CtrlS Hyderabad DC 1 has 1,152 racks across 191,749 square feet and, depending on which page of the operator’s own website you read, either 4 MW or 6 MW of power. It was built in 2008 in HITEC City and is the oldest large data centre in this registry — the building the company calls India’s first Rated-4 facility. The disagreement about its power is not a scandal. It is an ordinary consequence of a seventeen-year-old asset sitting behind a modern web page, and it is the reason this page exists.
1At a glance
2Four megawatts or six
The same company publishes two power figures for the same building, and one of them appears in its own press releases.
| Page | Racks | Power | Labelled as |
|---|---|---|---|
| Hyderabad data centre page | 1,152 | 6 MW | power capacity |
| Colocation page | 1,152 | 4 MW | power capacity |
| Press material cited by directories | 1,152 | 4 MW | IT capacity |
| A company sub-page for the same site | 1,400 | 6 MW | power capacity |
| PeeringDB, 2024 | 1,152 | 4 MW | power capacity |
The gap is 50% and it moves the density of the building from 3.5 to 5.2 kW a rack. Racks and floor area agree across every source; only the power moves. That is the signature of a document problem rather than a physical one — most likely a 4 MW IT figure being replaced by a 6 MW figure that includes electrical infrastructure, without the older number being retired everywhere.
A 2008 building with 1,152 racks and a six-zone security standard is not a competitive asset in 2026. It is a legacy asset in one of the best-connected locations in the country, and its value is the location and the customer contracts rather than the electrical capacity. Which power figure is right determines whether it can grow at all.
Every market forecast built on operator capacity cards inherits this kind of error. A 2 MW discrepancy on one building is nothing; the same pattern across a portfolio is a 10% error in a national number.
The registry publishes both figures and refuses to pick one.
3A 2008 building in 2026
Seventeen years is the full working life of an electrical topology. What was specified for a 2008 enterprise customer cannot be re-specified for an AI tenant without rebuilding the switchgear, the UPS plant and the cooling distribution.
| DC 1 | DC 2 | DC 3 | |
|---|---|---|---|
| Built | 2008 | 2020 | 2024 |
| District | HITEC City | Gachibowli | Gachibowli |
| Racks | 1,152 | 720 | 3,500 on the card |
| Power | 4 to 6 MW | 7.4 MW | 13 MW |
| Floor area | 191,749 sq ft | 82,262 sq ft | 130,000 sq ft |
| Power per square foot | 21 to 31 W | 90 W | 100 W |
| Security zones | six | nine | nine |
Read the power-per-square-foot row. The 2008 building delivers between 21 and 31 watts a square foot; the 2020 and 2024 buildings deliver 90 and 100. That is a three-to-four-fold change in what the same floor area can do, and it is the cleanest measure of why old data centres are worth less than their location.
The comparison also explains the company’s strategy. CtrlS is not retrofitting HITEC City. It is building at Chandanvelly, forty acres 30 kilometres out, for 600 to 700 MW, with a 400 kV grid connection and a 700 MVA sanction. The three city buildings total 26.4 MW together, which is 4% of that one campus plan.
4Timeline
- CtrlS is founded in Hyderabad
- DC 1 opens in HITEC City and is described as India’s first Rated-4 data centre
- DC 2 opens in Gachibowli at 7.4 MW across 720 racks
- DC 3 opens at 13 MW; the company says it operates three Hyderabad facilities and 250 MW nationally
- The operator publishes 6 MW for DC 1 on one page and 4 MW on another
- No IT load, PUE or occupancy for DC 1 in the public record
5Procurement
6Limits and open questions
7Sources
Sources: CtrlS Hyderabad data centre page, CtrlS colocation page, CtrlS corporate site and a company sub-page for the site, PeeringDB facility register, Data Center Dynamics on CtrlS in Hyderabad, Baxtel Hyderabad listings, datacenterlocations, dcmarketinsights.