

This building sits almost exactly in the middle of the Indian density range, which makes it the most quotable facility in the registry.

Where 5 kW a rack sits
ReferencekW a rackEra
Nxtra BLR 2, this building5.0current mid-market standard
Nxtra BLR 1, Whitefield2.7first generation
Nxtra DC2, Bengaluru5.0same specification as this one
Nxtra MUM 4, Mahape11.7designed for accelerated computing
TCS HyperVault, claimedabove 170AI hall design

The published PUE of below 1.55 is worth noting next to the density. A 5 kW cabinet hall can be cooled efficiently and that shows in the number; the same operator’s 11.7 kW halls also declare 1.55. At this density, a PUE of 1.55 on 14 MW means roughly 7.7 MW of facility overhead — cooling, losses and everything else that is not the customer’s load.

Those two numbers together — 14 MW of IT and about 21.7 MW of facility load — are what a developer actually builds and what a utility actually connects. Any permit application, substation request or power purchase agreement for this site is sized on the second figure, not the first.

The conversion nobody publishes

IT load is what customers pay for. Facility load is what the grid supplies. At a PUE of 1.55 the difference is 55%.

When a state announces megawatts for a data park, it rarely says which of the two it means. In Hoskote’s case, the 500 MW has not been defined at all.

3Hoskote: the state’s chosen corridor

Karnataka made a decision in 2026 that will shape Bengaluru’s data centre map for a decade, and Hoskote is at the centre of it.

The April 2026 announcement
ItemDetail
What was announcedThree “sustainable” data parks with a combined capacity of 1,000 MW
The Bengaluru park500 MW near Hoskote
PowerSolar generated at the Pavagada solar park supplied directly to the facility
WaterThe Bengaluru Water Supply and Sewerage Board indicated it can supply 60 million litres a day of secondary treated water, with industries doing tertiary treatment
Other parks350 acres identified at Baikampady in Mangaluru; land to be identified in Mysuru
Who announced itA ministerial meeting attended by the energy, industries and IT-BT ministers
What was not announcedLand for the Bengaluru park, a developer, a timeline, or a definition of what the 500 MW measures

Six months later the state converted the announcement into policy: a Sustainable Data Centre Policy for 2026–31, approved in September 2026, targeting 1 GW of cumulative IT capacity by 2031, with a stated ambition of 10 to 12% of India’s AI-ready capacity and a budget framework of ₹1,300.45 crore. Land is offered on a 30 plus 30 year lease, with dual-grid connectivity and assured water.

Two details in the state’s own numbers are worth keeping. Officials put the investment required at about ₹70 crore per megawatt — which is precisely the top of the build band used throughout this registry, from a government source rather than an estimate. And the state counts its current installed capacity at about 400 MW across 32 data centres.

4What the park offers

For an operator, the value of a policy-supported park is not the land. It is the three things that actually delay Indian data centres: power, water and permits.

The three constraints, and what Hoskote does about them
ConstraintWhy it kills projectsWhat the state has offered
PowerA 100 MW hall needs a transmission-level connection and years of queueingSolar from Pavagada supplied directly, plus dual-grid connectivity proposed in the policy
WaterEvaporative cooling on a large campus can consume millions of litres a day, and Bengaluru has no surplus60 MLD of secondary treated water indicated, with tertiary treatment by the operator
PermitsLand conversion, environmental clearance and utility approvals run in seriesLand on a 30 plus 30 year lease, single-window support and efficiency-linked incentives

The water number deserves a sense of scale. Sixty million litres a day is 60,000 cubic metres. A well-run Indian campus using evaporative cooling consumes roughly 2 to 3 litres of water per kilowatt hour of IT load; at 500 MW of load running at 70%, that is around 20 to 30 million litres a day — inside the 60 MLD offered, but not with much room for a second park drawing on the same supply.

That is why non-evaporative cooling designs have started appearing in Indian projects, including at AdaniConneX’s Taloja campus for CoreWeave. Water availability is beginning to determine the cooling architecture, and in Hoskote it will determine how much of the 500 MW can actually be built.

5Timeline

  • Hoskote becomes Nxtra’s second Bengaluru location, with two buildings developed east of Whitefield on the highway towards Kolar
  • Karnataka announces three sustainable data parks totalling 1,000 MW, including 500 MW near Hoskote with solar from Pavagada and 60 MLD of treated water
  • The operator’s Bengaluru page lists BLR 2 at 14 MW of IT power across 2,800 racks with a declared PUE below 1.55, and BLR 3 alongside it at 6 MW
  • Karnataka approves its Sustainable Data Centre Policy for 2026–31: 1 GW of IT capacity by 2031, ₹1,300.45 crore framework, land on a 30 plus 30 year lease
  • No land, developer or timeline has been announced for the 500 MW Hoskote park, and no link between the park and this building has been stated

6Procurement

Procurement window and scope
Gridvik assessment · 26 Oct 2026
What this site buys
Mid-density infrastructure: efficient chillers, containment, UPS and switchgear at 5 kW cabinet ratings, DCIM, and increasingly water-efficient heat rejection
Why the site matters more than its size
It is one of only two Nxtra buildings in the corridor the state has chosen for 500 MW. Any future expansion here lands inside a supported park
Water and cooling
The 60 MLD allocation makes water-efficiency equipment a live purchasing category in this corridor, from treatment through to dry coolers and closed-loop systems
Likely window
No published programme for this building. The policy framework runs to 2031, so the corridor’s procurement is a multi-year story rather than a single award
Decision stage
Operating or near complete. No expansion evidenced
Quality of evidence
Medium. An operator card with three numbers, plus unusually strong state policy documentation for the corridor
Our confidence
High on 14 MW, 2,800 racks and PUE. Nil on commissioning date and on whether Nxtra is a participant in the planned park
All estimates are labelled as estimates. No tender dates claimed, no private contact data published.
Unlock GridFeed →

7Limits and open questions

What Gridvik will not do
We will not connect this building to the 500 MW state park, which is a land-use plan with no participant list, or adopt the 40 MW campus figure that a directory attaches to Hoskote
First question
Is Nxtra a participant in the planned Hoskote park? The operator already has 20 MW in the town and has not commented on the policy
Second question
Is the 500 MW a park-wide IT load, a facility load, or a land allocation expressed in megawatts? Karnataka has not said, and the difference is 55%
Third question
Will 60 MLD of treated water support 500 MW? On evaporative cooling, our arithmetic puts the requirement at 20 to 30 million litres a day, which fits but leaves little margin
Why this record matters
It is the only operator in the registry with live capacity inside a state-designated data park corridor, which makes it the natural test case for whether park policy accelerates anything
What changes the tier
A commissioning date, a park participation announcement, or a defined capacity for the park

8Sources

Sources: Nxtra Bengaluru data centre page, Nxtra by Airtel site, DataCenterMap Bangalore listings, DataCenterHawk, Karnataka government data park announcement, Economic Times, Moneycontrol, ETDatacenters, Deccan Herald, New Indian Express, Indian Express, Medianama on the Karnataka policy.