Portfolio record · Verified 26 Oct 2026

STT GDC Bengaluru city portfolio — KarnatakaSTT GDC India · Bengaluru · 23 MW IT across three facilities, cards summing to 22.6 MW

Record PRJ-129Karnataka — BengaluruTier D — operator aggregate5 public sources checkedAdditive: no — counts 0 MW
Cards nearly reconcileIT load statedCounts 0 MW25% of Karnataka
23MW
Headline IT load
22.6MW
Sum of three cards
−0.4MW
Rounding difference
3
Facilities
25%
Of counted Karnataka
0MW
Counted in this registry

STT GDC states 23 MW of IT load for Bengaluru across three facilities. The cards read 0.6, 4 and 18 MW — a sum of 22.6, which is what a rounded headline should look like. After Noida’s 4 MW gap and Pune’s 41 MW gap, this is the portfolio that behaves: the basis is IT load, nothing is hidden under construction language, and the arithmetic closes to the nearest megawatt. It is also 25% of counted Karnataka capacity and contributes nothing to it, because every STT portfolio in this file is flagged non-additive.

1At a glance

Operator
STT GDC India
Scope
Bengaluru city portfolio, Karnataka
Headline
23 MW of IT load across three facilities
The three cards
Bengaluru 1 0.6 MW, Bengaluru 2 4 MW, Bengaluru 3 18 MW — a sum of 22.6
Reconciliation
0.4 MW, consistent with rounding. No scope conflict
Density range
the smallest card is 30 times smaller than the largest, in one city
Market position
25% of the 90.7 MW counted in Karnataka
Status
Operational and expanding, with no stage on any individual card
Additivity
Not additive. Counted at 0 MW

2The portfolio that reconciles

Across eight STT city portfolios, this is one of two where the cards and the headline tell the same story.

All eight STT city portfolios
CityHeadlineCardsDifferenceReading
Mumbai1331330exact
Bengaluru2322.6−0.4rounding, as expected
Kolkata990exact
Delhi1211.9−0.1rounding
Noida6367+4perimeter undefined
Hyderabad64−2short
Chennai6861−7only closes if a building from another campus is counted — see PRJ-138
Pune4081+41scope conflict

A headline that rounds up its cards is not a reconciliation failure. It is what a well-maintained page looks like: the items are published, the total is published, and the two agree to the level of precision anyone would quote.

Two details make this portfolio better than most in the file. The basis is stated as IT load rather than an unlabelled power capacity, and no card is labelled under construction — so unlike Noida, the headline is not quietly including buildings that do not exist.

The standard this sets

Publish the items, publish the total, state the basis, do not hide construction inside a current figure. That is four things, and only two operators in this file do all four.

It is also the reason Bengaluru is the easiest STT city to model, and the one where the registry’s counting defect is most obviously wrong.

3Three buildings, a thirty-fold range

A 0.6 MW building and an 18 MW building in the same city portfolio is the widest internal range in the STT set.

The three Bengaluru buildings
BuildingMWShare of 23What it is
Bengaluru 10.62.6%a suite — see PRJ-130
Bengaluru 2417.4%the standard small module — see PRJ-131
Bengaluru 31878.3%the workhorse — see PRJ-132
Total22.698.3%against a 23 MW headline

The Mumbai portfolio ranges 28-fold and this one 30-fold, both driven by the same structure: a legacy city suite at the bottom and a modern hall at the top. Bengaluru compresses the whole history of Indian data centres into three cards.

The 0.6 MW building is the interesting one. It is too small to be a data centre in any commercial sense, and it is still published, still inside the headline, and still counted in the 23 MW that gets quoted. Whether that is honesty or inflation depends on whether the headline claims to be capacity or to be a list of sites.

4Where 23 MW sits in Karnataka

Karnataka counts 90.7 MW across 19 records. STT’s 23 MW would be the second largest share in the state, and it is counted at zero.

Nxtra, four Bengaluru buildingscounted45.4 MWSTT GDC Bengaluru — this record23 MW published, 0 counted23 MW · 0 countedNTT Bengaluru 2 and 3operational, counted16.5 MWCtrlS Bengalurucounted13 MWSify Bengaluru, two sitescounted11.8 MWIron Mountain BLR 1counted4 MWKarnataka counts 90.7 MW. A quarter of it is STT, and STT is the one bar that counts for nothing.
Figure 1Counted Karnataka capacity by record, with the STT portfolio shown in red. It is the second-largest bar in the state and the only one that contributes nothing.
Karnataka, counted and published
OperatorCountedPublished
Nxtra45.4 MW45.4 MW — four cards
STT GDC0 MW23 MW — three cards
NTT, Bengaluru 2 and 316.5 MW16.5 MW plus a 67.2 MW campus outside the count
CtrlS13 MW13 MW
Sify11.8 MW11.8 MW
Iron Mountain4 MW4 MW
State total90.7 MWat least 113.7 MW once STT is counted

That last row is the size of the defect in one state: counted capacity is 90.7 MW and published capacity is at least 113.7 MW. And that number is itself a floor, because NTT’s 67.2 MW Bengaluru campus and its 22.4 MW buildings are also flagged non-additive.

Karnataka is also the clearest case for fixing the flag rather than re-researching the market: every figure needed to correct the state total is already published by the operators. The research is done. The rule is what is wrong.

5Procurement

Procurement window and scope
Gridvik assessment · 22 Oct 2026
What to buy here
The cleanest STT city to model — three cards, a stated IT basis, and a headline that matches
Who holds the answer
STT GDC India commercial team; the Karnataka data centre policy office for the state’s 1 GW target
The one question
What is the rack count and PUE of Bengaluru 3, the 18 MW workhorse
Why they will answer it
Karnataka is actively recruiting data centre tenants against a 1 GW target and a published incentive policy
Gridvik estimate
Bengaluru 3 is operating and substantially let; the two smaller sites are legacy. Labelled an estimate
What changes it
A rack count, a PUE, or any per-building stage
All estimates are labelled as estimates. No tender dates claimed, no private contact data published.
Unlock GridFeed →

6Limits and open questions

  • No stage on any card. None of the three says whether it is operating.
  • No racks, floor area or PUE. Density cannot be computed for any Bengaluru building.
  • The 0.4 MW difference is unexplained but consistent with rounding, which is the most benign explanation available.
  • Counted at zero despite being one of the best-documented portfolios in the file.
  • Single source for all three capacities.
  • What would close it. A per-building stage and rack count. Two lines per building.

7Sources

Sources: STT GDC India Bengaluru city page, STT GDC India facility pages for Bengaluru, STT GDC India corporate site, Nxtra and NTT Bengaluru material for the market comparison, and Indian market commentary on the Bengaluru data centre market.