Get Free Teaser
Facility record · Verified 26 Oct 2026

NTT Mumbai 8 — Chandivali, MaharashtraNTT Global Data Centers · Chandivali, Mumbai · 36 MW facility, 2,800 racks, 12.9 kW per cabinet

Record PRJ-153Maharashtra — MumbaiTier A — dated and specified5 public sources checkedAdditive: yes — 36 MW counted
Rack count publishedOperational, 2026 launchCounted in fullDensity 60% above the Indian average
36MW
Facility capacity
2,800
Racks
12.9kW
Per rack, facility power
8.7kW
Per rack, at 1.48 PUE
1,800
Racks it would hold at 20 kW
2
Rack counts published in this registry

NTT Mumbai 8 in Chandivali is a 36 MW facility with 2,800 racks — 12.9 kW per cabinet on facility power, or about 8.7 kW on IT load at the PUE established on the neighbouring building. It and Mumbai 9 are the only two buildings in this registry where a rack-level density can be calculated from published figures instead of assumed. Twelve point nine kilowatts a cabinet is roughly 60% above the Indian market average this file has been computing from assumed densities. That single pair of numbers changes what Mumbai capacity is actually worth.

1At a glance

Operator
NTT Global Data Centers
Facility
Mumbai 8, Chandivali, Mumbai
Capacity
36 MW facility capacity
Racks
2,800 — published
Density, facility basis
12.9 kW a rack
Density, IT basis
about 8.7 kW a rack at the 1.48 PUE established on Mumbai 7
Stage
Operational, launched 2026
Basis caveat
Facility power, not IT load — the 36 MW is not comparable with the 25.6 MW at Mumbai 7
Additivity
Additive. 36 MW counted in this registry

2The only calculable density in Mumbai

Across ninety pages of this registry, density has been bracketed because rack counts are unpublished. Two buildings break that.

Mumbai 8 — this record36 MW facility, 2,800 racks12.9 kW facilityMumbai 962 MW facility, 6,000 racks10.3 kW facilityMumbai 8 at a 1.48 PUEIT load implied8.7 kW ITSTT Navi Mumbai, at 8 kW assumedno rack count publishedassumedTwo buildings in this file publish both a power figure and a rack count. Both are NTT Chandivali, and neither is Indian-market average.
Figure 1Densities that can be computed rather than assumed. Red is this record. Navy is its sibling. Pale is the assumption the rest of the file has been forced to use.
The two calculable densities
BuildingPowerRackskW a rackBasis
Mumbai 836 MW2,80012.9facility power
Mumbai 962 MW6,00010.3facility power
Mumbai 8 on IT loadabout 24.3 MW2,8008.7at 1.48 PUE, an estimate
Everything else in this registrypublishednot publishedbracketedassumption

Both figures are facility-basis, which means they include cooling and losses. Converting to IT basis at the PUE derived on Mumbai 7 gives roughly 8.7 kW and 7.0 kW respectively. Those are still well above the 4 to 6 kW this file has assumed for Indian legacy stock.

The honest conclusion: Mumbai’s newest Chandivali halls are dense buildings, and the market average computed from older assumed densities understates them considerably.

3Why 12.9 kW matters

Density is the number that decides whether a building can serve the demand that now exists.

What density decides
DensityWhat it can hostStatus in 2026
4 to 6 kW a rackgeneral enterprise, storage, virtualisationthe legacy Indian stock
8 to 10 kW a rackdenser enterprise, contained aisles, some HPCcurrent market build
12 to 15 kW a rackhigh-performance compute, accelerated clusters with rear-door coolingthis building
20 to 40 kW a rackAI training nodes, requires direct-to-chip liquidthe frontier

At 12.9 kW on facility power this is a building that can serve serious accelerated compute without a liquid retrofit, provided the cooling distribution supports it. That is a materially different commercial proposition from a 5 kW hall.

And it is why the absence of rack counts elsewhere matters. Every density claim about Indian data centres in every market report is built on assumptions, and the two buildings where the arithmetic is possible both come out well above the assumed average.

4What it means for AI load

The AI question in Indian data centres is almost entirely a cooling question, and rack count is how you answer it.

How many AI racks would fit
If the hall were re-configured forRacks at 36 MW facilityChange from 2,800
12.9 kW — the published density2,800—
20 kW — liquid-cooled1,800−36% of the cabinets
30 kW — dense AI training1,200−57% of the cabinets
40 kW — top of the current range900−68% of the cabinets

This is the arithmetic that makes AI capacity expensive: the same megawatts fit in fewer and fewer cabinets, and each cabinet needs more cooling, more weight tolerance and more power distribution per square foot. A building designed for 12.9 kW cannot simply be filled with 40 kW racks without rebuilding the floor.

So the useful question for any Indian data centre is not "how many megawatts" but "how many cabinets, at what density, with what cooling". NTT answers two-thirds of that here. Nobody else in this file answers any of it.

The missing field across the market

Rack count is the cheapest disclosure an operator can make and the most valuable one a tenant can receive. Two operators in this file publish it.

Without it, every density figure in the Indian market — including most of this registry — is an assumption.

5Procurement

Procurement window and scope
Gridvik assessment · 22 Oct 2026
What to buy here
Dense capacity in a 2026 Chandivali hall, at a density that can serve accelerated compute without retrofit
Who holds the answer
NTT Global Data Centers India commercial team
The one question
What is the per-rack cooling capacity, and can the floor take 20 kW cabinets
Why they will answer it
Density is their differentiator and they publish the rack count to prove it
Gridvik estimate
The building supports rear-door cooling at 12 to 15 kW and is filling through 2027. Labelled an estimate
What changes it
A cooling specification, an operating PUE, or an occupancy figure
All estimates are labelled as estimates. No tender dates claimed, no private contact data published.
Unlock GridFeed →

6Limits and open questions

  • 36 MW is facility power, not IT load. It is not comparable with Mumbai 7’s 25.6 MW IT figure.
  • The IT density of 8.7 kW is an estimate derived from a PUE measured on a different building.
  • No cooling specification. Supporting 12.9 kW is not the same as being able to take 20 kW.
  • No floor area, so square-feet density cannot be computed either.
  • No occupancy or tenant information.
  • What would close it. A cooling specification and an operating PUE. Both would resolve the AI-readiness question for this building.

7Sources

Sources: NTT Global Data Centers Mumbai 8 facility page, Data Center Dynamics reporting on the Mumbai 8 launch and its 2,800-rack count, NTT India corporate site, and Indian market commentary on rack density and AI-ready data centre design.