Facility record · Verified 26 Oct 2026

CtrlS Mumbai DC 6 — Navi MumbaiCtrlS Datacenters · Navi Mumbai campus · upcoming, capacity not disclosed

Record PRJ-100Maharashtra — Navi MumbaiTier E — named only5 public sources checkedAdditive: unknown — counts 0 MW
Capacity not disclosedPlannedFacilityPlaceholder record
0MW
Disclosed capacity
95MW
Card it sits beside, unnamed
486MW
Unallocated in the campus claim
13
Buildings planned on the campus
5
Buildings already named and built
0
Dates published for this one

DC 6 exists in public as a building name and nothing else. CtrlS lists it as upcoming on the Navi Mumbai campus and attaches no capacity, no rack count, no floor area and no date to it. The only number a reader can pair with it is an unnamed 95 MW card on the same page, which does not name the building either — recorded separately as PRJ-099. This registry carries DC 6 at zero megawatts. That is not a judgement about the building. It is a statement about what the operator has published.

1At a glance

Operator
CtrlS Datacenters Limited
Facility
DC 6, Navi Mumbai campus. Listed as upcoming
Disclosed capacity
None. The operator page allocates no capacity to this building or to DC 7
Racks and floor area
Not disclosed
Dates
None. No start, no completion, no target
Sibling
DC 7, also upcoming, also with nothing attached — PRJ-101
The number nearby
An unnamed 95 MW card with 8,000 racks and 1,250,000 square feet that names no building — PRJ-099
Status
Planned. Not operational, not under construction per any public source
Additivity
Unknown. Counted at 0 MW until a source attaches a number to this building

2A building name with no number

Most thin records in this registry are thin because the operator said one number and stopped. This one is thinner than that: there is no number to argue about.

What is disclosed about DC 6
QuestionPublic answer
How much power?not disclosed
How many racks?not disclosed
How much floor area?not disclosed
When does it open?not disclosed
Is it under construction?not stated — the page calls it upcoming
Which half of the 95 MW is it?not stated
Who designs or builds it?not disclosed
What is confirmed?The building exists as a plan, on a campus with five live buildings and a 700 MW ultimate claim

One row of that table is confirmed. Everything else is empty, and the page is published anyway because the empty rows are the finding: a 95 MW card sits in the same section of the same page without being attached to this building. If the operator cannot pair its own figures with its own buildings, no buyer can.

Why this is a record and not a deletion

Thin records get published here when the thinness is informative. DC 6 tells you that CtrlS is willing to name a building before it is willing to size it, and that the Mumbai pipeline is being described in aggregates rather than buildings.

It also tells you the campus is not sold building by building. Which is useful, because capacity buyers ask building by building.

3Where the 700 MW actually stands

Of the 700 MW CtrlS claims for the finished Mumbai campus, about one sixth is built and named. This is how the three pieces divide.

Unallocated — six unnamed buildingsthe remainder of the 700 MW claim486.2 MWDC 1 to DC 5 — named and builtfive cards, 12,286 racks118.8 MWDC 6 and DC 7 — this building and the nextno capacity attached to either95 MWOne hundred and nineteen megawatts are named and built. Ninety-five are claimed for two upcoming buildings. Four hundred and eighty-six are a pledge with no buildings behind them yet.
Figure 1The campus claim split three ways. Navy is built and named. Red is the upcoming pair this building belongs to, with no per-building figure. Grey is the rest of the 700 MW, with no buildings attached at all.
The three pieces of 700 megawatts
PieceMegawattsBuildingsBacked by
Named and built118.85four operator cards with racks and floor area
Upcoming pair, this record and DC 7952one unnamed card
Unallocated486.26a pledge

Four hundred and eighty-six megawatts is 69% of the campus claim and it is attached to nothing — no building numbers, no phases, no dates. That is the honest reading of "700 MW": a target for an estate whose remaining two thirds has not been designed in public.

For anyone buying Mumbai capacity in the next three years, the useful figure is not 700. It is 118.8 MW built, plus 95 MW at the ceiling of what the two upcoming buildings could hold — and even that 95 is the number this record cannot confirm.

4Procurement

Procurement window and scope
Gridvik assessment · 22 Oct 2026
What to buy here
A per-building capacity schedule for DC 6 and DC 7, or confirmation that no schedule exists
Who holds the answer
CtrlS capacity sales, Navi Mumbai campus
The one question
What capacity, rack count and delivery date are attached to DC 6 specifically
Why they will answer it
An unnamed 95 MW card cannot be sold. Buyers sign for buildings
Gridvik estimate
DC 6 is part of the 95 MW pair and will land near the campus density of 10 to 12 kW a rack. Labelled an estimate, not a fact
What changes it
Any per-building figure, a construction start, or a pre-lease announcement
All estimates are labelled as estimates. No tender dates claimed, no private contact data published.
Unlock GridFeed →

5Limits and open questions

  • No capacity, no racks, no area, no dates. Every one of those is absent from the public record, not merely disputed.
  • No stage evidence. "Upcoming" is a page label, not a construction report.
  • Sibling undistinguished. Nothing separates DC 6 from DC 7 in any public material.
  • Campus arithmetic is contested. The 700 MW, 13-building, 30,000-rack claim is a target; only 118.8 MW of it is backed by building cards.
  • What would close it. A single building card. One line would take this record from tier E to tier C.

6Sources

Sources: CtrlS Mumbai data centre page, CtrlS corporate site, CtrlS homepage, Data Center Dynamics on the Mumbai campus build, dcmarketinsights, Baxtel Navi Mumbai listings.