CtrlS Mumbai DC 5 is listed at 32 MW of power capacity across 2,750 racks and 228,482 square feet — 11.6 kW a rack, 140 watts a square foot and 83 square feet per cabinet, the tightest floor plan on the campus. With DC 4 it forms a newer pair that carries 68.8 MW — 58% of the estate’s built power — on 46% of its racks. The two original buildings carry the same number of cabinets as the new pair and 40% less power. That is the whole story of Indian colocation in two rows.
1At a glance
2Two eras of one estate
The two pairs on this campus are the cleanest before-and-after in the registry, because they share an operator, a location and a grid connection.
| Measure | DC 1 and DC 2 | DC 4 and DC 5 | Change |
|---|---|---|---|
| Power | 40 MW | 68.8 MW | +72% |
| Racks | 5,555 | 5,686 | +2% |
| Power per rack | 7.2 kW | 12.1 kW | +68% |
| Floor area | 394,177 sq ft | 493,482 sq ft | +25% |
| Watts per sq ft | 101 W | 139 W | +38% |
| Share of built campus power | 34% | 58% | +24 points |
Seventy-two per cent more power on two per cent more cabinets. The floor area grew by a quarter, so this is not simply a bigger building — it is a denser one, and the density is what makes it able to sell to a market that now asks for 10 to 15 kW a cabinet.
The original pair is not obsolete. It is a 5,555-cabinet hall that will keep earning from storage, disaster recovery and enterprise workloads for another decade. But the split in value is stark: 34% of the power earns from three quarters of the cabinets in one pair, and 58% of the power earns from a third of the cabinets in the other. Which pair a buyer would rather own is not a close question.
Same operator, same campus, same grid connection: 7.2 kW a rack in buildings from 2015 to 2019 and 12.1 kW a rack in the ones after.
That is the market’s real rate of change — about 1 kW per cabinet per year — and it is far slower than the AI narrative implies.
383 square feet a rack
| Card | Floor area | Racks | Sq ft a rack |
|---|---|---|---|
| DC 5 | 228,482 | 2,750 | 83 |
| DC 4 | 265,000 | 2,936 | 90 |
| DC 1 and DC 2 | 394,177 | 5,555 | 71 |
| DC 3 | 146,000 | 1,045 | 140 |
Eighty-three square feet a cabinet is tight — roughly two square metres of feet of building per rack, including aisles, walls, plant and circulation. That is what a modern Indian hall looks like, and it is the reason the campus can reach 700 MW on three million square feet.
The original pair is tighter still at 71 square feet a rack, because a low-density hall can stack cabinets closer together. The outlier is DC 3 at 140, which is the roomiest card on the estate by a factor of two and the one the operator would have to work hardest to fill with modern workloads.
4The four cards, reconciled
| Card | Power | Racks | kW a rack | W per sq ft |
|---|---|---|---|---|
| DC 1 and DC 2 | 40 MW | 5,555 | 7.2 | 101 |
| DC 3 | 10 MW | 1,045 | 9.6 | 68 |
| DC 4 | 36.8 MW | 2,936 | 12.5 | 139 |
| DC 5 | 32 MW | 2,750 | 11.6 | 140 |
| Total of the cards | 118.8 MW | 12,286 | 9.7 | 115 |
| Five operating buildings, per a July 2026 report | 116 MW | — | — | — |
The 2.8 MW between the card sum and the reported operating figure is 2.4% and it has no published explanation. Two candidates: one card includes planned capacity within a building that is not yet fully commissioned, or the trade report rounded. Neither is worth chasing on its own; at the ₹121 crore per operating megawatt that the company’s June 2026 round implies, however, 2.8 MW is ₹340 crore of valuation.
That is the reason this registry keeps both numbers rather than picking one. A discrepancy that looks like rounding in a capacity table becomes a nine-figure question in a valuation.
5Timeline
- The original pair enters service at 7.2 kW a rack
- DC 3, DC 4 and DC 5 are added, taking the campus to 118.8 MW on its cards
- Grid capacity at the campus substation doubles to 300 MW, with headroom to 700 MW
- The campus completes a 125 MW captive solar farm at Nagpur covering about 60% of its energy
- The operator lists DC 5 at 32 MW, 2,750 racks and 228,482 square feet
- No commissioning date, PUE or occupancy for this building in the public record
6Procurement
7Limits and open questions
8Sources