Facility record · Verified 26 Oct 2026

Iron Mountain NCR-1 — Noida, Delhi-NCRIron Mountain Data Centers · Noida, Uttar Pradesh · 69,735 sq ft · 200 kW commissioned · 12 MW scalability ceiling · Counted as 0 MW

Record PRJ-193Uttar Pradesh — NoidaTier C — capacity not disclosed5 public sources checkedAdditive: yes — but no capacity value in source
60× gap between load and ceilingTier III certifiedDisclosed load is from 2022Counts as 0 in the filePlatform page publishes the ceiling as capacity
69,735sq ft
Floor area
6,500m²
Floor area
200kW
Commissioned load, 2022
12MW
Scalability ceiling
60×
Gap
0MW
Counted in the registry

NCR-1 in Noida is 69,735 square feet — 6,500 square metres, which reconciles exactly — of carrier-neutral space, Uptime Tier III certified, half an hour south-east of central New Delhi. The platform page says it has potential to scale up to 12 MW. Iron Mountain’s own facility material from 2022 describes the same building as a 6,500 m², 200 kW data centre. Two hundred kilowatts. That is a sixty-fold gap between what is switched on and what the marketing pages carry, and it is the single clearest example in this registry of why a capacity figure without a scope is worthless.

1At a glance

Facility
NCR-1, Noida, Uttar Pradesh, Delhi-NCR
Operator
Iron Mountain Data Centers India, formerly Web Werks
Floor area
69,735 sq ft / 6,500 m² — the two figures reconcile
Commissioned load
200 kW per a 2022 Iron Mountain facility resource
Scalability ceiling
12 MW per the operator
Gap between the two
60×
Design standard
Uptime Institute Tier III certified
Position
Half an hour south-east of central New Delhi
Interconnection
Interconnects with the Mumbai operations
Density at 12 MW
5,811 sq ft per MW — implausibly high for air cooling
Density at 200 kW
348,675 sq ft per MW — a single hall
Counted in this registry
0 MW — additive flag yes, capacity field blank

2Two hundred kilowatts and twelve megawatts

One building, one operator, two published figures sixty times apart. Both are on Iron Mountain’s own properties.

The NCR-1 numbers as published
SourceFigureScope stated
Iron Mountain facility video resource, 2022200 kWThe building as it operates
Iron Mountain Asia-Pacific locations page, 202612 MWPotential, listed as capacity in a summary table
Iron Mountain India platform page12 MW“potential to scale up to 12 MW”
This registryblankNeither figure is commissioned load
This is the defect that makes Indian capacity data unusable

A scalability ceiling is a statement about the substation and the site. Commissioned load is a statement about the building. Publishing the first in a table headed capacity makes a 200 kW facility look like a 12 MW one.

It is not a lie and it is not unusual — every operator in this registry does a version of it. It is the reason a counted Indian total of 2,420.4 MW and a published total of 15,822.4 MW describe the same market.

This registry counts zero for NCR-1 rather than choosing between the two figures. A blank with an explanation is more useful than a number with no scope.

The 200 kW figure is from 2022 and may be stale. If the building has been fitted out since, the true current load is somewhere between 0.2 MW and 12 MW — and nobody has published where.

3What 69,735 square feet should hold

The floor area is the only firm number, so the implied load can be bounded from the operator’s own portfolio densities.

Implied load at Iron Mountain’s own build densities
BasisDensity69,735 sq ft implies
MUM-2, the densest building in the portfolio56.9 W per sq ft3.97 MW
MUM-1 and BLR-150.0 W per sq ft3.49 MW
HYD-145.8 W per sq ft3.19 MW
PUN-1, the least dense39.9 W per sq ft2.78 MW
Portfolio weighted average42.2 W per sq ft2.94 MW
NCR-1 as published in 20222.9 W per sq ft0.20 MW
NCR-1 at its 12 MW ceiling172 W per sq ftPhysically implausible for air cooling

Two conclusions follow. First, 200 kW across 69,735 square feet is 2.9 watts per square foot — a building almost entirely unbuilt-out, with one small hall commissioned. Second, 12 MW in 69,735 square feet would be 172 watts per square foot, which needs liquid cooling and a ground-up rebuild, not a scale-up.

So the likely current figure is 0.2 to 3 MW and the 12 MW is a site capability statement. This registry publishes the bound rather than picking a point inside it.

4Noida in the national count

NCR-1 against the market it sits in
MeasureMWNCR-1 as a share
Uttar Pradesh counted in this registry331.10.06% at 200 kW
NTT Noida 2, the largest Greater Noida campus52.83.8% at 12 MW, 0.4% at 200 kW
Uttar Pradesh at NCR-1’s 12 MW ceiling343.1+3.6% — the ceiling is immaterial
Delhi counted in this registry0The Delhi records carry no additive capacity
National counted total2,420.4Immaterial at either figure

That is the point of the page. NCR-1 is commercially irrelevant at any of its published values, and it is the single best illustration in this registry of the measurement problem: the same building can be described as 0.2 MW or 12 MW, and neither is a lie.

The registry’s answer is to carry zero, name both figures, and let a buyer see the gap.

5Procurement

Procurement window and scope
Gridvik assessment · 22 Oct 2026
What to buy here
A carrier-neutral Noida footprint with a Mumbai interconnect — and the clearest example of a scope problem you can put in front of a client
Where the capacity is
Noida, Uttar Pradesh. 200 kW commissioned in 2022; 12 MW scalability ceiling
Who holds the answer
Iron Mountain Data Centers India, Delhi-NCR sales team
The one question
What is commissioned today, in kW, and by when does the 12 MW arrive
Why they will answer it
It is a straightforward question with a sales answer attached
Gridvik estimate
Current load between 0.2 and 3 MW; the 12 MW ceiling will not be reached on this footprint without a rebuild. Labelled an estimate
What changes it
A published capacity figure, or a fit-out announcement naming megawatts
All estimates are labelled as estimates. No tender dates claimed, no private contact data published.
Unlock GridFeed →

6Limits and open questions

  • The 200 kW figure is from 2022 and may be stale. It is the only disclosed load the registry has for this building.
  • 12 MW is scalability, not capacity. It is excluded from every total on this page.
  • The 2.8 to 4.0 MW implied range assumes the operator builds to its own portfolio densities and is a Gridvik calculation, not a disclosure.
  • 12 MW in 69,735 sq ft is 172 W per sq ft, which implies the ceiling refers to a rebuild rather than a fit-out.
  • The floor area reconciles across sources at both 69,735 sq ft and 6,500 m², which is why the page leans on it.
  • The count is zero. This is deliberate and is the correct treatment.
  • What would close it. A single published figure with the word “commissioned” in front of it.

7Sources

Sources: the Iron Mountain Delhi-NCR location page; the Iron Mountain Asia-Pacific locations page; the Iron Mountain Data Centers India platform page; the Iron Mountain NCR-1 360-degree facility tour resource; and the Web Werks Delhi data centre page.