NTT Bengaluru 3 — Bengaluru, KarnatakaNTT Global Data Centers · Survey No. 146, Kajisonnenehali Village, Bidrahalli, Bengaluru · 12 MW critical IT load · 20 MVA facility load

Record PRJ-171Karnataka — BengaluruTier A — operator-stated5 public sources checkedAdditive: yes — 12 MW counted
IT load stated20 MVA, not MWBreaks the 13,300 floor constantFloor area publishedCounted in full
12MW
Critical IT load
20MVA
Total facility load
1.50
Ratio at 0.9 pf
5,800m²
Data centre space
5,203sq ft
Per MW of IT
16.5MW
NTT additive in Karnataka

NTT Bengaluru 3 carries 12 MW of critical IT load and 20 MVA of total facility load across 5,800 square metres of data centre space. Twenty megavolt-amperes at a 0.9 power factor is 18 MW, which puts the ratio at 1.50 — exactly the house standard, and the second building in this registry to confirm it. Read naively, MVA against MW, it looks like 1.67. The floor figure is where this page earns its place. Twelve megawatts in 5,800 square metres is 5,203 square feet per megawatt. The constant published on record PRJ-164, built from four other NTT buildings, was 13,300. Bengaluru 3 sits 61% below it, and Bengaluru 4 sits 80% below it. Six NTT buildings, one metric, a five-fold spread. That constant has been withdrawn, and this page says why.

1At a glance

Operator
NTT Global Data Centers — NTT DATA
Facility
Bengaluru 3, Survey No. 146, Kajisonnenehali Village, Bidrahalli, Bengaluru
Capacity
12 MW critical IT load — operator-stated
Facility load
20 MVA — operator-stated, in MVA not MW
Ratio
1.50 at a 0.9 power factor; 1.67 if MVA is read as MW
Data centre space
5,800 m² — about 62,430 sq ft, or 5,203 sq ft per MW
Stage
Operational
Additivity
Additive. 12 MW counted; with Bengaluru 2, NTT’s 16.5 MW of counted Karnataka capacity
Racks, PUE
Not published for this building

2The constant that broke

Record PRJ-164 published a claim worth repeating precisely, because it is now being withdrawn: that four NTT buildings between 2011 and 2024 all land within 4% of 13,300 square feet of floor per megawatt of critical IT load.

Bengaluru 417,000 sq m of data centre space2,722 sq ftBengaluru 35,800 sq m of data centre space5,203 sq ftChennai 11,500 sq m of server space8,073 sq ftNoida 1about 1,800 sq m of server space12,917 sq ftNAV1A400,000 sq ft of building13,333 sq ftVikhroli3,000 sq m of server space13,455 sq ftSix NTT buildings, one metric, a five-fold spread. The floor-per-megawatt constant published on record PRJ-164 does not survive Bengaluru.
Figure 1Square feet of published floor per megawatt of IT, six NTT buildings. Navy is the cluster that suggested a constant. Red is where it failed.
The six buildings, and the definitions behind them
BuildingFloor figuresq ft per MWAs published
Bengaluru 417,000 m²2,722data centre space, whole campus
Bengaluru 35,800 m²5,203data centre server space
Chennai 11,500 m²8,073data centre server space
Noida 1about 1,800 m²12,917data centre server space
NAV1A400,000 sq ft13,333building area
Vikhroli3,000 m²13,455server space

Look at the last column. The two buildings at the extremes are described with the same phrase — data centre space — and differ by a factor of nearly two. Vikhroli and Bengaluru 3 both report "server space" and land at 13,455 and 5,203.

So the constant was not a design standard. It was an artefact of four buildings whose published definitions happened to coincide. With six data points the spread is five-fold and the metric is unusable as a predictor.

Correction published

Record PRJ-164 states that NTT’s buildings share a 13,300 square foot per megawatt constant and uses it to estimate an unbuilt building’s floor area.

That estimate is withdrawn. The underlying figures on PRJ-164 are unchanged and still correct; the generalisation drawn from them is not supported once Bengaluru is included.

This is what the registry is for. A pattern that survives four records can fail on the fifth, and the honest response is to say so on the next page rather than quietly stop using it.

320 MVA against 12 MW

The ratio question again, and this building is a clean illustration of why the unit matters more than the number.

The 20 MVA figure, three ways
AssumptionFacility loadRatio to 12 MWComment
Naive, MVA read as MW20.0 MW1.67what most comparisons do
Power factor 0.918.0 MW1.50the working figure on this page
Power factor 0.8517.0 MW1.42typical for older plant
Per-feed reading, dual feedabout 36 MW3.00implausible for 5,800 m²

At 0.9 the answer is 1.50, which makes Bengaluru 3 the second independent confirmation of NTT’s house ratio after NAV1A. That is more useful than the building itself: two buildings, two cities, two different published units, same ratio.

It also means the 1.67 on the previous record — Bengaluru 2 — is the outlier rather than the pattern. Bengaluru 2 publishes 4.5 and 7.5 as megawatts, so no power factor is needed and its 1.67 stands. Bengaluru 3 only looks like it.

Read together, the two Bengaluru records bracket the floor on overhead: somewhere between 4.5 MW and 12 MW, a hall stops paying a disproportionate share of its own plant.

4What 5,203 square feet per megawatt means

If the floor figures cannot be compared across buildings, what can they say on their own? For Bengaluru 3, quite a lot.

Bengaluru 3 from its own numbers
MeasureValueBasis
Critical IT load12 MWoperator-stated
Data centre space5,800 m² / 62,430 sq ftoperator-stated
Power per square metre of data space2.07 kW/m²12,000 divided by 5,800
Facility load per square metre3.10 kW/m²18 MW over 5,800 m²
Compare NAV1A0.81 kW/m²on a building-area basis
Compare Chennai 11.33 kW/m²on a server-space basis

Two point zero seven kilowatts per square metre of data hall is a dense floor. It is consistent with a hall built for higher-density racks than Chennai 1’s 3 to 6 kVA, and it sits well above NAV1A on the same measure.

The registry’s position on all floor figures, stated plainly: they are only usable within a record, not across records, because "data centre space", "server space" and "building area" are used interchangeably by operators and mean different things. Any market report that divides megawatts by square feet across operators is producing a number with no meaning.

5Procurement

Procurement window and scope
Gridvik assessment · 22 Oct 2026
What to buy here
Bengaluru capacity in the city’s northern corridor, at a density above the older Electronic City halls
Where the capacity is
Bidrahalli, north Bengaluru — not Electronic City
Who holds the answer
NTT Global Data Centers India commercial team
The one question
What is the rack count and the kW per cabinet, and how much of the 12 MW is uncommitted
Why they will answer it
It is a fully published site with both an IT and a facility figure, which most sites do not have
Gridvik estimate
About 800 to 1,500 cabinets at 8 to 15 kVA, with most of the 12 MW committed. Labelled an estimate
What changes it
A rack count, or a PUE
All estimates are labelled as estimates. No tender dates claimed, no private contact data published.
Unlock GridFeed →

6Limits and open questions

  • 20 MVA is apparent power. The 1.50 ratio depends on a 0.9 power factor. At 0.85 it is 1.42; read naively it is 1.67.
  • The floor metric does not compare across buildings and is used within this record only.
  • The 13,300 constant on PRJ-164 is withdrawn. That record’s underlying figures remain correct; the generalisation does not survive Bengaluru.
  • No rack count, PUE, occupancy or tenant list.
  • No dated commissioning evidence for this facility in the reviewed set.
  • What would close it. A rack count and a per-cabinet kW figure. Bengaluru 3 would then be one of the most measurable buildings in India.

7Sources

Sources: NTT Global Data Centers Bengaluru 3 facility page, NTT DATA global data center locations index, Data Center Dynamics reporting on the Bengaluru portfolio and the 5,800 sq m figure, Datacentermap listing for GDC Bengaluru 3, and NTT’s 2022 investor material which lists Bangalore 3 at 12 MW.