Iron Mountain MUM-2 — Navi MumbaiIron Mountain Data Centers · Navi Mumbai, Maharashtra · 6.3 MW IT · 110,631 sq ft · Opened February 2023 · 9 carriers, 4 internet exchanges · Counted as 0 MW

Record PRJ-189Maharashtra — Navi MumbaiTier A — operator-published, specific5 public sources checkedAdditive: yes — but no capacity value in source
Densest building in the portfolioNine carriers, four exchangesCounts as 0 in the fileArea understated by 10,631 sq ftN+2 chilled water, N+1 generators
6.3MW
IT capacity
110,631sq ft
Floor area
17,560sq ft
Per megawatt
56.9
Watts per sq ft
9
Carriers on site
0MW
Counted in the registry

MUM-2 opened in February 2023 next door to MUM-1 on the Navi Mumbai campus, with 6.3 MW of IT capacity over 110,631 square feet — 17,560 sq ft per megawatt, about 57 watts per square foot. That makes it the densest building in Iron Mountain’s Indian portfolio and the newest thing the company operates in Mumbai. It is also the interconnection site of the campus: nine carriers, more than 200 ISPs and four internet exchanges — DE-CIX, AMS-IX, Extreme IX and NIXI. And like MUM-1 it counts as zero megawatts in this registry, because the capacity field was left blank.

1At a glance

Facility
MUM-2, Navi Mumbai, Maharashtra
Operator
Iron Mountain Data Centers India, formerly Web Werks
Opened
February 2023
IT capacity
6.3 MW with phased deployment
Floor area
110,631 sq ft / 10,278 sq m
Density
17,560 sq ft per MW; 56.9 W per sq ft — highest in the portfolio
Cooling
Chilled water in N+2 configuration
Generators
N+1 diesel sets
Connectivity
9 carriers, more than 200 ISPs, 4 internet exchanges
Density suitability
Designed for high-density AI workloads per the operator
Counted in this registry
0 MW — additive flag yes, capacity field blank
File error
Area recorded as 100,000 sq ft; operator publishes 110,631

2The densest building in the portfolio

MUM-2 is where the campus’s engineering actually lives, and the density numbers show it.

Where MUM-2 sits in the Iron Mountain India portfolio
BuildingMWSq ft per MWWatts per sq ft
MUM-26.317,56056.9 — highest
MUM-12.520,00050.0
BLR-14.020,00050.0
HYD-15.521,81845.8
PUN-12.025,09339.9
NCR-1not disclosed——
MUM-3, at full build8516,44760.8

MUM-2 carries 2.5 times MUM-1’s output on 2.2 times its floor area. That is the only genuine density gain in the operating estate, and it was delivered by a building next door on the same five and a half acres.

The economics of the middle

A 6.3 MW building at 57 watts per square foot is a colocation business. An 85 MW building at 61 watts per square foot is a leasing business. The watt density is nearly identical; the customer, the contract length and the capital structure are not.

That is why the campus can credibly hold both. MUM-1 and MUM-2 sell cabinets and cages. MUM-3 sells wholesale suites to hyperscalers for twenty years at a time.

3Nine carriers, 200 ISPs, four exchanges

Interconnection is the part of a data centre that cannot be rebuilt quickly and is the real reason tenants stay. MUM-2 is the campus’s network anchor.

The interconnection position
ElementDetailWhy it matters
Carriers on site9Physical diversity into the building
Internet service providersmore than 200The demand side of the exchange
Internet exchangesDE-CIX, AMS-IX, Extreme IX, NIXIFour separate peering fabrics in one facility
Cloud on-netAll major cloud providers, per the operatorDirect connect without leaving the building
Deployment optionsCabinets, dedicated cages, custom build on raised floorSells to enterprises, not just hyperscalers
Uptime designConcurrently maintainable Tier IIIThe standard enterprise procurement gate

Four internet exchanges inside a single 110,000 sq ft building in Navi Mumbai is the strongest interconnection claim this registry has recorded for a sub-10 MW facility. It is also the least replicable asset Iron Mountain owns in India: an 85 MW shell can be built in two years, and a peering ecosystem cannot.

What this is worth to a buyer

Capacity is a commodity priced per kilowatt. Interconnection is not: the same megawatt in a building with four exchanges and 200 ISPs is worth more than the same megawatt in a shell on the fringe of the city, and it is worth more every year as the ecosystem deepens.

This is the argument for valuing Indian data centres on interconnection density rather than megawatts. The registry records both, which is why the MUM-2 record carries the exchange names and not just the number.

4The floor area the file gets wrong

The source file records MUM-2 at 100,000 sq ft / 9,300 sq m. The operator now publishes 110,631 sq ft / 10,278 sq m. The difference is 10,631 square feet, 10.6%.

What the 10.6% does to the derived metrics
MetricAt 100,000 sq ftAt 110,631 sq ftEffect
Sq ft per MW15,87317,560Density looks 10.6% better than it is
Watts per sq ft63.056.9Power density understated by 6.1 W
Share of the 480,552 sq ft estate20.8%23.0%A fifth becomes nearly a quarter
Campus area reconciliation480,552 vs 484,000 — 0.12% apartOnly reconciles with 110,631The corrected figure is the one that fits

The correction is not cosmetic. With MUM-2 at 110,631 sq ft, the six operating facilities sum to 480,552 sq ft, which is within 0.12% of the platform’s stated 484,000 sq ft / 44,700 sq m. With MUM-2 at 100,000 sq ft the sum is 469,921 sq ft and the platform figure no longer reconciles.

That is how a source error gets caught: not by checking one number, but by checking whether the parts add to the whole the same company published independently.

5Procurement

Procurement window and scope
Gridvik assessment · 22 Oct 2026
What to buy here
The interconnection anchor of the campus — the building where a Mumbai presence actually needs to sit
Where the capacity is
Navi Mumbai, Maharashtra. 6.3 MW IT, 110,631 sq ft, phased deployment
Who holds the answer
Iron Mountain Data Centers India, sales team at the campus
The one question
How much of the 6.3 MW is contracted, and what is the maximum rack density sold
Why they will answer it
Colocation sales teams publish availability to fill cabinets
Gridvik estimate
Effective density limits, not capacity, will bind on this building. Labelled an estimate
What changes it
A published availability table, or a tenant announcement naming the building
All estimates are labelled as estimates. No tender dates claimed, no private contact data published.
Unlock GridFeed →

6Limits and open questions

  • 6.3 MW is IT capacity with phased deployment. One operator FAQ says 6 MW; the location page says 6.3 MW. Both are live.
  • The operator states 8.3 MW for MUM-1 and MUM-2 combined, which does not equal 2.5 plus 6.3. The 8.3 figure is older and is used in the campus 93 MW total.
  • The 110,631 sq ft figure is a whole-building measurement, so 56.9 W per sq ft understates the density in the halls.
  • Carrier and ISP counts are operator statements and are not independently verified by this registry.
  • Four internet exchanges in one building is unusually high for a sub-10 MW facility and is the operator’s own claim.
  • The count is zero. This page explains a gap in the registry rather than changing the total.
  • What would close it. A capacity value in the source field; the operator has published one since 2023.

7Sources

Sources: the Iron Mountain MUM-2 location page; the Iron Mountain Mumbai campus page; the Iron Mountain Data Centers India platform page; the February 2023 opening coverage; and the Web Werks MUM-2 facility page.