Facility record · Verified 26 Oct 2026

STT GDC Ahmedabad 1 — GujaratSTT GDC India · Ahmedabad · 4 MW on the card, about 3 MW in narrative, counted

Record PRJ-148Gujarat — AhmedabadTier C — counted, with an internal conflict4 public sources checkedAdditive: yes — 4 MW counted
Counted in the total4 MW or 3 MWFacilityOne of only two counted STT records
4MW
Card capacity
3MW
Narrative figure
25%
Internal conflict
5MW
Counted in Gujarat
3,168MW
Announced in Gujarat
634×
Announced to counted

STT GDC Ahmedabad 1 is 4 MW on the facility card and about 3 MW in the page narrative — a 25% disagreement inside one record. It is counted at 4 MW anyway, because it is a standalone facility with no parent aggregate, which makes it one of only two STT records in this entire registry that contribute anything to a total. The other is Jaipur. Everything else STT publishes — including 133 MW in Mumbai and 68 MW in Chennai — counts nothing. Gujarat itself publishes 3,168 MW of announcements and counts 5 MW. This building is four of them.

1At a glance

Operator
STT GDC India
Facility
Ahmedabad 1, Gujarat
Card capacity
4 MW — the figure this registry counts
Narrative capacity
About 3 MW in the page prose
The conflict
1 MW, or 25% of the record, unresolved
Why it counts
A standalone facility with no parent aggregate, unlike every other STT record
The other one
Jaipur 1 at 6 MW is the only other counted STT record
Gujarat context
3,168 MW announced across the state, 5 MW counted
Additivity
Additive. 4 MW counted in this registry

2Four or three

This is the smallest version of the same problem that appears across the whole estate, and it is the one that matters most because this record is actually used.

Ahmedabad 1 cardthe figure this registry counts4 MWPage narrativethe figure in prose3 MWThe gap25% of the record, unresolved1 MWFour megawatts on the card, three in prose. One of only two STT records that counts in this registry, and it disagrees with itself by a quarter.
Figure 1The card value that gets counted, the narrative figure that does not, and the gap between them.
What each figure would mean
If the building isThenEffect on the total
4 MW of power capacitythe card is a facility figure4 MW counted, basis unlabelled
4 MW of design capacity with 3 MW installedthe narrative is currentthe total is 25% high
3 MW of IT load inside a 4 MW envelopeboth are right, at different levelsthen 4 MW is the facility and 3 MW is the IT load

The third reading is the most likely and the least stated. A building with 4 MW of electrical capacity serving 3 MW of IT load implies a small amount of plant overhead — which is what a well-run facility looks like.

The registry counts 4 MW because the card is the artifact that reconciles, and records the 3 MW in the notes. That is defensible but it is not clean, and the honest position is that this record is a 3-or-4 megawatt building about which the operator has published two numbers.

3The only counted STT record with a problem

The pattern across the STT estate is now unambiguous, and this record proves it.

What counts and what does not
RecordPublishedHas a parent aggregate?Counted
STT Mumbai portfolio133 MWyes — itself0
STT Chennai portfolio68 MWyes — itself0
STT Noida portfolio63 MWyes — itself0
STT Pune portfolio40 to 81 MWyes — itself0
STT Kolkata portfolio9 MWyes — itself0
STT Delhi portfolio12 MWyes — itself0
STT Bengaluru portfolio23 MWyes — itself0
STT Hyderabad portfolio6 MWyes — itself0
STT Ahmedabad 14 MWno4 MW
STT Jaipur 16 MWno6 MW

Two records count, and they are the two cities where STT runs a single building and publishes no portfolio. Everything else — 354 MW of published city portfolios — counts nothing.

The conclusion is uncomfortable and worth stating: this registry gives countability to operators who publish least. A company that publishes a well-structured portfolio is excluded; a company that publishes one card per city is counted. That is the opposite of the intended incentive.

What this record is worth

Four megawatts is not the finding. The finding is that a 4 MW record with a 25% internal conflict is counted, while a 133 MW portfolio with exact reconciliation is not.

That single asymmetry is the strongest possible argument for fixing the additivity model before selling any state total.

4Gujarat, announced and counted

Gujarat is the widest announcement-to-reality gap in the file, and this building sits at the bottom of it.

Gujarat, in four numbers
RecordMWCounted
Reliance Jamnagar 3 GW AI DC cluster3,000no — announced
Reliance–Meta Jamnagar built-to-suit168no — announced
STT Ahmedabad 144
Yotta GIFT City G111
State total3,173 published5 MW counted

A ratio of 634 to one. Gujarat has the largest single data centre announcement in the country — Reliance’s 3 GW Jamnagar cluster — and five megawatts of counted capacity, four of which are this building.

That is not a Gujarat problem specifically. It is what a state looks like when a single mega-announcement dwarfs a thin existing market, and it is the reason announcement totals are worthless as supply forecasts.

5Procurement

Procurement window and scope
Gridvik assessment · 22 Oct 2026
What to buy here
The only counted STT capacity in western India outside Mumbai, and the 3-or-4 MW question
Who holds the answer
STT GDC India west region sales
The one question
Is the building 4 MW of facility capacity with 3 MW of IT load, and is any free
Why they will answer it
Gujarat has a 3 GW announcement and 5 MW of real capacity, so existing space is scarce in practice
Gridvik estimate
The building is operating at about 3 MW of IT load in a 4 MW envelope. Labelled an estimate
What changes it
A clarification of the two figures, or a rack count
All estimates are labelled as estimates. No tender dates claimed, no private contact data published.
Unlock GridFeed →

6Limits and open questions

  • 4 MW against 3 MW in one record. The conflict is unresolved and the larger figure is the one counted.
  • No stage, racks, floor area or PUE.
  • No stated basis for either figure.
  • Single source. No directory corroborates either number.
  • The record is used in totals, which makes the conflict more consequential than it would be in an uncounted portfolio.
  • What would close it. A statement that the 4 MW is facility capacity and the 3 MW is IT load. That would resolve it entirely.

7Sources

Sources: STT GDC India Ahmedabad city page, STT GDC India facility pages for Ahmedabad, STT GDC India corporate site, Reliance Jamnagar announcement material for the Gujarat comparison, and Indian market commentary on the Gujarat data centre market.