Get Free Teaser
Portfolio record · Verified 26 Oct 2026

STT GDC Kolkata city portfolio — West BengalSTT GDC India · Kolkata / New Town · 9 MW IT across two facilities, 3 and 6 MW

Record PRJ-133West Bengal — KolkataTier D — operator aggregate5 public sources checkedAdditive: no — counts 0 MW
Cards reconcile exactlyIT load statedState counts 1 MW9 MW
9MW
Headline IT capacity
3 + 6
The two cards
0
Reconciliation gap
~94MW
Published in West Bengal
1.08MW
Counted in West Bengal
87×
Published to counted

STT GDC states 9 MW of IT capacity for Kolkata across two facilities of 3 and 6 MW. The cards reconcile to the headline exactly — no gap, no scope conflict. The number matters less than the setting. West Bengal publishes roughly 94 MW across four operators — CtrlS 60, NTT 25, STT 9 — and this registry counts 1.08 MW for the entire state. That is 87 to one, the widest gap in this file, and it is a counting rule failure rather than a research gap: every megawatt is published.

1At a glance

Operator
STT GDC India
Scope
Kolkata and New Town, West Bengal
Headline
9 MW of IT capacity across two facilities
The two cards
Kolkata 1 at 3 MW, Kolkata 2 at 6 MW — an exact sum
Market position
The third-largest published capacity in West Bengal, after CtrlS and NTT
State context
About 94 MW published across four operators; 1.08 MW counted
Status
Operational and expanding, with no stage on either card
Additivity
Not additive. Counted at 0 MW

2Nine megawatts, reconciled exactly

Two cards, one headline, no gap. After eight STT cities this is the second of only two exact reconciliations.

Eight STT city portfolios, gap by gap
CityHeadlineCardsGap
Mumbai1331330
Kolkata990
Bengaluru2322.6−0.4
Delhi1211.9−0.1
Noida6367+4
Hyderabad64−2
Chennai6861−7
Pune4081+41

Kolkata is also the smallest portfolio in the estate, which makes it the easiest to keep honest — two buildings and one number. There is nothing here for an operator to get wrong, and the operator did not.

The basis is stated as IT capacity, which puts Kolkata alongside Chennai, Noida, Bengaluru and Pune in the group of five cities where STT says what the megawatts measure. Mumbai and Hyderabad say "power capacity" without qualification.

3A state that counts one megawatt

This is the most consequential page in the STT set, and it has almost nothing to do with STT.

CtrlS Kolkata campus60 MW claimed, 4 phases60 MWNTT Kolkata 1 campusstatus conflicted25 MWSTT GDC Kolkata — this record9 MW IT, two buildings9 MWSify Kolkata 01the only counted record1.08 MW countedNinety-four megawatts published across four operators in one state, and one point zero eight of them counted.
Figure 1Every operator with published capacity in West Bengal, and the single counted record at the bottom right. Blue is the only bar that reaches the state total.
West Bengal, in full
OperatorPublishedCountedWhy not counted
CtrlS Kolkata60 MW campus, 16 MW DC 10campus aggregate flagged non-additive; the 16 MW child inside it too
NTT Kolkata 125 MW campus0campus aggregate flagged non-additive
STT GDC Kolkata9 MW across two cards0portfolio and both children flagged non-additive
Sify Kolkata 011.08 MW1.08 MWa standalone facility with no parent aggregate
State total~94 MW1.08 MW1.3% of published capacity

One rule produces this: never add a child to its parent. Every metro operator in Kolkata publishes a campus or city aggregate and then the buildings inside it. Both are flagged non-additive, so neither reaches the state total, and only the one operator that runs a standalone 1.08 MW site is counted.

The consequence is that this registry, which exists to measure Indian data centre capacity, reports West Bengal as a 1.08 MW market. Any buyer using that number would conclude the state has no meaningful capacity, when it has a 60 MW campus, a 25 MW campus and a 9 MW portfolio.

This is the defect, stated plainly

West Bengal is not under-researched. Every figure needed to correct the state total is published by the operators and already in this file.

The registry is wrong because of an additivity rule, not because of missing data. Fixing the flag for five records moves the state from 1.08 MW to roughly 95 MW — and the same fix corrects Maharashtra, Karnataka, Tamil Nadu and Telangana at the same time.

4Why the gap exists

Double counting is a real risk, so the rule was right in principle. Here is where it fails.

The rule, and its unintended effect
RuleProtects againstProduces
Do not add a child to its parentcounting a building and its campus twicea campus and all its buildings both excluded
Flag aggregates non-additiveinflated totals from design ceilingsoperator portfolios vanishing from state totals
Keep unresolved records at zerocounting unverified claimsverified capacity disappearing alongside the unverified
Result in West Bengal—1.08 MW counted against 94 published

The fix is not to relax verification. It is to separate two things the current model conflates: a facility, which is countable, and a ceiling, which is not. A campus claim of 60 MW is a ceiling. DC 1 at 16 MW is a facility. The facility should count; the ceiling should sit beside it as context.

That is a data-model change of perhaps two hours, and it is worth more to the product than any new research in this file. Until it is made, every state total on the public registry is understated, and the four most industrialised data centre states are understated the most.

5Procurement

Procurement window and scope
Gridvik assessment · 22 Oct 2026
What to buy here
Kolkata is the cheapest Indian metro with real enterprise demand and the least competitive supply
Who holds the answer
STT GDC India eastern region sales; the West Bengal industrial development corporation
The one question
What is the rack count and PUE of Kolkata 2, the 6 MW building
Why they will answer it
Eastern India has three operators and no new hyperscale supply announced, so a 6 MW building is a strong position
Gridvik estimate
Both buildings are operating and largely let. Labelled an estimate
What changes it
A rack count, a PUE, or a commissioning date for either building
All estimates are labelled as estimates. No tender dates claimed, no private contact data published.
Unlock GridFeed →

6Limits and open questions

  • No stage on either card. The portfolio is described as operational and expanding, but neither building is dated.
  • No racks, floor area or PUE.
  • Counted at zero, which is the defect this page documents.
  • Single source for both capacities.
  • The state total is not corrected here — this record reports the defect rather than silently patching it, so the published number stays traceable to the source file.
  • What would close it. Two things: a rack count from the operator, and an additivity fix in the registry.

7Sources

Sources: STT GDC India Kolkata city page, STT GDC India facility pages for Kolkata, STT GDC India corporate site, CtrlS and NTT Kolkata material for the state comparison, and Indian market commentary on the Kolkata data centre market.