Get Free Teaser
Facility record · Verified 26 Oct 2026

STT GDC Hyderabad 1 — TelanganaSTT GDC India · Hyderabad · 4 MW IT load, 67% of a 6 MW city headline

Record PRJ-137Telangana — HyderabadTier C — single operator source4 public sources checkedAdditive: no — inside the 6 MW portfolio
IT load stated67% of a headline with 2 MW missingFacility4 MW
4MW
IT load
67%
Of the 6 MW headline
2MW
Attached to nothing
1
STT buildings in Hyderabad
4
Cities with a 4 MW STT module
0
Racks published

STT GDC Hyderabad 1 is 4 MW of IT load — the only building the company publishes in Hyderabad, and 67% of its 6 MW city headline. The other two megawatts belong to nothing. It is one of four 4 MW modules in the STT estate, and here the module carries less portfolio around it than anywhere else. Against CtrlS, which runs three named buildings totalling 26.4 MW in the same city and claims two more parks, this is a foothold that was never expanded. No stage, rack count, floor area or PUE is published.

1At a glance

Operator
STT GDC India
Facility
Hyderabad 1, Telangana
Capacity
4 MW of IT load — basis explicitly stated
Position
The only STT building in Hyderabad, and 67% of a 6 MW city headline
The missing part
2 MW of the headline is attached to no published building — see PRJ-136
Market position
About 1.2% of the 341.3 MW counted in Telangana
Implied size
roughly 300 to 500 cabinets at normal densities
Stage
Unverified. No stage, racks or PUE published
Additivity
Not additive. Counted at 0 MW

2Four megawatts in a 341 MW city

Hyderabad is the second-largest data centre market in southern India. STT has one building in it.

Hyderabad, operator by operator
OperatorPublishedBuildingsPosition
CtrlS26.4 MW + 1.45 GW of parks claimed3 namedthe incumbent
STT GDC4 MW in one building1a foothold
All counted Telangana capacity341.3 MWmanythe market

Four megawatts is 1.2% of the counted Telangana market. It is the smallest meaningful presence any national operator has in the state, and it has not grown while everything around it did.

That matters for two reasons. It tells a tenant that STT cannot serve a serious Hyderabad requirement, which pushes them to CtrlS or to the newer entrants. And it tells a competitor that one of the four national platforms is effectively absent from India’s fastest-growing data centre market — which is an open field.

3The module at 67%

The 4 MW module appears in four cities. This is where it plays its largest role.

Ahmedabadthe module is the entire portfolio100%Hyderabad — this recordthe module and 2 MW attached to nothing67%Bengaluruone of three buildings17%Mumbaione of six buildings3%The same 4 MW building is an entire city portfolio in one place and a rounding detail in another. This is the city where the module carries the least portfolio around it.
Figure 1The same 4 MW module in four cities, as a share of each city portfolio. Red is Ahmedabad, where it is the whole portfolio; grey is Hyderabad, where it is two thirds.
The module’s four roles
CityPortfolioModule shareWhat the module is doing
Ahmedabad4 MW100%the entire Indian presence in that city
Hyderabad6 MW headline67%the only real building, plus 2 MW of air
Bengaluru23 MW17%a city-entry site alongside a large hall
Mumbai133 MW3%a rounding detail in the country’s biggest estate

A standard module that is 100% of one city and 3% of another is the clearest possible demonstration of how little a portfolio total tells you about a city. The same building is the whole market presence in Ahmedabad and invisible in Mumbai.

For anyone selling into STT, it also means the sales cycle is the same in all four places: a 4 MW building has a 4 MW equipment schedule and a 4 MW-sized decision. That predictability is what a vendor wants, and it is only visible if the operator publishes cards rather than aggregates.

4Procurement

Procurement window and scope
Gridvik assessment · 22 Oct 2026
What to buy here
The only STT capacity in Hyderabad, and whether the company intends to stay in the market
Who holds the answer
STT GDC India south India sales
The one question
Is Hyderabad 1 operating, and is the remaining 2 MW a second building
Why they will answer it
A national platform cannot pitch a multi-city tenant without an answer for India’s second southern market
Gridvik estimate
The building is operating and let, and STT has no near-term Hyderabad expansion. Labelled an estimate
What changes it
A second building card, or a Telangana announcement
All estimates are labelled as estimates. No tender dates claimed, no private contact data published.
Unlock GridFeed →

5Limits and open questions

  • 2 MW of its own portfolio unaccounted for. The headline exceeds the only published building.
  • No stage, racks, floor area or PUE.
  • Counted at zero in a 341.3 MW state.
  • No expansion signal anywhere in the public record.
  • Single source for the 4 MW.
  • What would close it. A stage, a rack count and an answer on the missing 2 MW. Three lines would settle the smallest portfolio in the estate.

6Sources

Sources: STT GDC India Hyderabad city page, STT GDC India facility pages for Hyderabad, STT GDC India corporate site, CtrlS Hyderabad material for the market comparison, and Indian market commentary on the Telangana data centre market.