CtrlS publishes its first two Navi Mumbai buildings as a single card: 40 MW of power capacity across 5,555 racks and 394,177 square feet. That is 7.2 kW a rack and 101 watts a square foot — the least dense card on the campus and, as it happens, the only one where nobody outside the company can say which building holds what. A directory splits the pair as 20 MW and 16 MW. A 2020 press release described DC 2 alone at 24 MW across 1,800 racks. All three cannot be right, and the operator has published only one of them.
1At a glance
2Why two buildings share one card
Operators combine buildings on a card for sensible reasons: one substation, one security perimeter, one sales team, one set of redundancy claims. The cost is that the reader cannot size either half.
| Question a reader would ask | Answer available |
|---|---|
| How much power does DC 1 have? | not published separately |
| How many racks does DC 2 have? | not published separately |
| Which building is denser? | unknown — the 7.2 kW is an average of both |
| Which one has spare capacity today? | unknown |
| When was each commissioned? | DC 2 in 2019; DC 1 not stated on the card |
Other sources fill the gap inconsistently. A market commentary splits the pair as DC 1 at 20 MW over 200,000 square feet and DC 2 at 16 MW. A directory carries the pair at 36 MW combined. A 2020 company release described the second building at 24 MW installed across 1,800 racks and 132,000 square feet.
Note what that does to the arithmetic. If DC 2 were 24 MW in 2020 and the pair is 40 MW now, DC 1 is 16 MW. If DC 2 is 16 MW, DC 1 is 24 MW. The two readings are exact opposites, and both sum to a number that is close to a published figure. That is how a plausible error becomes permanent.
40 MW, 5,555 racks and 394,177 square feet for the pair, because that is the only statement the owner of the buildings makes.
We do not split it, and we flag every page that depends on the split as unverified.
37.2 kW a rack
Seventy-two hundred watts a cabinet is the specification of an Indian data centre designed between 2015 and 2019. It is a perfectly serviceable enterprise density and it is half of what the same operator is now building next door.
| Card | Power | Racks | kW a rack | W per sq ft |
|---|---|---|---|---|
| DC 4 | 36.8 MW | 2,936 | 12.5 | 139 |
| DC 5 | 32 MW | 2,750 | 11.6 | 140 |
| DC 3 | 10 MW | 1,045 | 9.6 | 68 |
| DC 1 and DC 2 | 40 MW | 5,555 | 7.2 | 101 |
The bottom row carries the most power of any card and the least density. That combination is exactly what a 2015 to 2019 build looks like: large floorplates, a great many cabinets, and an electrical design from before anyone asked for 12 kW a rack.
For a buyer of capacity this is the cheap end of the market and the right place to look for large-volume, low-density workloads — batch processing, storage, disaster recovery, government systems. For a vendor it is a refresh queue of 5,555 cabinets that will never be as valuable as the ones in DC 4 and DC 5.
4The Mahape node
These buildings sit in the densest data centre cluster in India. Mahape and Airoli, with Rabale and Ghansoli, hold more megawatts within a few square kilometres than most Indian states hold within their borders.
| Neighbour | Capacity | Note |
|---|---|---|
| CtrlS, this campus | 40 MW in these two buildings; 116 MW across five | the anchor of the node |
| An NTT hyperscale campus at Mahape | a 150 MW campus plan, phase one 90 MW across two buildings | 45 MW operating in the first building |
| An ST Telemedia three-building campus | about 120 MW when complete | the incumbent rival for enterprise demand |
| A CapitaLand greenfield site | announced, with a declared PUE of 1.4 | the newest entrant |
| A 40 MW building under construction nearby | a new operator breaking ground in 2026 | the pipeline responding to demand |
The node is the argument. Cable landing stations, the Mumbai fibre ecosystem, a workforce and a state government that has been generous with power all sit inside one industrial belt, which is why four operators with 40 to 150 MW plans are all building in it.
The constraint is land and grid, not demand, and that is why the operator behind this page went 40 kilometres north to a 13-building campus instead of adding buildings at Mahape.
5Timeline
- The first Navi Mumbai building enters service as the company’s anchor facility
- DC 2 is launched; a later company release describes it at 24 MW across 1,800 racks and 132,000 square feet
- The pair is certified and marketed as a Tier-4 standard campus with more than 5,000 racks
- The operator publishes the pair as one card at 40 MW, 5,555 racks and 394,177 square feet
- No published split of capacity between the two buildings, and no IT-load basis for the 40 MW
6Procurement
7Limits and open questions
8Sources
Sources: CtrlS Mumbai data centre page, CtrlS corporate site, CtrlS datacenters page, Data Center Dynamics on the campus build, Baxtel Navi Mumbai listings, datacenterlocations, dcmarketinsights, and Indian market commentary on the Navi Mumbai data centre nodes.