Yotta TB1 — Navi MumbaiYotta Data Services (Hiranandani Group) · Navi Mumbai, Maharashtra · 1 MW IT load · Live · Nine fields unpublished

Record PRJ-213Maharashtra — Navi MumbaiTier C — single-line disclosure2 public sources checkedAdditive: yes — 1 MW counted
1 MW countedNo floor area, racks or dateNo certification stated1.6× the size of G1’s neighbour TB2 in data terms
1MW
IT load
1
Published attribute
9
Fields missing
0.04%
Of Maharashtra
0
Rack count
0
Commissioning date

TB1 is a 1 MW IT load facility in Navi Mumbai, live per Yotta’s portfolio page. That is the whole public record. There is no floor area, no rack count, no commissioning date, no certification, no substation, no site area and no scope beyond the megawatt. This page is short because the data is short, and it exists for two reasons: to count the megawatt, which the operator states plainly, and to record exactly what is missing, because a dataset that quietly omits thin records is less useful than one that shows where its coverage runs out.

1At a glance

Facility
TB1, Navi Mumbai, Maharashtra
Operator
Yotta Data Services, Hiranandani Group
Status
Live per the operator portfolio page
IT load
1 MW
Scope
Facility IT load, as stated
Share of Maharashtra’s 786.4 MW counted
0.13%
Share of Yotta’s 236 MW in this registry
0.4%
Counted in this registry
1 MW — additive

2What is published and what is not

The complete public record for TB1
FieldValueStatus
OperatorYotta Data ServicesPublished
LocationNavi MumbaiPublished
IT load1 MWPublished
StatusLivePublished
Floor areanot publishedMissing
Rack countnot publishedMissing
Rack densitycannot computeMissing
Commissioning datenot publishedMissing
Certificationnot statedMissing
Substation or power feednot publishedMissing
Site areanot publishedMissing
Design PUEnot statedMissing
Why a thin page is the right page

Nine fields are missing. The temptation is to fill them — infer a rack count from the family average, assume a commissioning year from the portfolio, quote a sibling building’s certification. That is how a dataset becomes confidently wrong.

This registry publishes one megawatt and a list of absences. A buyer can see immediately that TB1 is a known quantity and an unknown building, which is the truth.

It also protects the national total. If every thin record were padded with plausible inferences, the 2,420.4 MW figure would be an estimate dressed as a count. It is a count.

TB1 and TB2 sit alongside NM1 in Navi Mumbai, and the contrast inside one operator is instructive. NM1 is 820,000 sq ft, 16 floors, 7,000 racks, 52 MW with Tier IV and Gold operational certification. TB1 is 1 MW and one sentence.

The likely explanation is that these are older, smaller legacy facilities from the group’s earlier IT business rather than purpose-built hyperscale halls. Yotta has not said so, and the registry does not assume it.

3Procurement

Procurement window and scope
Gridvik assessment · 22 Oct 2026
What to buy here
Nothing material — 1 MW in Mumbai is not a procurement target
Where the capacity is
Navi Mumbai, Maharashtra
Who holds the answer
Yotta Data Services
The one question
Is this capacity marketed at all, or is it captive to a group tenant
Why they will answer it
A portfolio page that lists it implies it is tradeable
Gridvik estimate
Too small to be a competitive colocation product. Labelled an estimate
What changes it
Any published specification for this building
All estimates are labelled as estimates. No tender dates claimed, no private contact data published.
Unlock GridFeed →

4Limits and open questions

  • Nine fields are unpublished. This page does not infer any of them.
  • 1 MW is IT load as stated, with no scope qualifier.
  • No commissioning date, so the age of the building is unknown.
  • No rack count, so density cannot be computed or compared.
  • 1 MW is counted, because the operator published a capacity for a live facility.
  • What would close it. Any specification sheet for this building.

5Sources

Sources: the Yotta data centre portfolio page listing TB1 as a 1 MW IT load facility in Navi Mumbai.