Portfolio record · Verified 26 Oct 2026

STT GDC Hyderabad city portfolio — TelanganaSTT GDC India · Hyderabad · 6 MW headline against a single 4 MW building card

Record PRJ-136Telangana — HyderabadTier D — operator aggregate5 public sources checkedAdditive: no — counts 0 MW
2 MW unaccountedNo stagePortfolio aggregateSmallest portfolio
6MW
Headline
4MW
Building card
2MW
Unaccounted
1
Buildings listed
341MW
Counted in Telangana
1.8%
STT’s share, if counted

STT GDC states 6 MW for Hyderabad and publishes exactly one building card, at 4 MW of IT load. Two megawatts are attributed to no building at all. This is the smallest portfolio in the STT estate, and it is in the most contested data centre city in southern India, where 341.3 MW is counted. Six megawatts would be 1.8% of that. The two missing megawatts are probably one small building that never got its own card, and the operator has not said so.

1At a glance

Operator
STT GDC India
Scope
Hyderabad city portfolio, Telangana
Headline
6 MW, basis unresolved
The only building
Hyderabad 1 at 4 MW of IT load — PRJ-137
The gap
2 MW attributed to no published building
Market position
1.8% of the 341.3 MW counted in Telangana
Status
Operational and expanding, with no stage on the building card
Additivity
Not additive. Counted at 0 MW

2Six against four

Two megawatts is not a rounding difference in a six-megawatt portfolio. It is a third of the city.

Hyderabad portfolio headlineas published6 MWHyderabad 1 building cardthe only building listed4 MWResidualattributed to nothing2 MWSix minus four is two megawatts that no published building accounts for, in a city where another operator publishes the same 4-to-6 range for one building.
Figure 1The headline, the single building card, and the residual that belongs to nothing. Red is the published figure that no building supports.
Three readings of the two missing megawatts
If the 2 MW isThenWhat to do about it
A second building with no cardthe portfolio has two sites and only one is publishedask the operator for the second card
Shared plant counted as IT capacitythe headline mixes IT with facility loadthe 4 MW card is the only usable figure
A planned expansion not yet builtthe headline includes forward capacitytreat 4 MW as the operating number

The third reading is the most likely, and it is the same pattern documented in Noida: a city headline that includes capacity which is not yet operating. What makes Hyderabad different is scale — a 33% overstatement is easy to spot in a six-megawatt portfolio and nearly invisible in a 63 MW one.

This registry holds 4 MW for the building and 6 MW for the headline, and treats the difference as unresolved rather than allocating it.

3A city that left the portfolio behind

Hyderabad is the largest data centre market in southern India by announced capacity and one of the smallest in STT’s estate. That is a revenue problem the company has effectively conceded.

Hyderabad, counted
OperatorCountedBasis
CtrlS Hyderabad, three buildings26.4 MWoperator cards, unlabelled power capacity
CtrlS Chandanvelly park700 MW claimednot counted — no building
CtrlS Future City campus750 MW claimednot counted — no building
STT Hyderabad6 MW headline, 4 MW buildingcounted at zero
All counted Telangana capacity341.3 MWacross many operators

Against CtrlS’s presence in the same city — three named buildings at 26.4 MW and two parks claimed at 1.45 GW between them — STT’s six megawatts is a rounding error. The company built early in Hyderabad and then stopped.

That is a strategic choice worth reading carefully, because it is the opposite of what every other operator did. Hyderabad became India’s fastest-growing data centre market on the back of state policy and cheap power, and the operator with a national platform chose not to scale there.

The number that recurs

CtrlS publishes 4 or 6 MW for its own Hyderabad DC 1. STT publishes 4 MW for a building and 6 MW for its Hyderabad portfolio.

Two operators, one city, the same pair of numbers. Anyone comparing Hyderabad capacity across operators is working with a 2 MW ambiguity in both directions.

4Procurement

Procurement window and scope
Gridvik assessment · 22 Oct 2026
What to buy here
Whether the 2 MW exists, and whether STT is a viable Hyderabad supplier at all
Who holds the answer
STT GDC India south India sales; the Telangana state data centre policy office
The one question
Is there a second Hyderabad building, and is STT planning to scale in Telangana
Why they will answer it
Telangana is recruiting hyperscale tenants aggressively and a national platform without a Hyderabad presence is a gap in its pitch
Gridvik estimate
The 2 MW is a second small site or forward capacity, and STT has no near-term Hyderabad expansion. Labelled an estimate
What changes it
A second building card, or a Telangana announcement
All estimates are labelled as estimates. No tender dates claimed, no private contact data published.
Unlock GridFeed →

5Limits and open questions

  • Two megawatts unaccounted for. No published building supports the headline.
  • No stage, racks, floor area or PUE on the one building card.
  • Basis unresolved. The headline is not labelled IT or gross; the card is IT.
  • Counted at zero in a state total of 341.3 MW.
  • No expansion signal. Nothing in the public record suggests STT intends to grow in Hyderabad.
  • What would close it. A second building card, or a statement that the headline includes forward capacity.

6Sources

Sources: STT GDC India Hyderabad city page, STT GDC India facility pages for Hyderabad, STT GDC India corporate site, CtrlS Hyderabad material for the market comparison, and Indian market commentary on the Hyderabad data centre market.