Facility record · Verified 26 Oct 2026

CtrlS Chennai DC 2 — Tamil NaduCtrlS Datacenters · Chennai · 27 MW IT load, inside a 72 MW two-building campus

Record PRJ-105Tamil Nadu — ChennaiTier D — inside a live aggregate6 public sources checkedAdditive: no — inside the 72 MW campus
IT load statedCounts 0 MW in the stateFacility37.5% of the campus
27MW
IT load, this building
72MW
Campus IT load
45MW
DC 1, by subtraction
37.5%
Of the campus
₹4,000cr
Campus investment
₹55.6cr
Per megawatt

CtrlS Chennai DC 2 is 27 MW of IT load — and that phrase is the point. It is one of only three CtrlS records in this registry that states whether the megawatts are IT or gross. It sits with DC 1 inside a 72 MW, two-building campus built for ₹4,000 crore, which puts DC 1 at 45 MW by subtraction. The campus is live and expanding. It also contributes zero megawatts to the Tamil Nadu total, because every building in it is flagged as already inside the campus aggregate. That is the cleanest data in the Chennai file attached to the least visible number in it.

1At a glance

Operator
CtrlS Datacenters Limited
Facility
Chennai DC 2, the second building in the Chennai DC park
Capacity
27 MW of IT load — basis stated explicitly
Parent campus
72 MW of IT load across two buildings, approximately one million square feet, on a single Chennai site
Investment
₹4,000 crore direct for the campus, which is ₹55.6 crore a megawatt
Sibling
DC 1, operational from Q2 2024, 45 MW by subtraction from the campus total
Density
72 watts a square foot campus-wide on the published floor area
Status
Stage unverified per building. The campus is live and expanding
Additivity
Not additive. Counted at 0 MW, because the 72 MW campus aggregate is itself flagged non-additive

2The only CtrlS card that names its basis

Most Indian operators publish a megawatt number and leave the reader to guess what it measures. CtrlS does that on its Mumbai and Hyderabad cards. On Chennai and Noida it does not.

How CtrlS states capacity, by site
SiteFigureBasis statedComparable?
Chennai DC park72 MWIT loadyes — this is the clean one
Chennai DC 227 MWIT loadyes
Noida8 MWIT loadyes — see PRJ-106
Bengaluru13 MWIT load in the field, not explicit on the pageyes, with a caveat — see PRJ-107
Mumbai, DC 1 to DC 5118.8 MWpower capacity, unlabelledno
Hyderabad, DC 1 to DC 326.4 MWpower capacity, unlabelledno
Chandanvelly park700 MWnot statedno
Future City campus750 MWnot statedno

Three of eight sites are stated in the same unit. That means a comparison between CtrlS Chennai and CtrlS Mumbai is not a like-for-like comparison, and nobody publishing an India density table has accounted for it.

IT load is the number a tenant cares about, because it is the power their racks can actually draw. Gross facility load includes cooling and losses and is always larger. If the Mumbai 118.8 MW is gross facility load at a PUE of 1.4, its IT load is nearer 85 MW — which would make Chennai the denser campus per rack even though Mumbai publishes the bigger number.

The comparison this unlocks

Chennai at 27 MW of IT load for one building, against a Mumbai building at 12.5 MW of unlabelled power capacity, is not a fair density comparison — and it is the comparison every market report makes.

Stated basis is worth more than a bigger number. This is the page in the CtrlS set where the operator did the reader’s work, and it is the only one.

3DC 1 by subtraction

The campus total and this building’s figure are both published. The rest follows, and the result is a building nobody has ever written about.

The 72 MW campus, split
BuildingIT loadBasis of the figureStatus
DC 145 MWby subtractionoperational from Q2 2024
DC 227 MWpublishedstage unverified per building
Campus72 MWpublishedlive and expanding

A 45 MW first building is larger than every Mumbai building except DC 4, and larger than anything CtrlS has built in Hyderabad. It has no page of its own, no density published, and no rack count. It exists in public only as the remainder of a subtraction.

That is a useful reminder about operator pages: the building that gets written about is the one being marketed, not the one carrying the load. DC 1 has been selling capacity since mid-2024 and is very likely the fuller of the two.

4Why a live 72 MW campus counts nothing

Tamil Nadu has 296.6 MW of counted data centre capacity in this registry. The CtrlS Chennai park is not in that number.

AirTrunk MAA1 Chennaistage unverified, counted128 MW<b>CtrlS Chennai park</b>72 MW IT, live and expanding, counts 072 MW · 0 countedPDG CH1 Chennaiplanned or developing, counted72 MWCapitaLand Chennai 01under construction, counted53 MWSTT GDC Chennai Siruserilive and expanding, counted45 MWNxtra Chennai hyperscalelive, counted38 MWThe second-largest named campus in the state contributes nothing to the state total, because it is flagged as inside its own aggregate. Red is the campus this building belongs to.
Figure 1Counted Tamil Nadu capacity by operator. The red bar is the CtrlS campus this building sits in — 72 MW published, zero counted, because both its buildings are flagged as inside the campus aggregate and the aggregate is flagged non-additive.
The flag that hides a campus
LevelRecordCapacityCounted
CampusCtrlS Chennai DC park72 MWno
BuildingDC 227 MWno — inside the campus
BuildingDC 145 MW impliedno — inside the campus
Resulta live, expanding, ₹4,000 crore campus72 MW0 MW

This is not a data error. It is a rule — do not add a child building to a parent aggregate — hitting a parent that was itself flagged as non-additive, which in practice means the campus is invisible at state level. The rule protects against double counting and produces under-counting instead.

The same defect runs through CtrlS Mumbai (118.8 MW, zero counted) and CtrlS Kolkata (16 MW, zero counted). Between them, roughly 207 MW of published, partly-operating CtrlS capacity contributes nothing to the 2,420.4 MW registry total.

5Procurement

Procurement window and scope
Gridvik assessment · 22 Oct 2026
What to buy here
The Chennai IT-load schedule and the remaining free capacity in DC 1, which is the larger and older building
Who holds the answer
CtrlS Chennai campus sales; the Tamil Nadu guidance bureau for the original investment agreement
The one question
What is the rack count and PUE of DC 2, and how much of DC 1’s 45 MW is let
Why they will answer it
Chennai is the tightest supply market in India outside Mumbai, and tenants are already asking for 2027 handovers
Gridvik estimate
DC 1 is largely let and DC 2 is the selling building today. Labelled an estimate
What changes it
A rack count, a PUE, or a per-building commissioning date
All estimates are labelled as estimates. No tender dates claimed, no private contact data published.
Unlock GridFeed →

6Limits and open questions

  • No rack count. IT load is published but no cabinet count, so density per rack cannot be computed.
  • No PUE. Tamil Nadu’s climate makes this the most important missing figure on the page.
  • DC 1 is inferred. The 45 MW is a subtraction, not a published figure, and is labelled as such.
  • Commissioning date missing for DC 2 — only DC 1 has one (Q2 2024).
  • The ₹50,000 crore indirect investment claim in the original announcement is not a data centre figure and is not used anywhere in this record.
  • What would close it. A rack count and a PUE for either building.

7Sources

Sources: CtrlS Chennai data centre pages, W.Media coverage of the CtrlS Chennai park announcement, Times of India on the ₹4,000 crore Chennai investment, CtrlS corporate site, and Indian market commentary on Chennai data centre supply.