Nxtra DC2 — BengaluruNxtra by Airtel · Bengaluru, locality not stated · 20 MW listed IT power, 4,000 racks

Record PRJ-078Karnataka — BengaluruTier D — listed only7 public sources checkedAdditive: yes, within the Bengaluru cluster
Stage unverifiedNo locality givenFacilityPUE published
20MW
Listed IT power
4,000
Racks
5kW
Per rack
1.55
Declared PUE ceiling
44%
Of Nxtra’s Bengaluru power
—
Locality stated

The largest building in Nxtra’s Bengaluru cluster is the one the operator describes least. DC2 is listed at 20 MW of IT power across 4,000 racks — 5 kW a rack, PUE below 1.55 — which is 44% of the operator’s 45.4 MW in the city. Its locality is not stated anywhere on the operator’s page, and directory listings attach a different project to the same name: a planned 450,000 square foot, 40 MW, 5,000-rack campus called Bengaluru II. Those numbers do not match this card, and no public source explains the difference.

1At a glance

Operator
Nxtra Data Limited, the data centre subsidiary of Bharti Airtel
Facility
DC2, in Bengaluru. The operator states no locality, sector or industrial estate
Listed capacity
20 MW of IT power across 4,000 racks
Density
5 kW a rack. Identical to the Hoskote building, and twice the Whitefield building
Efficiency
Declared PUE below 1.55
Position in cluster
The largest single building in Bengaluru at about 44% of the cluster’s power
Status
Stage unverified on the operator’s card. No commissioning date is stated
Naming
The operator calls this building DC2 while calling its Hoskote buildings BLR 2 and BLR 3, and directories attach the name Bengaluru II to a 40 MW project
Not disclosed
Locality, commissioning date, occupancy, floor area and tenant list
Additivity
Additive within Nxtra’s 45.4 MW Bengaluru cluster

220 MW and no address

Twenty megawatts is a large building. Not knowing where it is makes it hard to sell to, finance against or assess for water and power risk — and that is the whole point of recording it.

What is known and what is missing
ItemStatus
Capacity20 MW of IT power, stated
Rack count4,000, stated
Density5 kW a rack, derivable
PUEbelow 1.55, declared
CityBengaluru, stated
LocalityNot stated. Three other Nxtra Bengaluru buildings do have localities — Whitefield and two at Hoskote
Commissioning dateNot stated
OccupancyNot stated
TenantNot stated
Water sourceNot stated, in a city where water is the binding constraint on data centre growth

The water omission matters more in Bengaluru than anywhere else in the registry. Karnataka’s own data centre policy is built around treated water allocations — 60 MLD offered at Hoskote and hundreds of millions of litres discussed statewide — because freshwater in Bengaluru is scarce and contested. A 20 MW building consumes water for cooling regardless of where it is, and the public record does not say where this one draws it from.

There are three plausible readings of the silent locality. It is a building on one of the two existing sites that has been renamed. It is the planned Bengaluru II campus at an earlier stage of fit-out. Or it is a separate site the operator has chosen not to publicise. Gridvik records the capacity and the gap.

3Bengaluru against the rest of the platform

With four cards added, Bengaluru completes the picture of Nxtra’s large clusters — and reveals that this cluster is shaped differently from the others.

Mumbai71 MW across 6,900 racks71 MWPune49.5 MW across 8,750 racks49.5 MWChennai46 MW across four buildings46 MWBengaluru45.4 MW across 9,800 racks45.4 MWDelhi NCR38.5 MW across four cards38.5 MW250.4 MW across these five clusters, which is as much as the operator’s own national headline before a single edge site. Bengaluru has the most racks and the least power per rack.
Figure 1Five clusters, 250.4 MW. The remainder of the roughly 300 MW reported nationally sits in Hyderabad, Kolkata, Bhubaneswar and more than 120 edge sites.
The five clusters compared
ClusterMWRackskW a rackCharacter
Mumbai716,90010.3two modern AI-grade halls plus two legacy sites
Chennai46about 5,400 stated for one building5.0 at the largest hallcable hub, conventional density
Bengaluru45.49,8004.6many enterprise tenants, many racks, little power
Delhi NCR38.58,0504.8mature market, legacy density

The comparison is the useful output. Bengaluru and Delhi NCR run at about 4.5 kW a rack; Mumbai runs at 10.3. Same company, same country, and a factor of two in what a cabinet can carry. The difference is not technology — it is when the buildings were built and what the tenants in each city buy.

For anyone forecasting where Indian AI capacity will physically land, that table is a warning. The installed base in the two largest enterprise markets is structurally unable to host high-density tenancies without rebuilding. That is why new AI announcements keep appearing as greenfield campuses rather than as expansions of existing halls — there is nothing on the existing floors to expand.

4The 40 MW that is not this building

Directory listings describe a Bengaluru II campus of 40 MW across 5,000 racks in 450,000 square feet. The operator’s four cards total 45.4 MW across 9,800 racks for the entire city. Both statements are about Nxtra Bengaluru and they cannot both be right.

Three ways to read the numbers
ReadingWhat it would mean
The 40 MW is a future campusNxtra intends to build a single 40 MW building at Hoskote or elsewhere, taking the cluster toward 85 MW. The cards describe what exists today
The 40 MW is DC2 described differentlyThe largest card, at 20 MW, is half the 40 MW figure — which does not reconcile without an expansion
The 40 MW is staleAn earlier plan that was superseded by four smaller buildings totalling 45.4 MW

Gridvik records the four published cards and declines to adopt the 40 MW campus description. The registry’s number for Nxtra Bengaluru is 45.4 MW, and it will change only when the operator publishes a fifth card or a campus statement.

The wider lesson is one this registry keeps repeating. An operator’s own facility cards are the most reliable public source available, and even they do not reconcile with the descriptions in circulation. Anyone building a market model on directory data is building it on a stack of unresolved duplicates.

Why the address matters commercially

A 20 MW building with no stated locality cannot be assessed for grid capacity, water allocation or flood risk — three things that decide whether it can actually run at 20 MW.

It can still be sold to. It cannot be underwritten without asking the operator directly.

5Timeline

  • Nxtra develops its Bengaluru estate across Whitefield and Hoskote, adding buildings as enterprise demand grows
  • The operator lists a facility called DC2 at 20 MW across 4,000 racks with a declared PUE below 1.55 and no stated locality
  • Directory listings describe a planned Bengaluru II campus of 450,000 square feet, 5,000 racks and 40 MW, which does not reconcile with any single card
  • Karnataka announces 1,000 MW of sustainable data parks and then a Sustainable Data Centre Policy targeting 1 GW of IT capacity by 2031
  • No locality, commissioning date, occupancy figure or tenant name for DC2 in the public record

6Procurement

Procurement window and scope
Gridvik assessment · 26 Oct 2026
What this site buys
Mid-density infrastructure for 5 kW cabinets: efficient chillers, containment, UPS and switchgear, DCIM, and water treatment if the site is on treated supply
What it will not buy
Liquid cooling at scale. Five kilowatts a cabinet is air with containment, and that is the specification of two thirds of this operator’s installed base
Why the address gap matters here
Without a locality, a vendor cannot qualify the power connection, the water source or the surrounding infrastructure. The first sales conversation has to establish facts the operator has not published
Account structure
Nxtra’s national engineering and procurement function. Bengaluru is a mature cluster with no announced expansion, so expect refresh rather than new build
Likely window
Continuous refresh. The stated investment is going to AI campuses in Mumbai, Chennai and Kolkata
Quality of evidence
Weak for a building of this size. Three numbers, a PUE, and no address
Our confidence
High on 20 MW, 4,000 racks and PUE. Nil on location and stage
All estimates are labelled as estimates. No tender dates claimed, no private contact data published.
Unlock GridFeed →

7Limits and open questions

What this record is
The largest building in Nxtra’s Bengaluru cluster, at 20 MW across 4,000 racks, with no published locality
What it is not
A locatable asset, a dated commissioning, or evidence of the 40 MW campus that directories describe
What Gridvik will not do
We will not guess the locality, merge this card with the Bengaluru II campus description, or add 40 MW to the cluster
First question
Where is it? A 20 MW load has a substation, a water supply and a planning permission, all of which are public documents somewhere
Second question
Is the 40 MW campus real and separate? If it is, Nxtra Bengaluru is twice the size the cards show
Third question
What is the current load? At 5 kW a cabinet and 4,000 racks, this building defines the limit of what the operator can sell in a market increasingly buying density
Why this record matters
It completes the Bengaluru cluster and the four-cluster national picture, and it is the clearest example in the registry of a large asset with a thin public record
What changes the tier
A locality, a commissioning date, a fifth card, or a campus statement resolving the 40 MW question

8Sources

Sources: Nxtra Bengaluru data centre page, Nxtra by Airtel site, DataCenterMap Bangalore listings, DataCenterLocations, DataCenterHawk, Data Center Dynamics on Nxtra’s Karnataka facilities, Karnataka government data park and policy announcements.