STT GDC Mumbai 2 — Mumbai citySTT GDC India · Mumbai · 1 MW, smallest building in the 133 MW city portfolio

Record PRJ-110Maharashtra — Mumbai cityTier C — single operator source4 public sources checkedAdditive: no — inside the 133 MW portfolio
Reconciles into the portfolioSmallest record, largest lessonFacility0.75% of the portfolio
1MW
Listed capacity
0.75%
Of the 133 MW headline
133→132
Headline without it
1
Building, one card
0
Racks published
0
Dates published

STT GDC Mumbai 2 is 1 MW. It is the smallest data centre record in this registry apart from a half-megawatt edge site in Patna, and it is a real building that reconciles exactly into the company’s 133 MW Mumbai headline. Delete it and the headline becomes 132 MW — a change of 0.8%. That is the whole lesson of this page: portfolio numbers are quoted as if every megawatt inside them were supply, and the smallest buildings are the ones that make the aggregate look complete without adding anything a tenant can buy.

1At a glance

Operator
STT GDC India
Facility
Mumbai 2, Mumbai city
Capacity
1 MW, basis unstated
Position
Smallest of six buildings in the 133 MW Mumbai and Navi Mumbai portfolio
Implied size
Roughly 100 to 200 cabinets at city densities, or fifteen to thirty thousand square feet of building
Racks, floor area, PUE
None published
Status
Stage unverified. No date, no stage, no occupancy
Additivity
Not additive. Counted at 0 MW

2One megawatt is a suite

For context on what a single megawatt is: it is a small number of cabinets, and in an Indian market where 250 MW parks are being announced, it is nearly invisible.

One megawatt, bracketed
Assumed densityCabinetsWhat that looks like
5 kW a rack200a small hall, enterprise and storage
8 kW a rack125two rows of contained aisle
12 kW a rack83one aisle of accelerated compute at most

A single megawatt cannot host a hyperscale tenant, cannot host a GPU cluster of any consequence, and cannot be sold as a growth path. It can host one enterprise customer with a redundancy requirement.

Which makes it a perfectly sensible building to own — as a connectivity anchor, as a lease on a site that may redevelop, or as a tenant relationship. It is not sensible to count in a supply forecast.

3What 1 MW does to a headline

The portfolio arithmetic is exact and published. What it conceals is the range inside it.

The headline as publishedsix building cards133 MWWithout Mumbai 2five building cards132 MWNavi Mumbai onlythree buildings119 MWMumbai 2 — this recordone building, one megawatt1 MWRemoving an entire building from the portfolio changes the headline by 0.8%. That is the arithmetic of small assets inside big aggregates.
Figure 1The 133 MW headline, and what changes if the smallest building is removed. A whole building, 0.8% of the number that gets quoted.
The range inside one aggregate
MeasureFigureReads as
Headline133 MWthe number in market reports
Without Mumbai 2132 MWstatistically identical
Largest building49 MW37% of the portfolio in one asset
Smallest building1 MW0.75% of the portfolio in one asset
Ratio49 to 1the headline averages two things that share nothing
Navi Mumbai share119 MW89% of the portfolio is in three buildings

This is not a criticism of STT, whose aggregate is the only one in this registry that reconciles at all. It is a warning about how aggregates get used. A market report quoting "133 MW in Mumbai" is quoting a sum whose largest member is 49 times its smallest, and whose composition nobody outside the company can see.

The rule this page exists to make

A portfolio total is not supply. It is a sum of assets with different ages, different densities, different customers and different remaining lives.

When this registry reports a portfolio, it reports the cards underneath it. That is the only way the number stays useful after the first month.

4Procurement

Procurement window and scope
Gridvik assessment · 22 Oct 2026
What to buy here
Whether a 1 MW city suite is available at all — and if so, what it costs against Navi Mumbai
Who holds the answer
STT GDC India commercial team
The one question
Is Mumbai 2 being actively leased, and is it held for a specific anchor tenant
Why they will answer it
Small city capacity usually has one obvious occupant, and the team knows whether it is free
Gridvik estimate
The suite is single-tenant and occupied, held for connectivity rather than revenue. Labelled an estimate
What changes it
A cabinet count, a PUE, or a statement that the site is being retired
All estimates are labelled as estimates. No tender dates claimed, no private contact data published.
Unlock GridFeed →

5Limits and open questions

  • Nothing but a number. One megawatt, one name, no basis, no racks, no date.
  • Single source. No directory lists a 1 MW STT Mumbai site separately.
  • Risk of double counting in third-party lists. Small cards like this are sometimes counted both as a facility and inside a city headline. This registry counts neither.
  • Purpose unknown. It may be a live commercial suite, a connectivity anchor or a leased site awaiting redevelopment. The public record does not say.
  • What would close it. One line from the operator. This is the cheapest record in the file to complete.

6Sources

Sources: STT GDC India Mumbai city page, STT GDC India corporate site, STT GDC facility pages, and Indian market commentary on Mumbai data centre capacity.