Planned facility · Verified 26 Oct 2026

NTT Bengaluru 4C — Devanahalli, KarnatakaNTT Global Data Centers · Building C, Bengaluru 4 campus, Prestige Tech Cloud, Devanahalli · 22.4 MW planned critical IT load

Record PRJ-175Karnataka — DevanahalliTier B — capacity clear, stage unverified5 public sources checkedAdditive: no — child of PRJ-172
Stage unverifiedCapacity statedCompletes the campusNo paper trail at allChild of a campus aggregate
22.4MW
Planned critical IT load
67.2MW
Campus IT at completion
100MW
Campus facility at completion
3
Buildings
~33.4MW
Facility at 1.49
0MW
Counted here

Bengaluru 4C is the last of three identical 22.4 MW buildings on NTT’s Devanahalli campus. It is the building that takes the site to its announced 67.2 MW of critical IT and 100 MW of facility load. Nothing has been published about it. Not a construction start, not a date, not a floor area, not a cost. The campus announcement covers it in a single clause and Building A’s launch does not mention it. That makes this the thinnest record in the NTT set and one of the thinnest in the registry — and it is the right way to record it. What can be said is useful: the site, the substation and the land are already in place, so 4C is a demand question rather than an infrastructure one. And at 22.4 MW it is the fourth NTT building in India at exactly that size, which means its cost, floor and density can be estimated from its siblings with reasonable confidence.

1At a glance

Operator
NTT Global Data Centers — NTT DATA, with Prestige Group
Facility
Bengaluru 4C, Building C, Prestige Tech Cloud, Devanahalli
Capacity
22.4 MW planned critical IT load — campus design
Data halls
Seven of 3.2 MW, per the campus design
Completes
67.2 MW critical IT / 100 MW facility at Devanahalli
Stage
Planned, unverified — nothing published
Siblings
Building A live June 2026; Building B also unverified
Parent
PRJ-172, the 67.2 MW Bengaluru 4 campus
Counted
Non-additive. 0 MW counted at building level

2The last third

Three buildings, one year of announcements covering all of them and one launch covering one. The delivery ladder for the campus is short and mostly empty.

Site bought01Substation02Building A03Building B04Building C05Navy = verified · Red = current stage · Grey = not yet evidenced
Figure 1Delivery stage of the Bengaluru 4 campus. Navy is verified, red is the current stage, grey is not yet evidenced.
The campus, as delivered and as planned
LevelCritical ITFacility at 1.49Share
Live today22.4 MWabout 33.4 MW33%
With Building B44.8 MWabout 66.8 MW67%
With Building C67.2 MW100 MW100%

Note that the facility figure at completion is exactly the 100 MW NTT publishes for the campus, which is the fourth time in this registry that a multi-building NTT campus closes on its own components. NAV1 closes to within 2%, Noida 2 closes to zero, Chennai 2 closes to zero, and this one closes to zero.

That is either a very disciplined planning process or a very disciplined public relations process. Either way, it is checkable, and it is rare enough in this market to be worth the page.

3What completion looks like

If all three buildings arrive, Devanahalli is one of the larger single-operator campuses in India. That is worth pricing against the rest of the file.

Bengaluru 4 against NTT's other campuses
CampusCritical IT at build-outFacility loadLand
Chandivali, Mumbai136.1 MW counted today250 MW planmultiple buildings
NAV2, Airoli336 MW500 MW54 acres
NAV1, Mahapeabout 100 MW150 MW8 acres
Bengaluru 467.2 MW100 MW8.5 acres
Chennai 2, Ambattur34.8 MWabout 52 MW6 acres
Noida 252.8 MWabout 79 MW6 acres

At completion Bengaluru 4 would be the third-largest NTT campus in India behind Airoli and Chandivali, and the largest outside the Mumbai region. Its ₹35.7 crore per megawatt capital cost, published on the parent record, makes it the cheapest large campus in the file to build.

The practical consequence for a buyer is that this is where NTT’s Indian price competition will come from. Capacity built at ₹35.7 crore per megawatt can be leased at rates that a campus built at ₹80 crore cannot match, and Kolkata is at ₹80.

That gap — 2.2 times between the cheapest and the most expensive NTT megawatt in India — is the single most useful thing this registry has produced on pricing, and neither end of it is published anywhere as a comparison.

4Procurement

Procurement window and scope
Gridvik assessment · 22 Oct 2026
What to buy here
Nothing yet. The last third of a campus that is one third live
Where the capacity is
Prestige Tech Cloud, Devanahalli — the Bengaluru airport corridor
Who holds the answer
NTT Global Data Centers India commercial team
The one question
Is there a 4C start date, and does the 220 kV substation have headroom for a fourth building
Why they will answer it
The campus is two thirds undelivered and the substation was sized for 100 MW
Gridvik estimate
About 33.4 MW of facility load and seven halls of 3.2 MW, identical to Building A. Labelled estimates on an unverified stage
What changes it
A construction start, or a published campus delivery schedule
All estimates are labelled as estimates. No tender dates claimed, no private contact data published.
Unlock GridFeed →

5Limits and open questions

  • Stage is unverified. No source in the reviewed set publishes anything about Building C beyond its place in the campus total.
  • 22.4 MW counts zero here and cannot be added to Buildings A or B.
  • The seven-hall structure is a campus design figure, not a Building C specification.
  • No cost, floor area, rack count or PUE is allocated to this building.
  • The ₹35.7 crore per megawatt figure is a campus-level cost and cannot be attributed to any single building.
  • The 220 kV substation headroom for a fourth building is not published. A campus described as three buildings may or may not be expandable.
  • This is a five-section page on purpose. It is the thinnest record in the NTT set and padding it would be invention.

6Sources

Sources: NTT Global Data Centers Bengaluru 4 campus page stating 67.2 MW across three buildings, NTT DATA announcement of 13 June 2026, press release material distributed in December 2025 describing three buildings of seven 3.2 MW halls each, and Data Center Dynamics reporting on the campus.