Get Free Teaser
Facility record · Verified 26 Oct 2026

STT GDC Pune 3 — MaharashtraSTT GDC India · Pune · 15 MW, identical to Pune 2, two thirds of a three-facility headline

Record PRJ-126Maharashtra — PuneTier C — single operator source4 public sources checkedAdditive: unknown — counts 0 MW
Twin of Pune 277% of the footprint in two buildingsFacility15 MW
15MW
Card capacity
30MW
The pair together
77%
Of the current footprint, if the inference holds
39MW
The three smallest cards
40MW
The city headline
0
Dates published

STT GDC Pune 3 is 15 MW, identical to Pune 2. Under the only arrangement of the five Pune cards that reconciles to the 40 MW three-facility headline, those two buildings carry 30 of the 39 megawatts — 77% of the current Pune footprint in a matched pair. Identical capacities to the decimal mean one design built twice, which is how capacity gets delivered quickly in a secondary city. No stage, rack count, floor area or PUE is published, so the pair’s dominance is arithmetic rather than confirmed.

1At a glance

Operator
STT GDC India
Facility
Pune 3, Maharashtra
Capacity
15 MW, basis unresolved
Twin
Pune 2 at an identical 15 MW — PRJ-125
Pair share
30 MW, or 77% of the 39 MW that appears to sit behind the headline
Position among the cards
Joint second largest of five, 18.5% of the 81 MW card sum
Stage
Unverified. No stage on any Pune card
Additivity
Unknown. Counted at 0 MW

2Seventy-seven per cent in two buildings

Pune looks like a five-building portfolio. Read against its own headline, it is a two-building portfolio with a small site attached.

Pune 1, 2 and 3 — the likely three facilities9 + 15 + 15 MW against a 40 MW headline39 MWPune 2 and 3 — the identical pairtwo buildings, one design30 MW · 77%Pune 1the third facility9 MWThirty of the thirty-nine megawatts in the current headline are two buildings with the same capacity. The pair is the Pune portfolio.
Figure 1The three smallest cards, which are the only arrangement that closes to the 40 MW headline, split into the identical pair and the 9 MW site. Red is the pair this record belongs to.
The Pune footprint under the headline
BuildingMWShare of the 39Role
Pune 21538%half of the matched pair
Pune 31538%the other half
Pune 1923%the smaller site
Total39100%against a 40 MW headline

Two buildings out of five carry 77% of current capacity, and they are the same building. That is a real operational fact and it has two consequences.

The first is delivery: a standard module can be replicated quickly, so the expansion pair at 18 and 24 MW can be built and commissioned on a known schedule. The second is exposure: three quarters of the city footprint shares a design, and presumably a site, a utility connection and a fibre route.

3What a matched pair tells buyers

Identical capacities are a signal about how the operator works, and they are more useful to a tenant than any headline.

Reading the signal
ObservationWhat it implies for a tenant
Same capacity to the decimalone design, known delivery time, predictable pricing
Likely shared siteshared substation, so shared resilience risk
Same cooling designthe same density ceiling in both buildings — ask what it is
Pair carries 77% of the footprintyou are probably being shown one of two buildings
No stage on either cardthe operator can sequence them without republishing anything

For a tenant the practical value is predictability. A standardised building has a known fit-out, a known rack count per hall and a known lead time — and in Pune, where only one other operator has meaningful capacity, that predictability is the product.

For the market the value is different: a standard module tells you the shape of the next building before it is announced. If STT builds Pune 4 and 5 to the same module, the city adds 30 MW on a schedule anyone can model.

4Procurement

Procurement window and scope
Gridvik assessment · 22 Oct 2026
What to buy here
One half of a standardised 30 MW pair in a market with one comparable operator
Who holds the answer
STT GDC India commercial team
The one question
Is Pune 3 the same design as Pune 2, and what is the density ceiling in both
Why they will answer it
If it is a standard module, the density ceiling is the most important thing a GPU tenant can ask about
Gridvik estimate
The pair is operating and partially let, and the design ceiling is above 8 kW a rack. Labelled an estimate
What changes it
A design density, a rack count, or a stage
All estimates are labelled as estimates. No tender dates claimed, no private contact data published.
Unlock GridFeed →

5Limits and open questions

  • No stage. Neither card says whether the building exists.
  • No basis. 15 MW is unlabelled.
  • No racks, floor area or PUE. The design ceiling — the thing a standard module most needs to be known for — is absent.
  • The 77% depends on the reconciliation on PRJ-123, which is an inference rather than a statement.
  • Shared site assumed, not confirmed.
  • What would close it. A design density. That one figure gives the pair a commercial identity.

6Sources

Sources: STT GDC India Pune city page, STT GDC India facility pages for Pune, STT GDC India corporate site, Nxtra Pune material for the market comparison, and Indian market commentary on Pune data centre capacity.