Get Free Teaser
Portfolio record · Verified 26 Oct 2026

STT GDC Pune city portfolio — MaharashtraSTT GDC India · Pune · 40 MW IT current, 140 MW IT support, 200 MVA sanctioned, five cards summing to 81 MW

Record PRJ-123Maharashtra — PuneTier D — operator aggregate6 public sources checkedAdditive: no — counts 0 MW
Four capacities, four scopesIT load statedNo reconciliationPortfolio aggregate
40MW
Current headline IT load
81MW
Sum of five cards
+41MW
Gap between them
140MW
IT support capacity
200MVA
Sanctioned power
3.5×
Growth ambition over today

STT GDC’s Pune page carries four capacities at once: 40 MW of IT load across three advanced facilities, support for up to 140 MW of IT capacity, a 200 MVA power sanction, and five building cards that sum to 81 MW. The headline says three facilities and the page lists five buildings, which is where the arithmetic breaks: 81 against 40. One reconciliation fits — the three smallest cards, 9, 15 and 15, total 39 MW, and the other two at 18 and 24 look like the expansion. That is an inference, not an operator statement, and this page shows the arithmetic rather than asserting the answer.

1At a glance

Operator
STT GDC India
Scope
Pune city footprint, Maharashtra
Headline
40 MW of IT load across three advanced facilities
Support capacity
Up to 140 MW of IT — a site capability, not a building
Power sanction
200 MVA — apparent power, and not interchangeable with megawatts of IT
The building cards
Five cards: 9, 15, 15, 18 and 24 MW, a sum of 81 MW
The mismatch
Three facilities claimed, five buildings listed, 81 MW against a 40 MW headline
Status
Operational and expanding, with no stage stated for any individual card
Additivity
Not additive. Counted at 0 MW, and the five children are marked unknown

2Four numbers, four scopes

Most operator pages confuse two things. This one manages four, and each means something different.

200 MVA — sanctioned powerapparent power, not megawatts of IT200 MVA140 MW — IT support capacitythe site, not the buildings140 MW81 MW — the five building cardswhat the page itemises81 MW40 MW — the city headlinecurrent IT load across three facilities40 MWA single operator page, four capacities, three different units of meaning. Only one of them can be current supply, and the page does not say which.
Figure 1The four figures as published. Pale is the power sanction in MVA, which is not a megawatt measure at all. Red is the only figure that can plausibly describe current IT load.
What each number actually measures
FigureUnit of meaningCan it be used as supply?
40 MWcurrent IT load across three facilitiesyes, if the perimeter is right
81 MWthe sum of five building cardsyes, if the cards are current rather than design
140 MWIT capacity the site can supportno — a capability, not a building
200 MVAsanctioned apparent powerno — a different unit, larger than the megawatts it serves

Two of the four cannot be supply under any reading. The other two could be, and they differ by a factor of two. That is the whole problem: a reader has to choose between 40 and 81 with nothing on the page to decide it.

The comparison with Noida is instructive. There the cards overshot the headline by 4 MW, which looks like a stale perimeter. Here they overshoot by 41 — a hundred per cent — which is not a rounding problem, it is a scope problem.

3The reconciliation that might fit

One arithmetic arrangement explains every published figure, and it is not the one most readers would assume.

Sorting five cards against a three-facility headline
ArrangementSumAgainst the 40 MW headline
Pune 1, 2 and 3 — the three smallest39 MW1 MW under — the closest fit
The three largest57 MW17 MW over
All five cards81 MW41 MW over, double the headline
Pune 4 and 5 as the expansion42 MWthe headline plus this equals 82, against 81 of cards

Read that first and last row together. The three smallest cards total 39, which is 40 to the nearest round number — and the remaining two cards total 42, which added to the headline gives 82 against 81 of itemised capacity. Both sides land within a megawatt of closing.

The reading that follows: the 40 MW headline describes Pune 1, 2 and 3, and Pune 4 and 5 are the expansion, which is consistent with a page that describes the footprint as operational and expanding, and with a 140 MW support capacity that only makes sense if more buildings are coming.

What is inference and what is published

Published: 40 MW IT, 140 MW support, 200 MVA, and five cards of 9, 15, 15, 18 and 24 MW.

Inferred here, and labelled as such: that the headline covers the three smallest cards. The operator never says it, and the alternative — that all five cards are current and the headline is stale — would mean STT operates twice the Pune capacity it claims.

4Why 140 and 200 are not supply

These are the two figures most likely to be quoted out of context, and both are easy to misuse.

The two non-supply figures
FigureWhat it isWhat it would be wrong to say
140 MW of IT supportthe capacity the site and its utilities can serve if built out"STT has 140 MW in Pune"
200 MVA sanctionedapproved apparent power from the utility"STT has 200 MW in Pune"
The relationship140 MW of IT inside 200 MVA of apparent power implies a power factor near 0.70a low factor, which is normal once cooling load is included
The gap140 minus 40 is 100 MW of headroom"STT will build 100 MW in Pune" — headroom is not a plan

The power factor of 0.70 is worth a pause. A data centre campus drawing 140 MW of IT through 200 MVA of sanctioned power is running a low apparent-to-real ratio, which is what you see when the sanction is sized for the whole campus including chillers, and the IT figure is measured at the racks. Both numbers can be right. Neither describes the other.

The proper use of 140 MW is as a ceiling on how large Pune could get, and of 200 MVA as the utility’s commitment behind it. Neither is a forecast, and neither should enter a supply model.

5The Pune market

Pune counts 51.5 MW in this registry, almost all of it one operator. STT contributes none of it.

Pune, counted
OperatorCountedBasis
Nxtra, four Pune buildings49.5 MW4.5 + 17 + 4 + 24 MW, all additive
Iron Mountain PUN 12 MWoperational, additive
STT GDC, five Pune cards0 MWchildren marked unknown, headline non-additive
Pune counted total51.5 MWtwo operators
STT’s published Pune footprint40 to 81 MWdepending on which scope you accept

The consequence is stark. Depending on the reading, STT either operates close to or larger than everything else counted in Pune combined — and the registry counts it as nothing at all.

This is the same defect documented on the Mumbai, Kolkata, Chennai and Noida pages: a well-behaved operator publishing both a city headline and building cards ends up invisible, because the child rows are flagged non-additive and the parent row is flagged non-additive too. The fix is a data-model decision — count the facility, hold the aggregate as a ceiling — and it should be made before any state total is quoted to a buyer.

6Procurement

Procurement window and scope
Gridvik assessment · 22 Oct 2026
What to buy here
Which cards the 40 MW covers, and when the expansion buildings deliver
Who holds the answer
STT GDC India commercial team; the Maharashtra utility for the 200 MVA connection
The one question
Does the 40 MW headline cover Pune 1, 2 and 3, and what are the delivery dates for Pune 4 and 5
Why they will answer it
The answer decides whether Pune has 40 or 81 MW of STT capacity today, which sets the market price
Gridvik estimate
The reconciliation above is correct and the expansion buildings deliver through 2027. Labelled an estimate
What changes it
A per-facility stage table, or a commissioning date for Pune 4 or 5
All estimates are labelled as estimates. No tender dates claimed, no private contact data published.
Unlock GridFeed →

7Limits and open questions

  • No reconciliation published. The inference on this page is arithmetic, not an operator statement.
  • Three facilities against five buildings. The page itself is inconsistent about how many sites exist.
  • No stage for any card. Not one of the five says whether it is operating, filling or planned.
  • No racks, floor area or PUE anywhere in the Pune portfolio.
  • 140 MW and 200 MVA are capability figures and must never be quoted as capacity.
  • What would close it. A table mapping the headline to the cards. It would take one row per building.

8Sources

Sources: STT GDC India Pune city page, STT GDC India facility pages for Pune, STT GDC India corporate site, Data Center Dynamics on the KKR and Singtel acquisition, Nxtra Pune material for the market comparison, and Indian market commentary on the Pune data centre market.