Facility record · Verified 26 Oct 2026

STT GDC Chennai 3 — Tamil NaduSTT GDC India · Chennai · 15 MW under construction, first of a 32 MW pipeline

Record PRJ-141Tamil Nadu — ChennaiTier C — stage stated, dates absent4 public sources checkedAdditive: no — inside the 68 MW portfolio
Under constructionNo handover dateFacility15 MW
15MW
IT capacity
32MW
The Chennai pipeline
29MW
Operating today
110%
Pipeline against operating
22%
Of the 68 MW headline
0
Handover dates

STT GDC Chennai 3 is 15 MW under construction. With Chennai 4 at 17 MW it forms a 32 MW pipeline — 110% of the 29 MW the company actually operates in Chennai. That is the most important fact in the Tamil Nadu file and it has no date attached to it. No handover date, no rack count, no floor area and no PUE is published for either building. In a market where tenants are contracting two years ahead, an undated 32 MW is what everyone is guessing about.

1At a glance

Operator
STT GDC India
Facility
Chennai 3, Tamil Nadu
Capacity
15 MW of IT capacity
Stage
Under construction — stated
The pipeline
Chennai 3 at 15 MW plus Chennai 4 at 17 MW — 32 MW
Against the business
110% of the 29 MW STT operates in Chennai today
Expansion programme
Part of a multi-campus Chennai expansion announced at ₹4,200 crore
Dates
None. No handover date for either building
Additivity
Not additive. Counted at 0 MW

2A pipeline larger than the business

Chennai is where the Indian supply question is sharpest, and STT’s position is a clean illustration of it.

Chennai 4pipeline building17 MWChennai 3 — this recordpipeline building15 MWOperating todayChennai 1 and 2, for scale29 MWTwo buildings of 32 MW against 29 MW operating. The pipeline is larger than the business.
Figure 1The 32 MW pipeline against the 29 MW operating business. Red is this record. Navy is what exists today, for scale.
Chennai, in four numbers
MeasureMWReads as
Operating29what exists and can be sold now
Under construction32what will exist, on an unknown schedule
Borrowed from another campus7.2counted in a headline it does not belong to
Headline68all of the above, added together
Pipeline as a share of operating110%the market roughly doubles when it lands

A pipeline the size of the existing business is normal for a growth market and alarming for a market already under stress. Chennai’s rents have risen because supply lagged demand for three years. Thirty-two megawatts of new STT capacity would relieve that — if it lands in 2027.

If it lands in 2029, the shortage lasts another three years and the rents keep climbing. The megawatts are identical in both scenarios.

3Why the date matters more than the megawatts

This page could have been built around 15 MW. The number that actually matters is the one that is missing.

Two futures for the same building
If Chennai 3 hands overThen
2027Chennai supply loosens and the 2028 renewals price flat
Early 2028the market holds at today’s rents through one more cycle
2029 or laterthree more years of shortage, and tenants lock long terms
Never, or shelvedthe ₹4,200 crore programme was a plan, not a build
Unknown — the current positionevery tenant and every broker is guessing differently

The last row is where the market actually is. A 32 MW pipeline with no published date is not neutral information — it changes how incumbents price renewals and how tenants structure options, and it does so differently for each player.

The specific advice for a Chennai tenant: ask for a handover date in writing before signing a 2028 renewal at today’s rate, and treat the 32 MW as arriving in 2029 unless someone can show you a construction schedule.

The one question for STT

When do Chennai 3 and 4 hand over. Two dates would resolve the biggest unknown in the Tamil Nadu market and they are the cheapest facts in this file.

The company clearly knows. It has a ₹4,200 crore programme, a construction contractor and a commissioning sequence.

4Procurement

Procurement window and scope
Gridvik assessment · 22 Oct 2026
What to buy here
Forward capacity in Chennai 3, contracted before handover — the only way to secure Chennai supply at a known price
Who holds the answer
STT GDC India commercial team for Tamil Nadu
The one question
When does Chennai 3 hand over, and how much of the 15 MW is pre-let
Why they will answer it
Forward leasing is how Chennai is sold, and the early tenants get the terms
Gridvik estimate
Chennai 3 delivers in 2027 with a pre-let anchor and Chennai 4 follows in 2028. Labelled an estimate
What changes it
A handover date, a pre-let announcement, or a construction milestone
All estimates are labelled as estimates. No tender dates claimed, no private contact data published.
Unlock GridFeed →

5Limits and open questions

  • No handover date. The single most important missing fact in Tamil Nadu.
  • No racks, floor area or PUE. The building’s density ceiling is unknown.
  • No construction milestone. Under construction covers everything from piling to fit-out.
  • The ₹4,200 crore programme is unscoped and cannot be matched to this building.
  • Counted at zero, correctly, because it does not exist yet — unlike some competitors’ counted pipeline.
  • What would close it. A handover date and a design density.

6Sources

Sources: STT GDC India Chennai city page, STT GDC India Chennai multi-campus expansion announcement, STT GDC India facility pages for Chennai, STT GDC India corporate site, and Indian market commentary on Chennai data centre supply and rents.