Facility record · Verified 26 Oct 2026

Iron Mountain MUM-1 — Navi MumbaiIron Mountain Data Centers · Navi Mumbai, Maharashtra · 2.5 MW IT, scalable to 4 MW · 50,000 sq ft · Operating since 2015 · Counted as 0 MW

Record PRJ-188Maharashtra — Navi MumbaiTier A — operator-published, specific4 public sources checkedAdditive: yes — but no capacity value in source
Operating since 2015Operator publishes the MWCounts as 0 in the fileSits next to an 85 MW buildOnly 2.5 MW, live since 2015
2.5MW
IT capacity
4MW
Scalable to
50,000sq ft
Floor area
20,000sq ft
Per megawatt
0MW
Counted in the registry
2015
In service since

MUM-1 is the oldest building on Iron Mountain’s Navi Mumbai campus: 50,000 square feet — 4,645 square metres — Tier III designed, in service since 2015, described by the operator as one of India’s busiest data centres. It publishes 2.5 MW of IT capacity, scalable to 4 MW. In this registry it is flagged additive and contributes nothing, because the source field was left blank when the capacity was not on the page the record was built from. That single blank is a fifth of the company’s energised Indian capacity, and the page exists to show what a missing field costs.

1At a glance

Facility
MUM-1, Navi Mumbai, Maharashtra
Operator
Iron Mountain Data Centers India, formerly Web Werks
In service
2015 — the oldest building on the campus
IT capacity
2.5 MW, published by the operator
Scalable to
4 MW
Floor area
50,000 sq ft / 4,645 sq m
Density
20,000 sq ft per MW; about 50 W per sq ft
Design standard
Uptime Institute Tier III-designed
Campus
5.5 acres shared with MUM-2 and the unbuilt MUM-3
Share of Iron Mountain India’s energised estate
12.3% of 20.3 MW
Counted in this registry
0 MW — additive flag yes, capacity field blank
Who gets this wrong
Any client summing the additive column

22.5 megawatts the file counts as zero

This is a small building with a large lesson attached to it, so the lesson goes first.

What the record versus the operator says
FieldIn this registryOn the operator pageConsequence
Capacityblank2.5 MWContributes nothing to any total
Additive flagYES—The record is supposed to add
Floor area50,000 sq ft50,000 sq ftReconciles exactly
Scale ceilingnot recorded4 MWA 1.5 MW upside is invisible
Design standardTier IIITier III-designedReconciles
In-service datenot recorded2015Age is not visible
A yes flag with an empty value is worse than a no

An additive flag of NO tells a reader the row is a rollup and should not be summed. An additive flag of YES with a blank capacity tells a reader the row should be summed and silently isn’t.

Both produce the same arithmetic. Only one of them produces a wrong number that nobody notices.

Three records in the Iron Mountain family carry this combination — MUM-1, MUM-2 and NCR-1 — and between them they hide 8.8 MW of published capacity. That is the whole reason the platform’s 11.5 MW counted figure is 57% of its 20.3 MW published figure.

What 2.5 MW is worth in context
ComparisonMWMUM-1 relative to it
MUM-3, the building next door85MUM-1 is 2.9% of it
NTT Mumbai 9, the largest operating building in the registry62MUM-1 is 4.0% of it
AirTrunk HYD1, the largest single site in the file243MUM-1 is 1.0% of it
Nxtra Chennai 1, comparable vintage and role2Roughly the same size
The whole 2,420.4 MW registry2,420.4MUM-1 is 0.10% of it

Two and a half megawatts is a real building with real customers, and it is also a rounding error in a market where a single new building is 85 MW. Both things are true. The registry’s job is to keep 2.5 MW visible rather than let it fall out of a total because of a blank cell.

3Fifty thousand square feet, fifty watts a foot

MUM-1 is the least dense per square foot of the buildings where this registry can compute density, and the comparison is instructive because it dates the design era.

Power density per square foot across the portfolio
BuildingMWFloor areaWatts per sq ft
MUM-2, 20236.3110,631 sq ft56.9
MUM-1, 20152.550,000 sq ft50.0
BLR-1, Bengaluru4.080,000 sq ft50.0
HYD-1, Hyderabad phase one5.5120,000 sq ft45.8
PUN-1, Hinjewadi2.050,186 sq ft39.9
MUM-3, at full build851,398,000 sq ft60.8
Portfolio weighted average20.3480,552 sq ft42.2

Fifty watts per square foot is normal for a 2015 carrier-neutral building with a traditional raised floor. MUM-3 at 60.8 W per sq ft is not a dramatic increase — and that matters, because it means the megawatts at MUM-3 come mostly from floor area, not from rack density. 1.4 million square feet is what buys 85 MW; the racks inside are only about 22% denser than MUM-1’s.

Why that distinction has money in it

A building that scales by area needs land, structure and steel. A building that scales by rack density needs power and cooling. They are different supply chains, different risks and different lead times.

MUM-3 is the first kind at campus scale. AirTrunk’s Chandivali at 12.9 MW per acre is the second. Anyone quoting a single per-megawatt construction cost across both is quoting an average of two unrelated things.

4Procurement

Procurement window and scope
Gridvik assessment · 22 Oct 2026
What to buy here
The operating base of the campus — the cheapest way to buy live Mumbai colocation capacity from a US-listed REIT
Where the capacity is
Navi Mumbai, Maharashtra. 2.5 MW IT, scalable to 4 MW, 50,000 sq ft
Who holds the answer
Iron Mountain Data Centers India — the sales team sells against the 93 MW campus headline
The one question
What is actually available today, in kW, and at what rack density
Why they will answer it
Sales teams answer availability questions directly; they do not answer capacity questions
Gridvik estimate
No expansion beyond 4 MW on this footprint; the growth is MUM-3. Labelled an estimate
What changes it
A published expansion plan for MUM-1, or MUM-3 phase-one availability
All estimates are labelled as estimates. No tender dates claimed, no private contact data published.
Unlock GridFeed →

5Limits and open questions

  • 2.5 MW is IT capacity as published by the operator. Facility load is not stated; at a typical ratio it would be about 3.5 MW.
  • The 4 MW figure is scalability, not commissioned load, and is excluded from every total on this page.
  • The floor area is a whole-building figure, not technical hall, so 50 W per sq ft understates density inside the halls.
  • The in-service date of 2015 comes from the operator page and is not corroborated by an independent announcement.
  • The count is zero. This page does not change the registry total; it explains why the total is low.
  • What would close it. A capacity value in the source field, and an additive rule that treats a blank as a defect rather than a valid state.

6Sources

Sources: the Iron Mountain MUM-1 location page; the Iron Mountain Mumbai campus page; the Iron Mountain Data Centers India platform page; and the Web Werks MUM-1 facility page.