Facility record · Verified 26 Oct 2026

Nxtra BBR 1 — BhubaneswarNxtra by Airtel · Plot E-13/1, Chandaka Industrial Estate, Bhubaneswar 751024 · 1.8 MW listed IT power, 500 racks

Record PRJ-085Odisha — BhubaneswarTier D — listed only8 public sources checkedAdditive: yes
Stage unverifiedCapacity conflict, 1 vs 1.8 MWFacilityNo PUE published
1.8MW
Listed IT power
500
Racks
3.6kW
Per rack
1MW
Figure in the press
6.8MW
Counted capacity, all Odisha
1,120MW
Announced in the state

BBR 1 in Bhubaneswar is listed by Nxtra by Airtel at 1.8 MW of IT power across 500 racks — 3.6 kW a rack, on the fourth floor of a building at Plot E-13/1 in the Chandaka Industrial Estate. It is the smallest card the operator publishes anywhere, and the only one that carries no efficiency figure while its siblings all declare a PUE. A national business daily described the same site as 1 MW in August 2026 — a 44% difference on a card of this size — and no public document explains which is right.

1At a glance

Operator
Nxtra Data Limited, the data centre subsidiary of Bharti Airtel
Facility
BBR 1, Plot E-13/1, Chandaka Industrial Estate, Bhubaneswar 751024. The operator’s page places its Bhubaneswar facility at Chandrashekarpur, a different part of the city from the listed address
Listed capacity
1.8 MW of IT power across 500 racks
Density
3.6 kW a rack
Efficiency
No PUE published on this card. The paired Kolkata card declares below 1.55, and every Noida, Pune, Bengaluru and Manesar card carries a figure
Physical form
A floor within a larger building in an industrial estate, not a purpose-built hall. Directory records place the facility on the fourth floor
Status
Stage unverified on the operator’s card. Directory listings describe the site as operational
Not disclosed
Commissioning date, current load, floor area, tenant list and water source
Additivity
Additive. Not to be confused with the CtrlS Bhubaneswar facility 670 metres away

2The smallest card

Eighteen hundred kilowatts is a small amount of data centre. The operator describes its Kolkata and Bhubaneswar sites together as a robust digital backbone for East India and the SAARC region, including Bangladesh, Bhutan and Nepal. One of the two buildings is 1.8 MW and sits on a floor of a building in an industrial estate.

Kolkata KOL 1 — New Town10 MW, 2,400 racks10 MWBhubaneswar BBR 1 — this building1.8 MW, 500 racks1.8 MWThe operator describes the pair as a digital backbone for the SAARC region. One of the two is 1.8 MW.
Figure 1Two East India cards. Kolkata carries 10 MW; Bhubaneswar carries 1.8. Together they are 11.8 MW across 2,900 racks.
Nxtra’s East India pair against the west
CardMWRackskW a rackPUE
Kolkata KOL 1102,4004.2below 1.55
Bhubaneswar BBR 11.85003.6none
Mumbai MUM 4, for comparison423,60011.7below 1.55

The comparison is not a criticism of the building. A 1.8 MW hall in a state with almost no commercial colocation is exactly what an early-stage market supports, and 500 racks at 3.6 kW is a sensible specification for government and enterprise workloads in a Tier-2 city.

What matters is the marketing-to-mass ratio. A facility this size supports a regional point of presence and a compliance story — data residency for a state government, latency for a local enterprise. It does not support a regional backbone for four countries, and no third party has audited the claim.

What a 1.8 MW site actually does

It gives a customer a legal location in Odisha, a local point of presence for a telecom network, and a second site for a small disaster recovery plan.

The claims around it are larger than the building. The building is what gets bought.

3One megawatt or 1.8

The card says 1.8 MW. A national business daily, writing about India’s data centre power constraints in August 2026, described Nxtra’s Bhubaneswar facility at 1 MW. On a card this small, the difference is 44%.

The figures in circulation
SourceWhat it says
The operator’s card1.8 MW of IT power, 500 racks, carrier neutral
A national business daily, 3 August 20261 MW
A directory record1.8 MW of total power
A second directoryplot E-13/1, fourth floor, 751024, operational

Three explanations fit and Gridvik does not choose between them. The press figure may be an earlier stage of the building. It may be a different basis — live load against designed capacity, or facility against IT power. Or it may simply be rounded down by a reporter working from a company statement rather than the website.

What is notable is the direction. Every other capacity conflict in this registry runs the other way: directories and press inflate, and the operator’s card is the conservative number. Here the press figure is lower, which is the one pattern that would suggest the card is aspirational rather than measured.

The absence of a PUE on this card and only this card reinforces the question. It is not evidence of anything — a missing field is a missing field — but a small building with no efficiency figure and a press number below its own card is the kind of record that deserves a phone call rather than an assumption.

4Odisha: 6.8 MW counted, 1,120 MW announced

The state in one table
MeasureCapacityNote
Counted capacity in this registry6.8 MWtwo commercial facilities: this one at 1.8 MW and a 5 MW CtrlS building
Announced in one memorandum1,000 MWa single ₹1,04,550 crore data centre commitment
Announced in another120 MWa sovereign AI facility announcement
Announced in a thirdno capacity statedan IT services AI centre and a Cuttack proposal
Odisha’s counted share of Indiaunder 0.3%of 2,420.4 MW counted nationally

The ratio is the story of eastern India. Odisha has 6.8 megawatts of counted capacity and more than 1,120 megawatts of announcements, one of which alone is 147 times everything that exists in the state.

That is not fraud and it is not unusual. It is what a market looks like when a state starts from nothing and offers land, power and incentives at the same time. The value of a facility-level registry in that environment is that it can state precisely where the line between built and promised falls, which no announcement ever does.

5Timeline

  • The operator develops a Bhubaneswar facility in the Chandaka Industrial Estate, listed as BBR 1
  • A 25 MW Kolkata facility is announced as the company’s first large-scale site in East India, to serve the east and SAARC markets
  • A national business daily describes the Bhubaneswar facility at 1 MW
  • The operator lists BBR 1 at 1.8 MW across 500 racks, with no PUE and no commissioning date
  • No document reconciles the 1 MW and 1.8 MW figures, and the state’s gigawatt-scale announcements have no construction record in the public domain

6Limits and open questions

What this record is
The operator’s smallest published facility, at 1.8 MW across 500 racks on a floor in an industrial estate in Bhubaneswar
What it is not
A regional backbone, a dated commissioning, or a building that has ever had its capacity verified by a third party
What Gridvik will not do
We will not adopt the 1 MW press figure over the 1.8 MW card, or the reverse. Both are recorded
First question
Is the fourth floor the whole facility, or is it one of several floors the operator has not described? A floor in a building is a different asset from a building
Second question
When was it commissioned? Odisha’s first commercial data centre is a fact with a date, and the operator has not published it
Third question
What happens to a 1.8 MW site when a gigawatt is announced in the same state? Either the small site becomes land value, or it becomes the anchor a larger build attaches to
Why this record matters
It is the low end of the operator’s portfolio and it is the only Nxtra card without an efficiency figure, which makes it the honest floor of the estate’s disclosures
What changes the tier
A commissioning date, a PUE, or an occupancy figure

7Sources

Sources: Nxtra Kolkata and Bhubaneswar data centre page, Nxtra by Airtel site, LiveMint report on India data centre power constraints, DataCenterMap Bhubaneswar listings, Baxtel Bhubaneswar listings, PeeringDB facility register, ocolo Bhubaneswar listings, Airtel press releases on East India.