STT GDC Pune 1 is 9 MW, the smallest of five Pune building cards. On its own that is unremarkable. It carries weight because of what it does to the arithmetic: 9 + 15 + 15 = 39 MW, which is the only combination of cards that reconciles to the operator’s 40 MW, three-facility headline — and the rounded 40 is what the page says. No stage, rack count, floor area or PUE is published. This record is a small building holding up a large argument.
1At a glance
2Why nine megawatts matters
The Pune portfolio has four published capacities and no reconciliation. This card is one of the three that closes it.
| Combination | Sum | Verdict |
|---|---|---|
| 9 + 15 + 15 | 39 | 1 MW under the headline — the only fit |
| 9 + 15 + 18 | 42 | 2 MW over |
| 15 + 15 + 18 | 48 | 8 MW over |
| All five | 81 | double the headline |
| Any three including 24 | 57 or more | too large |
Only one three-card arrangement lands within a megawatt of 40. It happens to be the three smallest buildings, which is also the arrangement that leaves the two largest as expansion — exactly what a page describing an operational and expanding footprint should look like.
None of this is proof. But it is the difference between a portfolio that is incoherent and one whose structure is recoverable from published numbers, and the second is more likely.
3What a 9 MW building is
Nine megawatts is small enough that its role in a portfolio is usually network and enterprise rather than hyperscale.
| Assumed density | Racks | Typical role |
|---|---|---|
| 5 kW a rack | 1,800 | enterprise colocation, DR, storage |
| 8 kW a rack | 1,125 | standard market build |
| 12 kW a rack | 750 | a single accelerated-compute hall, if cooled |
At this size a building cannot serve a hyperscaler, and it does not need to. Pune’s demand is automotive, manufacturing, financial services and a growing GCC base — customers who want 200 to 800 kilowatts each, not 20 MW.
That is why removing it from the portfolio would matter more than its 11% share suggests. The three small Pune buildings are the ones that serve the customers the city actually has.
4Procurement
5Limits and open questions
- No stage. The card does not say whether the building exists.
- Basis unresolved. 9 MW could be IT, gross or a design ceiling.
- No racks, floor area or PUE. Density cannot be computed.
- The reconciliation is an inference. This card matters because of a reading, not a statement.
- Single source. No directory carries the 9 MW independently.
- What would close it. A stage. One word would make this a facility record rather than a card.
6Sources
Sources: STT GDC India Pune city page, STT GDC India facility pages for Pune, STT GDC India corporate site, and Indian market commentary on the Pune data centre market.