Get Free Teaser
Facility record · Verified 26 Oct 2026

STT GDC Navi Mumbai 4 — MaharashtraSTT GDC India · Navi Mumbai · 36 MW under development, outside the 133 MW portfolio headline

Record PRJ-115Maharashtra — Navi MumbaiTier C — single operator source4 public sources checkedAdditive: unknown — counts 0 MW
Under constructionExcluded from the headlineFacilityTakes the node to 155 MW
36MW
Listed capacity
133MW
Portfolio headline, excludes it
155MW
The node once it lands
1.17×
The entire portfolio
2.6×
The Mumbai city tail
0
Delivery dates published

STT GDC Navi Mumbai 4 is 36 MW under development, and the operator page keeps it outside the 133 MW Mumbai headline. That exclusion is honest and it also hides the size of what is coming. Thirty-six megawatts is 2.6 times the entire three-building Mumbai city portfolio, and it takes the Navi Mumbai node from 119 MW to 155 MW — 1.17 times the whole published portfolio, in four buildings inside one node. No basis, rack count, PUE or delivery date is published, so the pipeline is large and undated at the same time.

1At a glance

Operator
STT GDC India
Facility
Navi Mumbai 4, under development
Capacity
36 MW, basis unstated
Portfolio status
Outside the 133 MW headline. The six other cards sum to exactly 133, so this is additional
Effect on the node
Navi Mumbai goes from 119 MW to 155 MW across four buildings
Against the city tail
2.6× the entire Mumbai city portfolio of 14 MW
Racks, floor area, PUE
None published
Delivery date
Not published. No start, no completion, no phase
Additivity
Unknown. Counted at 0 MW

2Why it sits outside the headline

The arithmetic is clean, which is rare enough in this file to be worth spelling out.

The six cards against the headline
BuildingMWIn the 133?
Mumbai 14yes
Mumbai 21yes
Mumbai 39yes
Navi Mumbai 128yes
Navi Mumbai 249yes
Navi Mumbai 342yes
Subtotal133exact match
Navi Mumbai 436no — under development

Because the six sum to the headline to the megawatt, this building is provably additional. That is the good news. The bad news is that the operator never states the rule — so a reader cannot know whether "133 MW in Mumbai" means operating capacity, contracted capacity, or a set of cards that happened to add up on the day the page was built.

It is worth crediting the disclosure anyway. Most aggregates in this registry cannot be reconciled at all. This one can, and the excluded building is clearly excluded.

3What 36 MW does to one node

A single building changes the shape of the whole market at this scale.

Navi Mumbai node once this building lands28 + 49 + 42 + 36 MW155 MWNavi Mumbai inside the 133 MW headlinethree buildings119 MWThis buildingunder construction, outside the headline36 MWThirty-six megawatts takes the Navi Mumbai node to 155 MW — 1.17 times the entire published Mumbai portfolio, in four buildings in one place.
Figure 1The Navi Mumbai node before and after this building. Red is the node complete, navy is what the published portfolio counts today.
Before and after, in one place
MeasureTodayWith Navi Mumbai 4
Navi Mumbai buildings3 in the headline4
Navi Mumbai capacity119 MW155 MW
Share of the Mumbai portfolio89%117% of the current headline
Largest single building in the market49 MW, Navi Mumbai 260.5 MW, a Palava building
Racks at 8 kW—about 4,500
Floor area at 100 W a sq ft—about 360,000 sq ft

One building, 36 MW, and the node’s capacity grows by 30%. That is the scale Indian data centres now operate at — a single construction project is a fifth of a national portfolio.

For a buyer the number that matters is not 36. It is the date, and there is not one. A building of this size landing in 2027 and landing in 2029 are completely different supply stories for the Mumbai market.

4Procurement

Procurement window and scope
Gridvik assessment · 22 Oct 2026
What to buy here
The delivery date and pre-let status of a 36 MW building that will move the Mumbai market when it lands
Who holds the answer
STT GDC India commercial team; the KKR and Singtel transaction documents for the asset schedule
The one question
When does Navi Mumbai 4 power up, and how much of the 36 MW is already committed
Why they will answer it
A building this size is either pre-let or a marketing problem, and the answer determines the sales strategy
Gridvik estimate
Substantially pre-let and delivering in phases from 2027. Labelled an estimate
What changes it
A construction start, a delivery date, or an anchor-tenant announcement
All estimates are labelled as estimates. No tender dates claimed, no private contact data published.
Unlock GridFeed →

5Limits and open questions

  • No date of any kind. The single most important missing fact about the largest building in the pipeline.
  • No basis, racks, floor area or PUE. The standard STT gaps.
  • No stage detail. Under development could mean site clearance or a topped-out shell.
  • Perimeter stated by arithmetic, not by the operator. The exclusion is provable because the six cards sum exactly, not because the page says so.
  • Single source for the 36 MW.
  • What would close it. A delivery date. One date would make this the most valuable record in the Mumbai pipeline.

6Sources

Sources: STT GDC India Mumbai city page, STT GDC India corporate site, STT GDC facility pages for Navi Mumbai, and Indian market commentary on Navi Mumbai data centre supply.