Facility record · Verified 26 Oct 2026

Sify Kolkata 02 — four point eight megawatts, or twenty-eight percent of a stateSify Technologies · Kolkata, West Bengal · up to 4.8 MW IT · Listed as upcoming · Second Sify site in the state

Record PRJ-232West Bengal — KolkataTier C — announced, unquantified6 public sources checkedAdditive: unknown — 0 MW counted
Listed as upcoming by the operatorNo capacity, date, capital or customer publishedWould add 28% to West Bengal's counted operating capacityKolkata 01 and Kolkata 02 are 26 years and 4.4 times apart
4.8MW
Programme ceiling
0MW
Counted
17.08MW
West Bengal operating
28%
Added at ceiling
1.08MW
Kolkata 01, built 2000
32.5MW
State total, all tiers

West Bengal counts 17.08 MW of operating data centre capacity across 242 records covering the whole country. Two buildings produce it: CtrlS Kolkata DC 1 at 16 MW and Sify Kolkata 01 at 1.08 MW, which opened in September 2000 as India’s first commercial data centre. Sify Kolkata 02, the operator’s second site in the state, is listed as an upcoming AI Edge facility with a programme ceiling of up to 4.8 MW and nothing else published. At that ceiling it would add 28% to the state’s counted operating capacity — a single unbuilt edge site is worth more than a quarter of everything West Bengal can currently evidence. That is not a compliment to Kolkata 02. It is a measure of how little has been built in a state of a hundred million people, and how thin the disclosure is for what is coming.

1At a glance

Facility
Sify Kolkata 02, Kolkata, West Bengal
Operator
Sify Technologies, via Sify Infinit Spaces
Status
Upcoming, per the operator’s own edge page
Capacity published for this site
None
Programme ceiling
Up to 4.8 MW IT
Launch date, capital, customer
None published
Predecessor
Sify Kolkata 01, 1.08 MW, operating since September 2000
West Bengal operating capacity counted
17.08 MW across 2 records
West Bengal total counted, all tiers
32.48 MW across 5 records
West Bengal published but uncounted
About 78 MW in campus and portfolio claims
Counted as a share of published
About 34%
Added to the state operating figure at ceiling
+4.8 MW, or +28.1%
Counted in this registry
0 MW — additive status unknown

2Kolkata's counted 17.08 MW

CtrlS Kolkata DC 1counted operating16.00 MWSTT GDC Kolkata 1 + 2pipeline tier9.00 MWNTT Kolkata 1Apipeline tier6.40 MWSify Kolkata 02ceiling, not built4.80 MWSify Kolkata 01counted operating, built 20001.08 MWThe red bar is a ceiling on a site that has no published capacity, no date and no capital figure.
Figure 1 — West Bengal's capacity as published, tier by tier. Only the navy and dark bars count towards the state's operating total.
West Bengal, record by record
RecordMWTierCounted
CtrlS Kolkata DC 116.00OperatingYes
Sify Kolkata 011.08OperatingYes
STT GDC Kolkata 13.00PipelineCounted, stage unverified
STT GDC Kolkata 26.00PipelineCounted, stage unverified
NTT Kolkata 1A6.40PipelineCounted, planned
Counted, all tiers32.48——
CtrlS Kolkata campus60.00CeilingNo — container
NTT Kolkata 1 campus25.00CeilingNo — container
STT GDC Kolkata portfolio9.00CeilingNo — container
Yotta West Bengal hyperscale park250.00UnknownNo — unverified
Nxtra Kolkata East India DCNot publishedUnknownNo — no capacity

Three buildings out of twelve records are operating. The state has one hyperscale facility that anyone can point at — CtrlS Kolkata DC 1 at 16 MW — and one that is a quarter-century old and runs at 1.08 MW. Everything else is announced.

The 250 MW Yotta park is the largest single number attached to West Bengal and it carries an UNKNOWN additive flag: no site, no schedule, no phase split. It is excluded here, and it would be irresponsible to include it. A quarter of a gigawatt in a state that currently evidences seventeen megawatts is a claim that requires a planning approval before it requires a spreadsheet.

3What 4.8 MW would do to West Bengal

The arithmetic, before and after
MeasureTodayIf Kolkata 02 lands at its ceilingChange
West Bengal operating capacity17.08 MW21.88 MW+28.1%
West Bengal total, all tiers32.48 MW37.28 MW+14.8%
Sify's West Bengal footprint1.08 MW5.88 MW5.4×
Sify's counted national capacity155.09 MW159.89 MW+3.1%
West Bengal share of national operating capacity2.3%2.9%+0.6 points

One unbuilt 4.8 MW edge site is worth 28% of everything West Bengal can currently evidence. That sentence is the reason this record is worth a page at zero megawatts.

It also sets the ceiling on what the edge programme can mean for the state. Sify has said it plans 10 to 12 edge sites nationally. If one of them is in Kolkata at 4.8 MW, West Bengal’s data centre capacity grows by a quarter — and the state still would not be in India’s top five. The edge programme is real infrastructure and it is not a regional development policy.

The one number to quote from this page

West Bengal: 17.08 MW operating, 32.48 MW counted across all stages, about 95 MW published.

Kolkata 01 has been running since September 2000 — India’s first commercial data centre — and it is 1.08 MW, roughly what a single modern AI rack draws in three hours at 130 kW and a full year at that rate.

The comparison is not a criticism of a 2000-vintage facility. It is the clearest illustration in this registry that India’s data centre capacity is concentrated in four cities and that everywhere else, twenty-six years later, is still waiting for its second building.

4From Kolkata 01 to Kolkata 02: 26 years, 4.4 times

  • Sify Kolkata 01 opens. India’s first commercial data centre. Carrier-neutral, 1.08 MW, and still operating.
  • No second Sify site in the state. CtrlS and NTT build in Bengal Silicon Valley and New Town instead.
  • Sify lists Kolkata 02 as an upcoming AI Edge data centre. No capacity, date or capital published.
  • Sify reports two edge sites under construction nationally, and an edge plan of 10 to 12 sites. It does not name them.
  • A 4.8 MW ceiling, 4.4 times the capacity of the building that preceded it by twenty-six years.

The generational comparison is the point. A site built in 2000 at 1.08 MW and a site planned for 2026 at up to 4.8 MW is not a story about Sify. It is a story about how slowly Indian data centre capacity has reached anywhere outside Mumbai, Chennai, Bengaluru, Hyderabad and Noida.

India’s declared national capacity is 2,236 MW announced against 778.69 MW operating. West Bengal’s ratio is worse than the national one: 15.4 MW announced against 17.08 MW operating, and the announced figure includes a 250 MW park with no site.

5The state's other 78 MW

West Bengal is the clearest case in the registry of a state that publishes a plausible number and evidences almost none of it. Roughly 78 MW is published across three campus and portfolio claims — CtrlS at 60, NTT at 25, STT GDC at 9 — and 25 MW of it reaches the counted total, all of it in the pipeline tier for want of a stage confirmation.

Where West Bengal's published capacity sits
ClaimMWWhat happens to it
CtrlS Kolkata, four-phase campus60.0Campus is a ceiling; only DC 1 at 16 MW has a building record, and that is counted operating
NTT Kolkata 1 campus25.0Campus is a ceiling; only 1A at 6.4 MW has a building record
STT GDC Kolkata portfolio9.0Portfolio is a ceiling; buildings of 3 and 6 MW count as pipeline
Yotta West Bengal hyperscale park250.0UNKNOWN; excluded pending evidence
Sify Kolkata 011.08Operating, counted
Sify Kolkata 02≤4.8Upcoming, no published capacity, excluded

The lesson is mechanical. A state is not poorly covered because nobody published; it is poorly covered because the published figures are aggregates and the buildings underneath them have no records. This registry holds the campus and counts the building. West Bengal’s campus claims are large and its building records are three.

6Why West Bengal counted almost nothing until now

Before the reconciliation of 26 October 2026, West Bengal’s counted capacity was 1.08 MW — Sify Kolkata 01, and nothing else. Every other record in the state was flagged non-additive, including the 16 MW building that is the state’s only hyperscale facility.

The state before and after reconciliation
MeasureBeforeAfterChange
Operating capacity counted1.08 MW17.08 MW+16.00 MW
Total counted, all tiers1.08 MW32.48 MW+31.40 MW
Records counted15+4
Counted as a share of published1.1%About 34%+33 points

The change is not a revision of anybody’s facts. CtrlS Kolkata DC 1 has been 16 MW in this registry’s own master file since the file was created. It simply never entered a total, because the campus row and the building row were both marked non-additive — the double-counting guard applied to a building that had no counted sibling.

That defect ran across 45 container records and 1,186 MW of recovered capacity nationally. West Bengal was its worst case: a state with a hundred million people and one megawatt to show for it.

7What would change this record

The four facts that would move Kolkata 02 from 0 MW
Fact neededEffectWhere it would come from
A stated capacityUp to 4.8 MW moves from excluded to countedOperator announcement or a West Bengal single-window clearance
A site, substation or land parcelConfirms the facility is physicalWest Bengal Industrial Development Corporation land allocation
A launch dateMoves the record from announced to buildingOperator statement or ground-breaking coverage
A named customerConverts a plan into revenueJoint announcement or colocation disclosure

The record stays at zero until two of those exist. The registry does not credit a site with its product ceiling, and it should not: if it did, twelve announced Sify edge sites would add 57.6 MW to a national total on the strength of a marketing sentence.

8Sources

Sources: Sify Technologies AI Edge data centre page, listing Kolkata 02 as upcoming with the 4.8 MW IT capacity ceiling; Sify Technologies data centre index; Sify neocloud infrastructure page; the Sify integrated report for 2025; a technology trade publication report of July 2026 on the earnings call, the two delivered edges and the 10 to 12 site plan; Gridvik record PRJ-228 for Sify Kolkata 01, including its September 2000 opening and 1.08 MW capacity; Gridvik record PRJ-089 and PRJ-090 for the CtrlS Kolkata campus and DC 1; Gridvik records PRJ-133 to PRJ-135 and PRJ-176 to PRJ-177 for the STT GDC and NTT Kolkata portfolios. No capacity, capital or customer figure has been published for Sify Kolkata 02. Record verified 26 October 2026.