Get Free Teaser
Facility record · Verified 26 Oct 2026

Yotta D2 — Greater NoidaYotta Data Services (Hiranandani Group) · Greater Noida, Uttar Pradesh · 60 MW IT · 20,736 Blackwell Ultra GPUs · Campus scalable to 250 MW · Additive, 60 MW counted

Record PRJ-210Uttar Pradesh — Greater NoidaTier A — operator-published, operating8 public sources checkedAdditive: yes — 60 MW counted
20,736 liquid-cooled GPUs committed10,000+ GPUs to IndiaAI MissionDGX Cloud anchor tenant named“Live by August 2026” was a targetCampus 250 MW is not counted
60MW
IT load
20,736
GPUs
2.89kW
Per GPU
US$2bn+
Committed
10,000+
GPUs to IndiaAI
250MW
Campus ceiling

D2 is a 60 MW IT-load facility inside Yotta’s Greater Noida campus, and it hosts the largest single AI deployment recorded in this registry: 20,736 liquid-cooled Nvidia Blackwell Ultra GPUs, backed by more than US$2 billion in commitments and connected over 800 Gbps InfiniBand with 40 petabytes of parallel storage. More than 10,000 of those GPUs are committed to the government’s IndiaAI Mission. Nvidia is putting one of Asia-Pacific’s largest DGX Cloud clusters inside the building under a four-year engagement worth about US$1 billion. Sixty megawatts divided by 20,736 GPUs is 2.89 kW of data centre per GPU — and that ratio, not the megawatt, is the number that now defines an AI facility.

1At a glance

Facility
D2, Greater Noida data centre campus, Uttar Pradesh
Operator
Yotta Data Services, Hiranandani Group
IT load
60 MW
GPU deployment
20,736 liquid-cooled Nvidia Blackwell Ultra (HGX B300)
Capacity per GPU
2.89 kW
Networking
800 Gbps Nvidia Quantum-X800 InfiniBand
Storage
40 PB high-performance parallel file system
Committed capital
More than US$2 billion
Anchor engagement
Nvidia DGX Cloud cluster, four years, about US$1 billion
Sovereign allocation
More than 10,000 GPUs to the IndiaAI Mission
Campus
Greater Noida park scalable to 250 MW across up to six buildings
GPU generation
Blackwell Ultra, shipped by Nvidia from January 2026
Timeline
Supercluster targeted live by August 2026
Counted in this registry
60 MW — additive; the 250 MW campus is not

2Two point eight nine kilowatts per GPU

D2, Greater Noida60 MW / 20,736 Blackwell Ultra2.89 kWD4, Greater Noida120 MW / 40,000 Vera Rubin3.00 kWNM2, Navi Mumbai80 MW / 40,000 GB3002.00 kWThree facilities, three chip generations, one band. Roughly three kilowatts of data centre per GPU is the new planning constant.
Figure 1 — Yotta’s three AI facilities measured as data centre capacity per GPU. The ratio is stable across a chip generation change, which makes it a usable planning constant.
The same three facilities, three ways of counting
FacilityStatusMWGPUskW per GPU
D2, Greater NoidaLive6020,7362.89
D4, Greater NoidaFrom 202712040,0003.00
NM2, Navi MumbaiFit-out8040,0002.00
Programme—260100,7362.58

Every capacity figure in this registry before this record was a megawatt. Yotta has introduced a second unit, and it is more useful for AI: how much data centre a GPU needs.

The band is 2.0 to 3.0 kW per GPU across a Blackwell Ultra to Vera Rubin generation change. That is not a coincidence — an NVL72 rack draws roughly 140 kW on Blackwell Ultra and 120 to 130 kW on Vera Rubin for the same 72 GPUs, so the per-GPU figure is set by rack architecture rather than by chip efficiency.

Why this is the number to sell into an AI build

A developer planning an AI data centre in India now has a defensible rule: 40,000 GPUs needs about 100 to 120 MW. That is what Yotta has published three times, on three facilities, without ever stating the ratio.

Compare a conventional colocation build, which sells racks. A 7 MW hall at 15 kW per rack is 467 racks. An AI hall at 140 kW per rack is 50 racks for the same power — nine times fewer cabinets, nine times the cooling per cabinet, and a completely different landlord business.

Any Indian capacity dataset that counts megawatts and stops there cannot tell those two buildings apart. This registry now records both.

3The IndiaAI Mission share

Where the 20,736 GPUs sit
AllocationGPUsShare
Total Blackwell Ultra deployment20,736100%
Committed to the IndiaAI Missionmore than 10,00048% or more
Available commercially and for DGX Cloudup to 10,736up to 52%
Nvidia DGX Cloud clusterPart of the remainderFour-year engagement, about US$1 billion

Nearly half of India’s largest AI cluster is committed to a government mission, and that single sentence explains both the political support for the Indian data centre buildout and the commercial risk in it.

The IndiaAI Mission is the sovereign foundation-model and public-AI programme. Allocating over ten thousand liquid-cooled Blackwell Ultra GPUs to it means Yotta is, in effect, the government’s compute supplier as well as a commercial operator.

The trade is straightforward: sovereign volume is contracted, predictable and creditworthy, and it anchors a US$2 billion capital commitment. The cost is that 48% of the flagship cluster is not available to the market — so the commercial GPU supply in India is materially smaller than the headline number implies.

For anyone pricing Indian AI compute: the private market competes for roughly 10,700 GPUs at D2, not 20,736.

4Two billion dollars, and what it buys

What the US$2 billion covers and what it does not
ItemBasisReading
Committed capitalMore than US$2 billionBlackwell Ultra infrastructure deployment
What it includesGPUs, liquid cooling, 800 Gbps networking, 40 PB storageNot just the building
Facility capexnot broken outCannot compute a per-megawatt building cost
DGX Cloud revenueAbout US$1 billion over four yearsA customer contract, not an investment
Implied GPU costUS$2bn ÷ 20,736 = US$96,450 per GPUIf the whole sum were silicon
For comparison, D4US$7.5bn for 50,000 Vera RubinUS$150,000 per GPU
D4 facility constructionUS$750 millionUS$6.25m per MW = ₹55.3 crore

The last row is the one that matters for this registry. A later Yotta disclosure separates the US$750 million of data centre construction from the GPU spend, and US$750 million for 120 MW is US$6.25 million per megawatt — ₹55.3 crore.

That is inside the ₹51.4 to ₹60.1 crore band this registry has established from NTT, AirTrunk, CapitaLand and Colt. A fifth independent organisation, disclosing construction separately, lands in the same place.

Which is the useful conclusion: Indian data centre construction costs about ₹51 to ₹60 crore per megawatt regardless of who builds it. What varies wildly is the silicon on top — from nothing at a colocation hall to ₹150,000 per GPU at an AI factory.

The distinction a buyer must not blur

A US$2 billion AI announcement is mostly chips. A US$2 billion data centre announcement would be 350 MW of buildings. These are not the same product and they are reported in the same headlines.

This registry counts 60 MW at D2. It does not count dollars, GPUs or superclusters, because none of those is a facility.

That discipline is what keeps the national total comparable across an operator building a shell in Devanahalli and an operator installing ten thousand GPUs in Noida.

5Procurement

Procurement window and scope
Gridvik assessment · 22 Oct 2026
What to buy here
The largest contracted AI compute cluster in India, with nearly half already allocated to a government mission
Where the capacity is
Greater Noida, Uttar Pradesh. 60 MW IT, 20,736 GPUs
Who holds the answer
Yotta Data Services; Nvidia holds the DGX Cloud engagement; IndiaAI Mission holds 10,000+ GPUs
The one question
How many of the remaining GPUs are unreserved today, and at what rate per GPU-hour
Why they will answer it
Yotta is pre-IPO and needs to show contracted revenue
Gridvik estimate
The commercial remainder is largely committed given the DGX Cloud anchor. Labelled an estimate
What changes it
A published GPU availability or rate card, or an IPO prospectus disclosure
All estimates are labelled as estimates. No tender dates claimed, no private contact data published.
Unlock GridFeed →

6Limits and open questions

  • 60 MW is IT load as stated, and is what the registry counts. The 250 MW campus ceiling is not counted.
  • US$2 billion is a deployment commitment including GPUs, cooling and networking — not facility capex, and not a valuation.
  • “Live by August 2026” was a target stated in February 2026. No commissioning confirmation has been located.
  • The facility’s own building cost is not disclosed, so no per-megawatt figure exists for D2 itself.
  • “More than 10,000” GPUs to the IndiaAI Mission is not a precise number and the allocation mechanism is not published.
  • 2.89 kW per GPU is a Gridvik division of published figures, not an operator statement.
  • The DGX Cloud contract value is described as “over US$1 billion multi-year”, not a firm booked figure.
  • What would close it. A commissioning date and the number of GPUs actually reserved by commercial customers.

7Sources

Sources: the Yotta Blackwell Ultra release of 18 February 2026; Hiranandani Group coverage of the same announcement; Data Center Dynamics on the US$2 billion deployment and the IndiaAI allocation; Manufacturing Today; Tech Times on the 80,000-GPU programme; and the Yotta data centre portfolio page.