Facility record · Verified 26 Oct 2026

AirTrunk BOM3 — Chandivali, MumbaiAirTrunk, via Lumina CloudInfra · Chandivali, Mumbai · 48 MW facility capacity · 1.5 ha · 33 kV feed · design PUE below 1.4

Record PRJ-182Maharashtra — MumbaiTier B — specified, stage unverified6 public sources checkedAdditive: yes — 48 MW counted
Design PUE declaredOnly 33 kV feed12.9 MW per acre, the file's densestStage unverifiedLand at ₹9.9 crore per MW
48MW
Facility capacity, at least
12.9
MW per acre
1.5ha
Site
33kV
Power feed
₹475cr
Reported land price
₹9.9cr
Land per MW

AirTrunk BOM3 in Chandivali is 48 MW of facility capacity on 1.5 hectares — under four acres — with 75,000 to 90,000 square metres of technical data hall area, a declared design PUE below 1.4, and a 33 kV power feed. That last detail makes it the odd site out. Every other AirTrunk India site publishes a high-voltage connection: 220 kV at BOM1 and BOM2, 230 kV at Chennai, 440/220 kV in Hyderabad. Chandivali runs on 33 kV, an order of magnitude smaller. At 12.9 MW per acre it is the densest announced single facility in this registry by a wide margin, and the land tells you why: Lumina reportedly paid ₹475 crore for the Chandivali parcel, which is ₹9.9 crore per megawatt of the 48 MW before a single cabinet is installed. In an urban infill market the only way to make the arithmetic work is to stack the capacity. This page is about what that costs.

1At a glance

Operator
AirTrunk — via Lumina CloudInfra
Facility
BOM3, Chandivali, Mumbai
Capacity
48 MW facility capacity, at least
Site
1.5 ha / 3.71 acres
Technical area
75,000 to 90,000 m² of data hall, plus 7,000 to 9,000 m² office and storage
Power feed
33 kV — the only AirTrunk India site without a high-voltage substation
Efficiency
Declared design PUE below 1.4
Land efficiency
12.9 MW per acre — the highest in this registry
Reported land price
₹475 crore for a four-acre parcel, per coverage at acquisition
Stage
Unverified
Counted
Additive. 48 MW counted, with the stage flagged

212.9 MW per acre, the densest announced single facility in the file

Chandivali is where the Indian market’s land constraint shows up as an engineering choice rather than a commentary.

BOM3, Chandivali48 MW on 3.71 acres12.9 MWBOM1, Navi Mumbai62 MW on 5.94 acres10.4 MWBOM2, Mahape120 MW on 13.3 acres9.0 MWNoida 252.8 MW on 6 acres8.8 MWBengaluru 467.2 MW on 8.5 acres7.9 MWKolkata 125 MW on 7.5 acres3.3 MWThe land-efficiency ratio. Chandivali is the densest announced single facility in the registry, and the reason is that there is nowhere to expand.
Figure 1Facility megawatts per acre. Three AirTrunk sites at the top of the table, two NTT sites in the middle, and the Kolkata campus at the bottom.
Chandivali from its own numbers
MeasureValueBasis
Facility capacity48 MWoperator card, at least
Site area1.5 ha / 3.71 acresoperator card
MW per acre12.948 divided by 3.71
Technical data hall area75,000 to 90,000 m²operator card
Office and storage7,000 to 9,000 m²operator card
Data hall per MWabout 17,000 to 20,000 sq ftderived, and heavily caveated below
Power feed33 kVoperator card

Twelve point nine megawatts an acre means the building has to go up rather than out. On a 15,000 square metre plot, 75,000 to 90,000 square metres of technical area implies five to six storeys of data hall, stacked over a substation-free ground floor fed at 33 kV.

That is a different construction problem from a shed on 54 acres. It is also the only way to put capacity in Chandivali, which is why NTT has built five buildings there and why Equinix, Yotta and Lumina have all bought into the same few square kilometres.

A correction to record 180

Record PRJ-180 described BOM1 at 10.4 MW per acre as the most land-efficient site in the file, on the basis of the sites charted there.

BOM3 at 12.9 MW per acre is higher. The BOM1 text has been amended to say it is the densest of the AirTrunk Mumbai sites, which is what its own evidence supports.

The registry corrects itself on the page where the new evidence arrives.

3₹118 crore an acre

The land price for this parcel is the most expensive figure per unit of anything in the registry, and it explains the vertical build.

The land arithmetic
MeasureValueBasis
Reported land price₹475 crorecoverage of Blackstone-backed Lumina’s Chandivali parcel
Parcelabout four acresreported at acquisition
Per acre₹118.75 crore475 divided by 4
Facility capacity48 MWoperator card
Land cost per MW₹9.9 crore475 divided by 48
Total build cost per MW, market rateabout ₹53 croreAirTrunk programme and ICRA both land here
Land as a share of capexabout 19%9.9 of 53

Nineteen per cent of the capital cost of a data centre being land is extraordinary. In Devanahalli, where NTT builds at ₹35.7 crore per megawatt, land is a rounding error. In Chandivali it is a fifth of the bill.

That single ratio explains almost every other number on this page. It is why the site is 1.5 hectares and not 5.4. It is why the data hall is stacked five or six storeys. And it is why the power comes in at 33 kV: an urban parcel of this size may simply not have an accessible high-voltage connection, so the operator takes what the local distribution network offers and builds around it.

Whether the ₹475 crore parcel is the same one as BOM3 is not established — Lumina bought several Mumbai parcels. The registry records the reported figure alongside the operator card without asserting they are the same transaction.

448 MW on a 33 kV feed

The voltage is the most technically surprising number in this whole pipeline, and it is worth being precise about why.

Voltage across the AirTrunk India sites
SiteConnectionCapacityWhat it implies
HYD1, Chandanvelly440/220 kV243 MWcampus-scale, own substation
MAA1, Ambattur230 kV128 MWcampus-scale, own substation
BOM2, Mahape220 kV120 MWcampus-scale, own substation
BOM1, Navi Mumbai220 kV62 MWcampus-scale, own substation
BOM3, Chandivali33 kV48 MWdistribution-level supply, no substation

Forty-eight megawatts at 33 kV is roughly 840 amps. That is deliverable, and Indian industrial consumers do take supplies at this level, but it is at the top of what a distribution feed handles and it comes with less redundancy than a dedicated high-voltage connection.

For a tenant the practical consequence is about resilience rather than capacity. A 220 kV substation on site is a different class of supply from a 33 kV feeder shared with the surrounding industrial estate.

The registry records the voltage as published and draws no conclusion about reliability — that would require outage data nobody publishes.

One further caveat on the technical area. The operator card gives 75,000 to 90,000 square metres, a 20% range, which is an unusual way to publish a building size. It may reflect multiple buildings with different fits, or a template. Either way it cannot be turned into a reliable per-megawatt floor figure and is not used as one here.

5The Chandivali stack

Chandivali and Andheri East hold more data centre capacity per square kilometre than anywhere else in India, and BOM3 is a 48 MW addition to it.

Who is in Chandivali
Operator and siteCapacityNote
NTT Mumbai 962 MW facility6,000 racks, live
NTT Mumbai 836 MW facility2,800 racks
NTT Mumbai 725.6 MW IT in 38 MWdesign PUE equivalent 1.48
NTT Mumbai 6, Andheri East19.2 MW ITin the same submarket
NTT Mumbai 512.5 MW ITIndia’s first hyperscale campus building
AirTrunk BOM348 MWunverified stage, 33 kV
Equinix MB3about 1,370 cabinetslaunched April 2026, five acres
Yotta Chandivalitwo-building parkin development

NTT counts 136.1 MW in Chandivali alone, which is 85% of its Indian Mumbai total. Add AirTrunk’s 48 MW and the submarket carries nearly 185 MW of published capacity inside a handful of square kilometres off Saki Vihar Road.

The commercial consequence is that Chandivali is a connectivity market rather than a capacity market. Tenants buy there for the ecosystem — carriers, cloud on-ramps, financial services, the density of other tenants — and pay a land premium of about ₹118 crore an acre for the privilege.

Which is also why BOM3’s 33 kV feed is less of a problem than it looks. If a tenant is buying Chandivali, they are buying the interconnect fabric, not a dedicated substation.

6Procurement

Procurement window and scope
Gridvik assessment · 22 Oct 2026
What to buy here
Dense urban capacity in Mumbai’s most connected submarket, with a declared sub-1.4 design PUE
Where the capacity is
Chandivali, off Saki Vihar Road — the same estate as NTT’s five Mumbai buildings and Equinix MB3
Who holds the answer
AirTrunk India commercial team
The one question
Is the site energised on the 33 kV feed, and what redundancy that feed actually provides
Why they will answer it
It is the smallest and most unusual site in their Indian portfolio, and resilience is the first question any tenant asks
Gridvik estimate
About 48 MW in a five to six storey building, likely in development rather than live. Labelled an estimate
What changes it
A commissioning statement, or a published redundancy specification for the 33 kV supply
All estimates are labelled as estimates. No tender dates claimed, no private contact data published.
Unlock GridFeed →

7Limits and open questions

  • Stage is unverified. No operating or construction status is stated on the operator card.
  • 48 MW is facility capacity, at least — a floor, not IT load.
  • The ₹475 crore parcel is attributed to Lumina in coverage and is not confirmed as the BOM3 site. The ₹9.9 crore per megawatt land figure rests on that link.
  • The 75,000 to 90,000 sq m technical area is a 20% range and cannot produce a reliable per-megawatt floor figure.
  • The storey count of five to six is inferred from area over plot size and is not published.
  • Design PUE below 1.4 is a specification, not an operating measurement, and the source of that efficiency on a 33 kV feed is not explained.
  • No rack count, tenant list or occupancy.
  • What would close it. A stage statement and a redundancy specification. Both are one line on a location card.

8Sources

Sources: AirTrunk location page for BOM3, AirTrunk’s announcement of the Lumina CloudInfra acquisition of April 2026, Baxtel and Datacentermap Chandivali listings covering the Lumina four-acre parcel and the surrounding operators, Data Center Dynamics coverage of the acquisition, and the registry’s own NTT Chandivali records PRJ-150 to PRJ-154 for the submarket comparison.