Facility record · Verified 26 Oct 2026

NTT Chennai 1 — Chennai, Tamil NaduNTT Global Data Centers · 67 Mathiravedu, Velappanchavadi, Poonamallee High Road, Chennai · 2 MW critical IT load · 1,500 m² server space

Record PRJ-166Tamil Nadu — ChennaiTier A — operator-stated5 public sources checkedAdditive: yes — 2 MW counted
IT load statedServer space statedDensest NTT floor in India3 to 6 kVA per rackCounted in full
2MW
Critical IT load
1,500m²
Server space
16,145sq ft
Converted
~36sq ft
Per cabinet, est.
3–6kVA
Per rack
2012
Came in with Netmagic

NTT Chennai 1 on Poonamallee High Road carries 2 MW of critical IT load across 1,500 square metres of server space — about 16,145 square feet, or 8,073 square feet per megawatt. That makes it the tightest floor NTT publishes anywhere in India: 40% less space per megawatt than its own hyperscale halls at 13,300, and a fraction of the 80 square feet per cabinet at NAV1A. It is a cage-based colocation hall with 3 to 6 kVA racks, and it arrived with the 2012 Netmagic acquisition, not with a launch. The operator still describes it as ranked number one in the local market, which is the same sentence its Noida facility carries, while NTT’s own 34.8 MW Chennai 2 campus stands nine kilometres away. Chennai 1 is 0.7% of the capacity this registry counts in Tamil Nadu.

1At a glance

Operator
NTT Global Data Centers — acquired as Netmagic Chennai in 2012, folded into Global Data Centers in January 2020
Facility
Chennai 1, 67 Mathiravedu, Velappanchavadi, Poonamallee High Road, Chennai
Capacity
2 MW critical IT load — operator-stated
Server space
1,500 m² — about 16,145 sq ft
Floor intensity
8,073 sq ft per MW of IT — the densest in NTT’s Indian estate
Rack power
3 to 6 kVA per rack, N+N UPS
Positioning
Carrier neutral, multiple fibre paths, managed and remote-hands services on site
Stage
Operational — in the estate since 2012
Counted
Additive. 2 MW counted in this registry

2The densest floor NTT publishes

For once the interesting number is not the megawatts. It is the square feet.

Vikhroli, 20123,000 sq m, 2.4 MW13,455 sq ftNoida 2 A, 2024building area, 22.4 MW13,393 sq ftNAV1A, 2022building area, 30 MW13,333 sq ftNoida 1, 20111,800 sq m, 1.5 MW12,917 sq ftChennai 1, 20121,500 sq m, 2 MW8,073 sq ftChennai 1 is the tightest floor NTT publishes anywhere in India — 40% less space per megawatt than its own hyperscale halls.
Figure 1Every NTT facility in this registry where the operator or a listing publishes both a capacity and a floor figure. Chennai 1 is the outlier, and the outlier is informative.
The floor arithmetic
MeasureValueBasis
Server space1,500 m²operator-stated
Converted16,145 sq ftat 10.764 sq ft per m²
Critical IT load2 MWoperator-stated
Floor per MW8,073 sq ftthe tightest in the file
Cabinets at 4.5 kVAabout 4442,000 kW divided by 4.5
Floor per cabinetabout 36 sq ft16,145 divided by 444
Compare NAV1A80 sq ft per cabinet400,000 sq ft over 5,000 racks

Thirty-six square feet per cabinet against eighty. That is not an efficiency gain — it is a different product. A hyperscale hall has to leave room for plant, aisles, air handling and future density. A cage-based colocation hall in a metro building packs cabinets and sells 3 to 6 kVA each.

The consequence is real: this building carries 1.33 kW per square metre of server floor, against 0.81 at NAV1A. Tight floors are how small city colocation survives on expensive land — and why it cannot be filled with 17 kW cabinets.

Two product types, one operator

Chennai 1 is a dense, small, cage-based colo hall. Chennai 2, nine kilometres away, is a shell built for 17.4 MW per building.

Both are NTT, both are in this registry, and neither number tells you anything useful about the other. That is exactly what a market report that counts only megawatts gets wrong.

3A second stale ranking claim

The operator’s page for Chennai 1 says the facility is ranked number one in the local market. So does the page for Noida 1. Both were reasonable when written; neither has been updated.

Chennai, where the 2 MW sits
RecordCapacityStage
CtrlS Chennai park72 MW across two buildings1 million sq ft, Ambattur
STT GDC Chennai68 MW publishedeight city records
Nxtra Chennai46 MW headlinecards reconcile to 49
NTT Chennai 2 campus34.8 MW planned, 17.4 livetwo 9-storey buildings
CapitaLand / Clint, Ambattur34 MW13 data halls, opened October 2026
Iron Mountain Chennai42 MW23.2 MW in CHN-1
NTT Chennai 12 MWlive since 2012

Seven operators, a corridor that has become one of the four densest in India, and a 2 MW hall carrying a market-leader claim. The claim is not worth arguing with. It is worth dating.

What Chennai 1 does have is time. It has been running since 2012, it has carrier-neutral access with multiple fibre paths, and it has on-site staff doing remote hands. In a market where new capacity is sold before it is built, fourteen years of unbroken operation is a product.

4What 2 MW in a metro building is for

A small colocation hall inside a city exists for reasons that have nothing to do with capacity, and the specification makes them visible.

Reading the specification
FeatureWhat it tells you
3 to 6 kVA per rackEnterprise and mid-market workloads, not accelerated compute
N+N UPSRedundancy bought at the rack, not at the building
Multiple fibre paths, carrier neutralThe commercial reason the site exists: interconnect
Managed and remote-hands on siteCustomers who do not run their own staff in Chennai
36 sq ft per cabinetMetro land is expensive, so floor is packed
2 MW totalNot a site that can serve a hyperscaler at any density

Nine kilometres away the same operator runs a building with 17 times the capacity in a shell designed for hyperscale. Chennai 1 and Chennai 2 are not competing; they address different customers, and the gap between them is the clearest picture in this file of what changed in Indian data centres between 2012 and 2023.

For a buyer, Chennai 1 is a connectivity and proximity product with a hard ceiling. For a seller, it is a facility that will never be expanded, which makes it a stable but finite line in any portfolio.

5Procurement

Procurement window and scope
Gridvik assessment · 22 Oct 2026
What to buy here
Small-block Chennai colocation at 3 to 6 kVA per rack, with existing carrier presence and on-site engineering
Where the capacity is
Poonamallee High Road, west Chennai — not the Ambattur corridor where the new capacity is
Who holds the answer
NTT Global Data Centers India commercial team
The one question
How much of the 2 MW is available, and what is the facility load behind it
Why they will answer it
It is a legacy site with no expansion path and a connectivity proposition that stands on its own
Gridvik estimate
About 300 to 450 cabinets depending on the kVA taken, with most of the 2 MW committed. Labelled an estimate
What changes it
A published rack count, or a facility load figure for the site
All estimates are labelled as estimates. No tender dates claimed, no private contact data published.
Unlock GridFeed →

6Limits and open questions

  • The 1,500 m² is described as server space, and the 16,145 sq ft figure in directory listings appears to be the same number converted, not an independent building measurement. The floor intensity rests on that.
  • The 36 sq ft per cabinet is derived from a 4.5 kVA average inside a 3 to 6 kVA range. It is an estimate.
  • No facility load is published for Chennai 1, so no ratio can be computed.
  • “Ranked number one in the local market” is an undated operator marketing line. It is quoted, not corrected.
  • No PUE, no occupancy, no tenant list, no commissioning date beyond the 2012 Netmagic acquisition.
  • What would close it. A facility load and a rack count. Both are single lines on a facility page.

7Sources

Sources: NTT Global Data Centers Chennai 1 facility page, NTT DATA global data center locations index, Data Center Dynamics reporting on the Chennai 2 launch which quotes Chennai 1 at 2 MW across 1,500 sq m, Datacentermap listing for GDC Chennai 1, and Datacenters.com facility listing.