NTT Mumbai 6 — Andheri East, MaharashtraNTT Global Data Centers · Andheri East, Mumbai · 19.2 MW critical IT load, operational

Record PRJ-151Maharashtra — MumbaiTier A — dated and specified4 public sources checkedAdditive: yes — 19.2 MW counted
IT load statedOperationalCounted in fullThe only large site off-campus
19.2MW
Critical IT load
161MW
NTT Mumbai, counted
12%
Of the NTT Mumbai total
1
Large NTT buildings outside Chandivali
85%
Of NTT Mumbai is in Chandivali
0
Portfolio aggregates

NTT Mumbai 6 in Andheri East is 19.2 MW of critical IT load, operational, and counted. It matters structurally rather than commercially: it is the only large NTT Mumbai building outside Chandivali, where the company runs 136 MW across four buildings — 85% of its Mumbai capacity. Which makes this the only large NTT site in the city with independent power, cooling and fibre from that cluster. In a market where everyone else’s capacity is concentrated on one node, a second node is worth more than its megawatts say.

1At a glance

Operator
NTT Global Data Centers
Facility
Mumbai 6, Andheri East, Mumbai
Capacity
19.2 MW critical IT load — basis stated
Stage
Operational
Position
12% of NTT’s 161 MW counted in Mumbai
Structural role
The only large NTT Mumbai building outside the Chandivali cluster
Chandivali concentration
136.1 MW across four buildings, or 85% of the Mumbai total
Racks, floor area, PUE
Not published for this building
Additivity
Additive. 19.2 MW counted in this registry

2The only large site off-campus

NTT Mumbai looks like five buildings. Geographically it is one campus and three small satellites.

ChandivaliMumbai 5, 7, 8 and 9136.1 MWAndheri EastMumbai 619.2 MWVikhrolitwo small exchange sites5.4 MWFortthe BSE exchange site0.3 MWEighty-five per cent of NTT's Mumbai capacity is in one suburb. The city portfolio is really a Chandivali campus with three satellites.
Figure 1NTT Mumbai capacity by location. Navy is the Chandivali cluster; everything else is the tail.
NTT Mumbai by location
LocationMWBuildingsShare
Chandivali136.1Mumbai 5, 7, 8 and 985%
Andheri East19.2Mumbai 612%
Vikhroli5.4two exchange sites3%
Fort0.3the BSE site0.2%
Total1618 records—

This is the same concentration pattern documented across every operator in this file — STT in Navi Mumbai, CtrlS in Mahape and Airoli, NTT in Chandivali. Indian data centre capacity clusters at the suburb level, not the city level, because power, fibre and land all arrive at specific points.

Mumbai 6 is therefore a genuinely different asset from its four siblings. It has its own utility connection, its own fibre routes and its own water supply, which means a grid event at Chandivali does not take it down.

3Concentration, and what the second node is worth

For a tenant, node redundancy is usually bought across cities. This is the rare case of buying it across ten kilometres.

What a second node buys
RiskChandivali clusterAndheri East
Grid event at the substationaffects 136 MW at onceunaffected
Fibre route cutone landing patha different path
Water restrictionshared municipal supplyindependent supply
Flooding or local restrictioncampus-widesite-specific
Transport and accessone road networka different one

None of these risks is theoretical in Mumbai. The city floods, its grid is stressed in summer, and its water supply is administered. A tenant with a genuine availability requirement will pay for a second node inside the same metropolitan area, and there is limited supply of exactly that.

Which is the commercial argument for this building: 19.2 MW is not large, but it is the only large capacity in the NTT Mumbai estate that is not on the same site as everything else.

4Procurement

Procurement window and scope
Gridvik assessment · 22 Oct 2026
What to buy here
Node-redundant capacity inside Mumbai — the same city, a different power and fibre path
Who holds the answer
NTT Global Data Centers India commercial team
The one question
Are Mumbai 6 and Chandivali on separate utility feeds and separate fibre routes
Why they will answer it
Nodal separation is the product here, and it is the first question any resilience-driven tenant asks
Gridvik estimate
The sites are independently fed and the building is substantially let to enterprise tenants. Labelled an estimate
What changes it
A design density, a rack count, or a PUE
All estimates are labelled as estimates. No tender dates claimed, no private contact data published.
Unlock GridFeed →

5Limits and open questions

  • No rack count or floor area published for this building.
  • No PUE stated, and unlike Mumbai 7 there is no facility-power figure to derive it from.
  • No commissioning date on the card.
  • Node independence is inferred from geography and separate addresses, not from a published utility or fibre statement.
  • No tenant information.
  • What would close it. A rack count and a confirmation of independent feeds. Both are standard diligence questions.

6Sources

Sources: NTT Global Data Centers Mumbai facility pages, NTT India corporate site, Data Center Dynamics reporting on NTT’s Mumbai launches, and Indian market commentary on the Chandivali and Andheri data centre nodes.