STT GDC Navi Mumbai 2 — MaharashtraSTT GDC India · Navi Mumbai · 49 MW, largest building in the 133 MW portfolio

Record PRJ-113Maharashtra — Navi MumbaiTier C — single operator source4 public sources checkedAdditive: no — inside the 133 MW portfolio
Reconciles into the portfolioLargest asset, thinnest recordFacility36.8% of the portfolio
49MW
Listed capacity
36.8%
Of the 133 MW headline
3.5×
The whole Mumbai city tail
49×
The smallest city building
9,800
Racks at 5 kW, if it were that dense
0
Racks published

STT GDC Navi Mumbai 2 is 49 MW — 36.8% of the company’s 133 MW Mumbai portfolio sits in this one building. It is 3.5 times the entire three-building Mumbai city portfolio and 49 times the smallest building in it. It is also described in public by one number and nothing else: no basis, no rack count, no PUE, no stage, no date. That combination is the point of this page. The largest asset in an Indian data centre portfolio is routinely the least documented, because the operator has no need to market a building that is already full.

1At a glance

Operator
STT GDC India
Facility
Navi Mumbai 2
Capacity
49 MW, basis unstated
Position
Largest of six buildings in the 133 MW portfolio, at 36.8%
Against the city tail
3.5× the entire Mumbai city portfolio of 14 MW
Against the smallest
49× Mumbai 2 at 1 MW
Racks, floor area, PUE
None published
Status
Stage unverified. No date, no stage, no occupancy
Additivity
Not additive. Counted at 0 MW

2Concentration in one building

Portfolio risk in Indian data centres is usually discussed at company level. It is really a question about single buildings.

Navi Mumbai 2 — this record49 MW in a single asset49 MWAll three Mumbai city buildings4 + 1 + 9 MW14 MWMumbai 2the smallest building in the portfolio1 MWOne Navi Mumbai building is three and a half times the entire Mumbai city portfolio, and forty-nine times its smallest member.
Figure 1This building against the entire Mumbai city tail. One asset on the left, three on the right.
What 49 MW of concentration means
MeasureFigureReads as
Share of the portfolio36.8%one building, more than a third of the company
Share of Navi Mumbai41.2%of the 119 MW suburban base
Share of Mumbai city, by contrast6.8%the largest city building is a seventh of this one
Two largest buildings91 MW68.4% of the portfolio in two assets
Buildings needed for half the portfolio2concentration, not diversification
Basis published for the largest assetnonethe biggest number has the least support

For a tenant this is a straightforward dependency question: if your capacity is in this building, your availability is the building’s availability, and the portfolio around it does not help you. For an investor it is a valuation question, because 37% of a portfolio’s capacity in one asset is a single point of failure in the numbers as well as the power train.

None of this is unusual. Indian data centre capacity is concentrated in a handful of very large halls, and every operator’s portfolio looks like this. It matters because portfolio totals are quoted as if the capacity were distributed.

3What 49 MW would hold

The building is large enough that the density assumption changes its commercial identity completely.

Bracketing 49 MW
Assumed densityRacksFloor area at 100 W a sq ftWhat it is
5 kW a rack9,800about 490,000 sq fta large enterprise colocation hall
8 kW a rack6,125about 490,000 sq fta current-generation market build
12 kW a rack4,083about 490,000 sq ftan AI-capable hall, if it has the cooling

Somewhere around half a million square feet and four to ten thousand cabinets, depending entirely on a design decision nobody has published. At the low end this is one of the largest enterprise colocation buildings in India. At the high end it is one of the few buildings in the country that could take a serious accelerated-compute deployment.

Both readings are consistent with a single published figure of 49 MW. That is why a capacity number alone is not intelligence.

4Why the biggest asset is the thinnest record

There is a pattern in this file: the buildings with the most detail are the ones being marketed, and the buildings with the most megawatts are the ones with none.

Detail against size, across the STT Mumbai portfolio
BuildingMWRacksPUEBasisStage
Navi Mumbai 249nononono
Navi Mumbai 342nononono
Navi Mumbai 128nononono
Mumbai 39nononono
Mumbai 14nononono
Mumbai 21nononono

Six buildings, six blanks. In this case the uniformity is the finding: STT publishes a capacity per building and nothing else per building, across the whole Indian portfolio. The 400 MW Palava campus gets a groundbreaking and a land parcel; the 49 MW building that carries a third of the company gets a number on a page.

CtrlS shows the same pattern in a different form — its most-described site is the one with the most unusual number (36.8 MW at Mumbai DC 4), and its largest claim (700 MW at Chandanvelly) has no building at all.

What this means for anyone buying Indian data

Marketing effort and asset size are inversely correlated. The pages with the most detail are the newest and emptiest buildings; the buildings that are full publish a number and move on.

So reading operator sites top-down gives you a picture of the pipeline and almost none of the operating base.

5Procurement

Procurement window and scope
Gridvik assessment · 22 Oct 2026
What to buy here
Whether 49 MW of Navi Mumbai capacity is available at all, and at what density
Who holds the answer
STT GDC India commercial team
The one question
What is the design density per cabinet in this building, and how much capacity is contracted past 2028
Why they will answer it
It is the largest single asset in the estate and the first building any serious tenant is shown
Gridvik estimate
The building is substantially let to large tenants and is the anchor of the portfolio. Labelled an estimate
What changes it
A rack count, a PUE, or a design density
All estimates are labelled as estimates. No tender dates claimed, no private contact data published.
Unlock GridFeed →

6Limits and open questions

  • No basis. 49 MW is unlabelled IT or gross, and the difference is roughly a third of the building.
  • No racks, floor area, PUE or stage. Five of the eight questions this registry asks are unanswered.
  • Single source. Only the operator page carries the figure.
  • No tenant information. Who occupies a third of this portfolio is not public.
  • Concentration risk is inferred, not stated. The 36.8% is arithmetic from published cards, not an operator disclosure.
  • What would close it. A design density and a basis. Two figures would turn the largest building in this portfolio into the most useful record in it.