Nxtra BLR 3 — Hoskote, BengaluruNxtra by Airtel · Hoskote 2, Bengaluru · 6 MW listed IT power, 1,000 racks

Record PRJ-077Karnataka — Hoskote, BengaluruTier D — listed only6 public sources checkedAdditive: yes, within the Bengaluru cluster
Stage unverifiedDensest Bengaluru buildingFacilityPUE published
6MW
Listed IT power
1,000
Racks
6kW
Per rack
1.55
Declared PUE ceiling
20MW
Across the Hoskote pair
—
Commissioning date

BLR 3 at Hoskote is listed by Nxtra by Airtel at 6 MW of IT power across 1,000 racks — 6 kW a rack, with a declared PUE below 1.55. It is the smaller of two buildings on the same Hoskote site, and the denser of the two. Together the pair carry 20 MW across 3,800 racks, which makes Hoskote the larger of the operator’s two Bengaluru locations — in a town where the state now plans a 500 MW data park.

1At a glance

Operator
Nxtra Data Limited, the data centre subsidiary of Bharti Airtel
Facility
BLR 3, the second Nxtra building at Hoskote, east of Bengaluru
Listed capacity
6 MW of IT power across 1,000 racks
Density
6 kW a rack. The highest of the operator’s four Bengaluru buildings, and still half the density of its Mahape halls
Efficiency
Declared PUE below 1.55
Status
Stage unverified on the operator’s card. No commissioning date is stated
Not disclosed
Commissioning date, occupancy, floor area and tenant list
Additivity
Additive within Nxtra’s 45.4 MW Bengaluru cluster

26 kW a rack

The two Hoskote buildings are the clearest pair in the registry, because they sit on one site, under one operator, at almost the same time, with a measurable difference between them.

The Hoskote pair against the rest of Bengaluru
FacilityMWRackskW a rackPUE
BLR 3 — this building61,0006.0below 1.55
BLR 2 — Hoskote 1142,8005.0below 1.55
DC2204,0005.0below 1.55
BLR 1 — Whitefield5.42,0002.7not published

Six kilowatts against five is a 20% difference between two buildings on the same campus, which is small enough to be a specification choice rather than a generational change. Read across the four cards, though, and the pattern is consistent: every new Nxtra building outside Whitefield has landed between 5 and 6 kW a rack, while Whitefield sits at 2.7.

That cluster of numbers is itself the finding. The operator’s mainstream specification for a non-AI building is five to six kilowatts a cabinet. Its AI-grade halls at Mahape run at twice that. The gap between those two specifications is the gap between the capacity that exists and the capacity that AI demand is asking for.

The specification spread inside one company

2.7 kW at Whitefield. 5 to 6 kW at Hoskote and in the unnamed DC2 building. 11.5 kW at Mahape.

Three specifications, one operator, one country. Any single average across them is meaningless.

3The Hoskote pair

Two cards on one site are worth adding, because the sum is what a substation, a water allocation and a security perimeter are actually sized for.

Hoskote, end to end
MeasureBLR 2BLR 3Combined
IT power14 MW6 MW20 MW
Racks2,8001,0003,800
Average density5.0 kW6.0 kW5.3 kW
Facility load at PUE 1.55about 21.7 MWabout 9.3 MWabout 31 MW
Share of the Bengaluru cluster31%13%44%

Twenty megawatts of IT load means roughly 31 MW of facility load at the published PUE — which is the number the electricity connection, the transformers and the cooling plant are built to. That is a substantial site, and it is 44% of the operator’s Bengaluru capacity.

The location is the strategic point. Hoskote is where Karnataka announced a 500 MW sustainable data park in April 2026, with solar from Pavagada and 60 MLD of treated water. Nxtra already has 20 MW in that town and did not mention the park in any public statement. Whether that is luck, foresight or coincidence is unknown — and it is the most interesting open question on this page.

4Timeline

  • Nxtra develops two buildings at Hoskote, east of Whitefield, as its second Bengaluru location
  • Karnataka announces a 500 MW sustainable data park near Hoskote among three parks totalling 1,000 MW
  • Karnataka approves its Sustainable Data Centre Policy for 2026–31, targeting 1 GW of IT capacity by 2031
  • The operator lists BLR 3 at 6 MW across 1,000 racks with a declared PUE below 1.55
  • No commissioning date, occupancy figure or park participation statement has been published

5Limits and open questions

What this record is
A 6 MW, 1,000-rack building, the second on the Hoskote site, at the densest specification in Nxtra’s Bengaluru estate
What it is not
A dated commissioning, an occupancy figure, or evidence that the operator is part of the planned state park
What Gridvik will not do
We will not assume this building is newer than BLR 2 because its density is higher, or connect it to the state park without a company statement
The question worth asking
Were the two Hoskote buildings commissioned together as one campus, or in sequence? The answer decides whether this site has already been built out or has room to grow into the 500 MW policy
Why it stays in the registry
Because the pair gives a clean campus total and because the density difference between two adjacent buildings is the finest-grained evidence available on how specifications are changing
What changes the tier
A commissioning date, a campus build-out statement, or a park participation announcement

6Sources

Sources: Nxtra Bengaluru data centre page, Nxtra by Airtel site, DataCenterMap Bangalore listings, DataCenterHawk, Karnataka government data park announcements, ETDatacenters on the Karnataka policy.