Network infrastructure · Verified 26 Oct 2026

Tata Communications — 98 Tbps, and why it is not capacityTata Communications · India-Singapore corridor · US$152 million · 98 Tbps added · MIST and Project CS networks · Zero megawatts counted

Record PRJ-236National — India-SingaporeTier C — adjacent infrastructure4 public sources checkedAdditive: not applicable — 0 MW counted
Correctly excluded: throughput is not powerDirectly relevant to where Indian AI capacity can be soldNo capacity figure and no cable landing data disclosedA common error to add network announcements to capacity totals
98Tbps
Capacity added
US$152m
Committed
2
Networks: MIST, Project CS
2
Indian landing hubs: Mumbai, Chennai
₹1,344cr
INR equivalent
0MW
Counted

In July 2026 Tata Communications committed US$152 million to add 98 Tbps of subsea capacity between India and Singapore, across the MIST and Project CS networks, explicitly to link its Mumbai and Chennai AI hubs with Singapore. Ninety-eight terabits per second is throughput. A megawatt is power. One describes how fast data moves between two buildings; the other describes how much electricity is consumed inside one of them. No conversion exists between them, and any report that adds subsea capacity to data centre capacity is wrong. This record carries zero megawatts, and the reason it still belongs in a 242-record registry is that the cable, not the concrete, determines which Indian cities can sell AI capacity to the world.

1At a glance

Record
Tata Communications India-Singapore subsea capacity expansion
Announced
July 2026
Investment
US$152 million, about ₹1,344 crore
Capacity added
98 Tbps of subsea throughput
Networks
MIST and Project CS
Route
India to Singapore
Indian hubs named
Mumbai and Chennai, described as AI hubs
Funding
Internal accruals
Megawatts
None — and none can be derived
Additive flag
Not applicable
Counted in this registry
0 MW
Comparable record
PRJ-052, the CtrlS-Ciena five-metro optical network, handled identically

2What was announced

The disclosure, in full
ItemPublishedMissing
InvestmentUS$152 millionCurrency
Capacity added98 TbpsTerabits per second
NetworksMIST and Project CSNamed cable systems
RouteIndia to SingaporeGeography
Indian endpointsMumbai and Chennai AI hubsCities
Funding sourceInternal accrualsBalance sheet
Megawatts—Not a valid unit for this record

US$152 million for 98 Tbps is about US$1.55 million per terabit per second. That is the only ratio the announcement supports, and it is a useful one for anyone pricing subsea expansion — it is simply not a data centre metric.

For scale, 98 Tbps is roughly the equivalent of carrying every second of a high-definition video call for about four million people simultaneously. It is a very large amount of bandwidth between two countries and it consumes no power at either end beyond the optical termination equipment.

3Why throughput and power are not interchangeable

The distinction, in one worked example

A single 3.2 MW data hall at NTT’s Bengaluru 4 density holds roughly 25 liquid-cooled racks at 130 kW each. Those 25 racks can saturate multiple terabits of long-haul capacity, and the buildings around them draw megawatts whether the cable exists or not.

Equally, 98 Tbps could sit entirely idle and draw almost nothing, or be filled by a single customer whose compute consumes hundreds of megawatts somewhere else.

There is no exchange rate. Any figure that converts Tbps to MW, or adds one to the other, is fabricated.

The three units in this registry, and what each one may be added to
UnitWhat it measuresCan be summed withRecords
MWElectrical capacity, IT or facilityOther MW on the same basis129 counted records
TbpsNetwork throughputNothing in this registryPRJ-052, PRJ-236
sq ftFloor areaOther floor area, with a stated densityPRJ-235, PRJ-237, PRJ-240
₹ croreInvestmentOther investment, never capacityPRJ-235, PRJ-238, PRJ-239

This table is the whole methodology of the registry in four lines. Most published Indian data centre figures mix at least two of these units inside one sentence. The reconciliation of 26 October 2026 exists because this registry did the same thing with 2,420.37 MW of unlike records.

4The connection that does matter: cables decide cities

The record is worth holding for a reason that has nothing to do with megawatts. Subsea landing points determine which Indian cities can serve international AI workloads, and therefore which cities can charge a premium for their capacity.

Cable landing as a differentiator in this registry
Facility or cityCable positionWhy it matters
Sify Chennai 02, SiruseriOnly Indian data centre with an on-site open cable landing stationThe reason its cost is ₹72.6 crore per MW, the highest in the file except two small Kolkata sites
Sify VisakhapatnamOpen cable landing station alongside a 50 MW edge facilityThe stated regional gateway to Singapore, Malaysia, Thailand and Australia routes
MumbaiIndia’s primary landing cluster; named by this record as an AI hub endpointWhere most international capacity already terminates
ChennaiSecond landing cluster; named by this record as an AI hub endpointThe corridor Tata Communications is reinforcing with 98 Tbps
Bengaluru, Hyderabad, NoidaLandlocked; dependent on terrestrial links to a landing stationThe reason NTT’s Devanahalli campus competes on cost rather than connectivity

The clearest evidence for this in the registry is a cost anomaly. Sify’s Siruseri campus costs ₹72.6 crore per MW against an India band of ₹51.4 to 60.1 crore. Part of that premium is the cable landing station, which no other data centre in the country has on site.

Tata Communications is spending US$152 million to make the Chennai and Mumbai corridors faster. It is not building a data centre, and it is improving the economics of everyone who is.

5What would change this record

What could turn this into a capacity record
ItemWhy it would matter
A named landing station or cable landing partyLinks the announcement to a physical Indian site, and potentially to a data centre campus
A capex split by landing cityAllows Mumbai and Chennai to be credited separately
Any associated data centre fit-outOccasionally a cable project brings a colocation or interconnect build with a stated capacity
A capacity figure for the interconnect hallsInterconnect space is measured in megawatts and would be countable, unlike the cable

None of those is likely. Subsea investments are announced in dollars and terabits because that is what they are. This record will stay at zero megawatts, and its value to a buyer is as a labelled non-capacity fact — the thing that stops a competitor improving a market total by adding a cable to it.

6Sources

Sources: Tata Communications announcement, July 2026, of US$152 million to add 98 Tbps of subsea capacity between India and Singapore across the MIST and Project CS networks, funded from internal accruals and linking Mumbai and Chennai AI hubs; Gridvik record PRJ-052 for the comparable CtrlS-Ciena optical network treatment; Gridvik records PRJ-224 for the Sify Siruseri on-site cable landing station and its cost per megawatt, and PRJ-231 for the Visakhapatnam landing station. No capacity figure is applicable to this record. Record verified 26 October 2026.