Facility record · Verified 26 Oct 2026

CtrlS Kolkata DC 1 — New Town, KolkataCtrlS Datacenters · Action Area II, Bengal Silicon Valley, New Town, Kolkata 700157 · 16 MW IT load, 1,137 racks

Record PRJ-090West Bengal — New Town, KolkataTier B — operator listed, dated10 public sources checkedAdditive: no — inside the campus aggregate
Operational since Aug 2025PUE 1.40 publishedFacilityThree field conflicts
16MW
IT load
1,137
Racks
14.1kW
Per rack — highest in registry
1.40
Published PUE
₹370cr
Phase one investment
Aug 2025
Opened

Kolkata DC 1 opened on 12 August 2025 with 16 MW of IT load across 1,137 racks — 14.1 kW a rack — and a published PUE of 1.40. That combination makes it the densest and most efficient building in this registry, and it is in New Town, Kolkata, not Mumbai. Eastern India’s first Rated-4 data centre was built for ₹370 crore in a phase that took roughly a year, and the operator says its first customer was an American hyperscaler.

1At a glance

Operator
CtrlS Datacenters Limited
Facility
Kolkata DC 1, Action Area II, Bengal Silicon Valley, New Town, Kolkata 700157
Listed capacity
16 MW of IT load across 1,137 racks
Density
14.1 kW a rack — the highest of any confirmed facility in this registry
Efficiency
PUE 1.40, published by the operator. The lowest figure any operator in this file states; most publish 1.5 or 1.55
Construction
About ₹370 crore reported for phase one; a G+2 building with a technical floor, roughly 44,000 square feet of built-up area
Certification
Rated-4, the first in eastern India. LEED Platinum targeted. Nine-zone security, N+N power feeds, Seismic Zone 3 compliant
Status
Operational since 12 August 2025. The building has a date, which most records in this file do not
Additivity
Not additive. It sits inside the 60 MW campus aggregate recorded as PRJ-089 — see that page for why this is a defect

214 kW a rack in Kolkata

This is the number that makes the page worth reading. Everything else about the building is ordinary; fourteen kilowatts a cabinet is not.

CtrlS Kolkata DC 116 MW, 1,137 racks14.1 kWNxtra Mumbai MUM 442 MW, 3,600 racks11.7 kWNxtra Pune PUN 424 MW, 2,500 racks9.6 kWCtrlS Patna Edge DC 211.6 MW, 1,670 racks7.2 kWNxtra NCR 2 Noida 813.5 MW, 1,500 racks2.3 kWThe highest confirmed rack density in this registry is an eastern India edge facility, not a Mumbai hyperscale hall.
Figure 1Confirmed facilities, by rack density. Fourteen kilowatts is three times the median of this registry.
Where 14.1 kW sits
FacilityMWRackskW a rackCity
CtrlS Kolkata DC 1161,13714.1Kolkata
Nxtra Mumbai MUM 4423,60011.7Mumbai
Nxtra Pune PUN 4242,5009.6Pune
CtrlS Patna Edge DC 211.61,6707.2Patna
Nxtra Bengaluru BLR 15.42,0002.7Bengaluru
Nxtra NCR 2 Noida 813.51,5002.3Noida

The implication is not that Kolkata is an AI hub. It is that the operator built a single, dense, new building with a specification that will survive the next five years of rack power, while the incumbents’ legacy halls run at a fifth of that density and cannot be converted.

For anyone selling cooling, power distribution or DCIM, the ranking above is a call list in order of technical ambition. For anyone buying the intelligence, it is the correction to a lazy assumption: dense capacity is appearing in tier-2 eastern India as well as in the Mumbai and Chennai corridors.

The efficiency figure is the real outlier

Most Indian operators publish a PUE of 1.5 or 1.55. This one publishes 1.40, at a site with 16 MW of load and a tropical climate.

At 16 MW, the 0.1 difference between 1.40 and 1.50 is 1.6 MW of continuous overhead — about 14 GWh a year, and a meaningful line in an electricity bill.

3The building and the three conflicts

The operator describes its own building three different ways depending on which page you land on. None of the differences is large; all of them matter to a valuation.

One building, two operator pages
FieldThe inauguration materialThe corporate site
Racks1,1371,044
StructureG+2 with a technical floorG+1 with a terrace
Security zonesnine-zoneeight-zone
Built-up areaabout 44,000 sq ft0.44 lakh sq ft, in agreement
IT load16 MW16 MW, in agreement
PUE1.40not stated

Ninety-three racks is the gap on cabinet count — about 8% — and the structural difference of one floor is consistent with it: either the building has an additional floor that was value-engineered out, or the corporate page was written before the final design. Both figures are live on the operator’s own site today.

An earlier announcement put the phase-one building at over 90,000 square feet. The built area now quoted is 44,000. That is a bigger discrepancy than the rack count and it points at the same thing: a specification that changed between the 2024 announcement and the 2025 opening.

Gridvik records the inauguration figures — 16 MW, 1,137 racks, PUE 1.40 — because they are the most recent and the most specific, and notes that the operator’s own site disagrees with itself. A buyer who needs 1,100 cabinets and finds 1,044 available has lost a month.

4How a phase gets built in a year

The timeline that actually happened
WhenWhat
2022five acres allotted at Bengal Silicon Valley on a 99-year lease
2023construction begins after registrations
June 2024the ₹2,200 crore campus and the 16 MW first phase are announced publicly; the building is described as over 90,000 square feet and due to go live within months
12 August 2025the building opens at 16 MW, 1,137 racks and a PUE of 1.40
2026the Digha subsea landing station is expected to become operational, improving international routes

Roughly eighteen months from announcement to a live 16 MW building on state-leased land is fast for India and it is the strongest argument in this registry that eastern India is not a difficult place to build. The constraint is demand, not construction.

The reported first customer was an “American giant”, which is consistent with a Rated-4 building sold whole or nearly whole. A single hyperscale anchor changes what a building is: white space, contract length and rate card all stop being market questions and become private ones.

5Timeline

  • Land allotted on a 99-year lease at Bengal Silicon Valley
  • Construction begins on the first building
  • A ₹2,200 crore, four-phase, 60 MW-plus campus is announced, with 16 MW due to open in the second quarter of the financial year
  • DC 1 opens at 16 MW of IT load and 1,137 racks with a PUE of 1.40 and Rated-4 certification
  • The operator’s corporate site shows 1,044 racks, G+1 with a terrace, and eight-zone security
  • No occupancy disclosure, no customer name beyond “an American giant”, and no phase-two start date

6Procurement

Procurement window and scope
Gridvik assessment · 26 Oct 2026
What this building needed
A complete dense specification in one go: 14 kW per rack containment, high-efficiency cooling sized for a PUE of 1.40, N+N feeds, nine-zone security and DCIM
What it will need next
Density at the top end and any move toward direct-to-chip. At 14.1 kW a rack and a published 1.40, further efficiency has to come from the IT side or from liquid
Why it is the eastern India reference site
It is the first, the densest and the only Rated-4 building in the region, and the three phases behind it will be procured against this specification
Account structure
CtrlS buys centrally from Hyderabad; the Kolkata regional chief executive sits on the ground
Likely window
Phase two, when it is announced. Nothing is scheduled, and three phases remain
Quality of evidence
Better than most of this registry — a date, a PUE, a rack count and a certification. The operator’s own site contradicts it on three fields
Our confidence
High on 16 MW and the August 2025 opening. Medium on 1,137 racks, which the corporate site gives as 1,044
All estimates are labelled as estimates. No tender dates claimed, no private contact data published.
Unlock GridFeed →

7Limits and open questions

What this record is
A dated, operating, Rated-4 building at 16 MW with the highest confirmed rack density and the lowest published PUE in this registry
What it is not
A proven AI facility. Fourteen kilowatts a cabinet is dense for enterprise work and a fraction of what accelerated racks now ask for
What Gridvik will not do
We will not pick between 1,137 and 1,044 racks, or between G+2 and G+1, without a third source from the operator
First question
Who is the American anchor tenant, and how much of the 16 MW does it hold? If one customer has taken the building, the rate card is private and the second phase depends on that relationship rather than on the market
Second question
Is the PUE of 1.40 measured or designed? A designed figure is an engineering target; a measured one is a different claim and only one of them can be audited
Third question
What happens to a 44,000 square foot building when the specification moves to 100 kW a rack? The same question applies to every dense hall built today, and Kolkata has the most to lose because it started from a single floorplate
Why this record matters
It is the most complete facility record in the file — operator, date, capacity, racks, efficiency and certification — and it corrects the assumption that India’s dense capacity sits only in Mumbai and Chennai
What changes the tier
A measured PUE, an occupancy figure, a customer name, or a phase-two start date

8Sources

Sources: CtrlS Datacenters press release on the Kolkata inauguration, CtrlS Kolkata data centre page, CtrlS corporate site, Data Center Dynamics on the first phase going operational, Times of India, Business Standard, ETTelecom, TelecomTalk, Indian Infrastructure, DataCenterMap Kolkata listings.