Facility record · Verified 26 Oct 2026

STT GDC Pune 1 — MaharashtraSTT GDC India · Pune · 9 MW, smallest of five cards in a portfolio that does not reconcile

Record PRJ-124Maharashtra — PuneTier C — single operator source4 public sources checkedAdditive: unknown — counts 0 MW
Load-bearing to the reconciliationNo stage statedFacility11% of the card sum
9MW
Card capacity
81MW
Sum of five cards
39MW
This card plus Pune 2 and 3
40MW
City headline
22.5%
Of the headline, if the inference is right
0
Dates published

STT GDC Pune 1 is 9 MW, the smallest of five Pune building cards. On its own that is unremarkable. It carries weight because of what it does to the arithmetic: 9 + 15 + 15 = 39 MW, which is the only combination of cards that reconciles to the operator’s 40 MW, three-facility headline — and the rounded 40 is what the page says. No stage, rack count, floor area or PUE is published. This record is a small building holding up a large argument.

1At a glance

Operator
STT GDC India
Facility
Pune 1, Maharashtra
Capacity
9 MW, basis unresolved
Position
Smallest of five Pune cards totalling 81 MW
Role in the arithmetic
With Pune 2 and 3 at 15 MW each, totals 39 MW against a 40 MW three-facility headline
Stage
Unverified. No stage on any of the five Pune cards
Racks, floor area, PUE
None published
Additivity
Unknown. Counted at 0 MW

2Why nine megawatts matters

The Pune portfolio has four published capacities and no reconciliation. This card is one of the three that closes it.

Pune 1 — this recordthe smallest card9 MWPune 2part of the matched pair15 MWPune 3part of the matched pair15 MWPune 4likely expansion18 MWPune 5likely expansion, and the largest24 MWNine megawatts is the smallest card and the one that makes the reconciliation work: 9, 15 and 15 total 39 against a 40 MW headline.
Figure 1The five Pune cards. Red is this record. Under the inference documented on PRJ-123, this card and the two 15 MW cards are the three facilities behind the 40 MW headline.
Every way to read five cards against 40 MW
CombinationSumVerdict
9 + 15 + 15391 MW under the headline — the only fit
9 + 15 + 18422 MW over
15 + 15 + 18488 MW over
All five81double the headline
Any three including 2457 or moretoo large

Only one three-card arrangement lands within a megawatt of 40. It happens to be the three smallest buildings, which is also the arrangement that leaves the two largest as expansion — exactly what a page describing an operational and expanding footprint should look like.

None of this is proof. But it is the difference between a portfolio that is incoherent and one whose structure is recoverable from published numbers, and the second is more likely.

3What a 9 MW building is

Nine megawatts is small enough that its role in a portfolio is usually network and enterprise rather than hyperscale.

Bracketing 9 MW
Assumed densityRacksTypical role
5 kW a rack1,800enterprise colocation, DR, storage
8 kW a rack1,125standard market build
12 kW a rack750a single accelerated-compute hall, if cooled

At this size a building cannot serve a hyperscaler, and it does not need to. Pune’s demand is automotive, manufacturing, financial services and a growing GCC base — customers who want 200 to 800 kilowatts each, not 20 MW.

That is why removing it from the portfolio would matter more than its 11% share suggests. The three small Pune buildings are the ones that serve the customers the city actually has.

4Procurement

Procurement window and scope
Gridvik assessment · 22 Oct 2026
What to buy here
Whether the 9 MW is live, and whether it is the kind of building a mid-size Pune tenant can actually buy from
Who holds the answer
STT GDC India commercial team
The one question
Is Pune 1 operating, and what is its rack count and design density
Why they will answer it
Pune demand is mid-size enterprise and those tenants need small halls, not 24 MW buildings
Gridvik estimate
Pune 1 is operating and largely let, as the oldest of the five. Labelled an estimate
What changes it
A stage, a rack count, or a commissioning date
All estimates are labelled as estimates. No tender dates claimed, no private contact data published.
Unlock GridFeed →

5Limits and open questions

  • No stage. The card does not say whether the building exists.
  • Basis unresolved. 9 MW could be IT, gross or a design ceiling.
  • No racks, floor area or PUE. Density cannot be computed.
  • The reconciliation is an inference. This card matters because of a reading, not a statement.
  • Single source. No directory carries the 9 MW independently.
  • What would close it. A stage. One word would make this a facility record rather than a card.

6Sources

Sources: STT GDC India Pune city page, STT GDC India facility pages for Pune, STT GDC India corporate site, and Indian market commentary on the Pune data centre market.