Get Free Teaser
Facility record · Verified 26 Oct 2026

NTT Mumbai 9 — Chandivali, MaharashtraNTT Global Data Centers · Chandivali, Mumbai · 62 MW facility load · 6,000 racks · operational

Record PRJ-154Maharashtra — MumbaiTier A — dated and specified6 public sources checkedAdditive: yes — 62 MW counted
Operational since 20236,000 racks publishedFacility basis, not ITLargest in MumbaiMixed basis in the 161 MW total
62MW
Facility load
6,000
Racks
10.3kW
Facility kW per rack
17.2kW
Sold to MSE per rack
6.4MW
MSE lease, Jul 2026
38.5%
Of NTT Mumbai's 161 MW

NTT Mumbai 9 in Chandivali is 62 MW of facility load across 6,000 racks — the largest single data centre in Mumbai by megawatt, and about 39% of everything NTT counts in the city. Live since 2023. In July 2026 the Metropolitan Stock Exchange took 6.4 MW of IT load in it, at 52U racks of up to 17.2 kW. That lease is the whole story of the Indian market in two numbers: the building was designed to average 10.3 kW per cabinet, and its most public tenant is buying 17.2. Capacity is being sold twice as dense as it was built. On a facility basis the IT inside is roughly 42 MW at NTT's own 1.48 ratio — which means the number the market quotes and the number a tenant can use differ by twenty megawatts.

1At a glance

Operator
NTT Global Data Centers — NTT DATA, formerly Netmagic
Facility
Mumbai 9, Chandivali, Andheri East, Mumbai
Capacity
62 MW facility load — IT load not published
Racks
6,000 — the largest rack count published anywhere in this registry
Stage
Operational — scheduled Q2 2023, opening reported January 2024
Est. IT inside
about 42 MW at a 1.48 ratio — an estimate, not a published figure
Building
Listed at Lighthall, G Wing, Hiranandani Business Park — floors 3, 4, 5, 6 and 9
Anchor tenant
Metropolitan Stock Exchange, 6.4 MW, announced 3 July 2026
Counted
Additive. 62 MW counted in this registry, on a facility basis

2The largest building in Mumbai

Market listings rank NTT Chandivali DC9 as the largest data centre in Mumbai at 62 MW. Nothing else in this registry comes close: the next largest single building is Mumbai 8 at 36 MW, in the same campus.

Mumbai 9Chandivali, facility load62 MW facilityMumbai 7Chandivali, 25.6 MW IT inside38 MW facilityMumbai 8Chandivali, IT load not stated36 MW facilityMumbai 6Andheri East, critical IT load19.2 MW ITMumbai 5Chandivali, critical IT load12.5 MW ITVikhroli2.4 MW IT, 6 MVA facility6 MVAVikhroli IV3 MW IT, 4 MVA facility4 MVABSE, Fort0.3 MW IT, 1 MW facility1 MW facilityNavy and blue are facility load. Red is critical IT load. Pale is MVA, which converts to nothing without a power factor.
Figure 1All eight NTT Mumbai records. The chart is deliberately mixed-basis, because that is how the market publishes: four of these bars cannot be added to the other four without a ratio.

The first thing to notice is not the size. It is that four different units are in play across eight buildings from one operator in one city.

Eight NTT Mumbai buildings, and what the number actually is
BuildingLocationFigureBasisRacks
Mumbai 9Chandivali62 MWfacility load6,000
Mumbai 7Chandivali38 MW / 25.6 MWfacility / ITnot published
Mumbai 8Chandivali36 MWfacility load2,800
Mumbai 6Andheri East19.2 MWcritical IT loadnot published
Mumbai 5Chandivali12.5 MWcritical IT loadnot published
Vikhroli IVVikhroli West3 MW / 4 MVAIT / facility in MVAnot published
VikhroliVikhroli West2.4 MW / 6 MVAIT / facility in MVAnot published
BSEFort0.3 MW / 1 MWIT / facilitynot published
The registry total is honest, and it is not clean

NTT Mumbai counts 161 MW in this registry across all eight additive records. Three of those numbers are critical IT load, three are facility load, and two are MVA.

That is a mixed basis and there is no way around it until the operator publishes IT and facility load for every building, as it already does for Mumbai 7.

Sixty-two megawatts of facility load is not sixty-two megawatts a tenant can rent. At NTT's own 1.48 ratio, the rentable IT inside Mumbai 9 is about 42 MW.

36,000 racks, and a tenant at 17.2 kW

Mumbai 9 publishes a rack count, which almost nothing else in this country does. Divide 62 MW by 6,000 cabinets and the design average is 10.3 kW per rack. That is a normal, modern, air-cooled number.

MSE contract, Jul 202652U racks at up to 17.2 kW17.2 kWMumbai 82,800 racks, 36 MW facility12.9 kWMumbai 9 design average6,000 racks, 62 MW facility10.3 kWMumbai 517,000 sq ft server spaceest. 8.7 kWVikhroli and Vikhroli IVoperator page: 3 to 6 kVA per rack6 kVA ceilingThe 17.2 kW and 12.9 kW figures are published. The 10.3 kW is 62 MW divided by 6,000 racks. The 8.7 kW is an estimate, using Mumbai 7's 1.48.
Figure 2Solid red is what a tenant is actually buying. Navy and blue are the building averages. Pale is the previous generation of NTT's own Mumbai stock.

Then in July 2026 NTT announced that the Metropolitan Stock Exchange — a SEBI-recognised national exchange running a relaunch — had taken 6.4 MW of IT load in the Chandivali campus, on 52U racks at up to 17.2 kW.

What the MSE lease implies
MeasureValueNote
Contracted IT load6.4 MWsingle named tenant, July 2026
Contracted rack power17.2 kW52U cabinets, high-density configuration
Cabinets that impliesabout 3726,400 kW divided by 17.2 kW
Share of Mumbai 910.3%on a facility basis
Density versus design average1.67x17.2 against 10.3 kW per rack
Density versus Vikhroli legacy2.9x to 5.7x3 to 6 kVA per rack on the older sites

A ten-megawatt lease taking a tenth of the building is not the interesting part. The interesting part is that a building designed at 10.3 kW per cabinet is being read on July 2026 terms at 17.2 kW — because trading engines and AI surveillance workloads do not fit in eight kilowatts.

The density question nobody answers

For every megawatt at 17.2 kW you need 58 cabinets. At 10.3 kW you need 97, and at the legacy 5 kVA you need 200.

Floor space, cooling and the power distribution downstream of the UPS all scale with cabinets, not with megawatts. That is why a 62 MW shell built for the 2022 market is already being reconfigured for the 2026 one.

4What the campus arithmetic says

Mumbai 9 sits inside the Chandivali campus, which NTT has described as India’s first operational hyperscale data centre park and which it says will reach 250 MW of facility load at full build-out.

Chandivali, measured against its own build-out
MeasureFigureWhere it comes from
Campus build-out250 MWNTT statements since the 2022 NAV1 launch
Counted today, 5 buildings136.1 MWMumbai 5, 7, 8, 9 plus Mumbai 6 in Andheri East on 161 MW
Share of build-out54%136.1 of 250 — facility and IT mixed
Racks implied at 250 MWabout 19,000 to 24,000at 10.3 to 12.9 kW per cabinet
Campus floor spaceover 1,000,000 sq ftNTT, at the Mumbai 7 launch
Balaji IT Park purchaseRs 559.24 croreabout 30,000 sq m, January 2026, from Jeetendra and Tusshar Kapoor

The arithmetic holds together. A 250 MW campus at 10 to 13 kW per cabinet needs roughly 20,000 to 24,000 racks; Mumbai 8 and 9 alone contribute 8,800 of them, and the campus was already at 13,000 racks when Mumbai 7 launched in 2022.

The Rs 559 crore Balaji purchase is the part worth pricing. Thirty thousand square metres of Mumbai commercial floor, bought specifically to extend a data centre campus, is about Rs 18,600 per square foot — and that is the land-and-shell cost before a single megawatt of electrical capacity is installed.

5Timeline

  • NTT earmarks USD 2 billion for India data centre and solar expansion.
  • Mumbai 7 goes live in Chandivali; campus described as 13,000 racks and 100 MW of load.
  • Mumbai 9 scheduled live at 62 MW and 6,000 racks.
  • Opening of the 62 MW Mumbai 9 confirmed alongside the Noida 2 campus launch.
  • NTT buys Balaji IT Park space in Chandivali for Rs 559.24 crore.
  • Metropolitan Stock Exchange contracts 6.4 MW of IT load at up to 17.2 kW per rack.
  • Record verified for this registry. 62 MW counted on a facility basis.

6Procurement

Procurement window and scope
Gridvik assessment · 22 Oct 2026
What to buy here
Large-block Mumbai capacity with published rack counts and a named financial-exchange tenant
Where the capacity is
Chandivali, Andheri East — India’s largest operational data centre park by NTT’s own description
Who holds the answer
NTT Global Data Centers India commercial team
The one question
What is the contracted IT load per cabinet available today, and at what PUE is it billed
Why they will answer it
They published 6.4 MW at 17.2 kW in July 2026; the density story is theirs to sell
Gridvik estimate
Mumbai 9 has room for roughly 1,000 to 1,500 more high-density cabinets before the 62 MW facility load is committed. Labelled an estimate
What changes it
A published IT load for Mumbai 9, or a cooling specification beyond 17.2 kW
All estimates are labelled as estimates. No tender dates claimed, no private contact data published.
Unlock GridFeed →

7Limits and open questions

  • 62 MW is facility load, not IT load. It is not comparable with Mumbai 5 at 12.5 MW or Mumbai 6 at 19.2 MW. The 42 MW IT figure on this page is derived at 1.48 and is labelled an estimate.
  • The 161 MW Mumbai total is mixed-basis. Three IT, three facility, two MVA. Treating it as a single number overstates NTT’s rentable capacity.
  • The Q2 2023 schedule and the January 2024 opening are a year apart. Both are published; the record keeps the earlier scheduled date and the later confirmed one.
  • The floors 3, 4, 5, 6 and 9 listing is a directory entry, not an operator statement. It may indicate a multi-floor fit-out rather than a purpose-built shell. Unresolved.
  • No PUE is published for Mumbai 9. The 1.48 used here belongs to Mumbai 7.
  • No floor area, no cooling specification, no occupancy figure.
  • What would close it. A published IT load and a stated PUE for this building would turn a market headline into a rentable number.

8Sources

Sources: NTT Global Data Centers Mumbai 9 facility page, Data Center Dynamics reporting on the Mumbai 9 opening and the MSE selection, Mingtiandi on the January 2024 opening, NTT and Business Wire announcement of the MSE 6.4 MW lease, Baxtel Mumbai market listings, TIA facility directory for BOM9, and The Hindu BusinessLine on the Balaji IT Park purchase.