Facility record · Verified 26 Oct 2026

Sify Chandigarh 01 — AI EdgeSify Technologies · Chandigarh · up to 4.8 MW modular · AI Edge · Live · One of two operating edge sites

Record PRJ-229Chandigarh — UT and PunjabTier C — live, capacity is a product maximum5 public sources checkedAdditive: yes — 4.8 MW counted
Live AI Edge facilityModular, scalable architecture“Up to 4.8 MW” is a ceiling, not a measurementIdentical figure published for Lucknow 01
4.8MW
Up to
2
Live edge sites
10
Security layers
9.6MW
Counted, both sites
10-12
Edge sites planned
100%
Of Chandigarh counted

Chandigarh 01 is one of two operating sites in Sify’s AI Edge programme, alongside Lucknow 01. It is published at up to 4.8 MW of modular IT capacity, with a 10-layer security model, a national long-distance fibre backbone and a design aimed at low-latency AI inferencing rather than hyperscale training. The important word is up to. 4.8 MW is the maximum of a modular product, not a measurement of what is energised — and the identical sentence is used for Lucknow. The registry counts 4.8 MW here and 4.8 MW there, so 9.6 MW of the national 2,420.37 MW comes from one product specification stated twice. It is the smallest and least verifiable figure in this folder, and it is also the one that tells you where Sify thinks its next decade of demand is.

1At a glance

Facility
Sify Chandigarh 01, Chandigarh
Operator
Sify Technologies, via Sify Infinit Spaces
Status
Live, per the operator portfolio page
IT capacity
up to 4.8 MW, modular
Qualifier
Up to — a product maximum, not an installed figure
Architecture
Modular, scalable in pods
Security
10-layer physical and electronic security
Network
National long-distance fibre backbone, carrier-neutral ecosystem
Workload
Real-time AI inferencing and low-latency digital services
Sustainability
Base build, pod and process, per the operator
Sibling site
Lucknow 01, the other live edge facility, also up to 4.8 MW
Programme
10 to 12 edge sites planned; Nagpur and Kolkata announced as next
Share of Chandigarh’s counted capacity
All of it — the only record in the state
Counted in this registry
4.8 MW — additive

24.8 MW is a product, not a measurement

The same sentence, twice
FieldChandigarh 01Lucknow 01
RecordPRJ-229PRJ-230
StatusLiveLive
Capacityup to 4.8 MWup to 4.8 MW
ArchitectureModularModular
Security10 layers10 layers
QualifierUp toUp to
Counted4.8 MW4.8 MW

Two facilities in two states, opened months apart, published with identical capacity. That is not a coincidence and it is not an error: 4.8 MW is the modular unit Sify builds. The site is a pod count, and every site is quoted at the maximum pod count.

Which means the number tells you about the product, not the site. A facility with one pod installed and a facility with four pods installed both publish 4.8 MW. Nothing in the public record distinguishes them.

How to treat an “up to” figure in a capacity count

An up to figure is a ceiling on a modular product. It is useful for sizing the site and useless for sizing the load.

The registry counts 4.8 MW on both records because it is the only capacity either operator has published, and because understating a market that is already counted as a floor is the more dangerous error. Both records are flagged as ceilings here and in the source register.

When two identical site figures appear, the honest reading is that neither has been measured. The figure is a specification, and a specification repeated is still one specification.

3What an edge facility is actually for

The reason Sify is building 4.8 MW pods in Chandigarh and Lucknow rather than 130 MW campuses is latency and land. A training cluster wants cheap power and space; an inference service wants to be within a few milliseconds of its users, and users are in tier-two cities.

Hyperscale campus against edge pod
DimensionHyperscale campusEdge facility
Capacity100 MW and aboveup to 4.8 MW
WorkloadTraining, large data platformsInference, caching, latency-sensitive services
LandDozens of acresA floor or a small plot
Build time24 to 36 monthsMonths, in modular pods
CustomerHyperscalers and GPU cloudsEnterprises, government, regional banks
Example hereNoida 02, Chennai 02, RabaleChandigarh 01, Lucknow 01

The 10-layer security and the carrier-neutral fibre backbone are the parts that make an edge site sellable to a bank or a government department. Those customers will not put core workloads in a hyperscale campus 300 km away, and they will not accept a colo cage in a commercial building either. A small, certified, carrier-neutral pod in their own city is the product they have been waiting for.

Chandigarh is a sensible first address for it. The city is the administrative capital of two states, has a large government and banking presence, and sits at the northern end of the national fibre map with no hyperscale campus of its own. The entire counted capacity of Chandigarh in this registry is this one 4.8 MW facility — which says as much about the gap in tier-two India as it does about Sify.

4Where the edge programme tops out

Two sites liveChandigarh 01 and Lucknow 019.6 MWFour sitestwo more under construction19.2 MWTen siteslow end of the stated plan48 MWTwelve siteshigh end of the stated plan57.6 MWEvery bar assumes the full 4.8 MW at every site. No site has published an installed figure.
Figure 1 — the Sify edge programme at each published stage, assuming every site reaches its full 4.8 MW. No site has published an installed figure.
The programme against the national total
StageSitesMW at full 4.8% of 2,420.37 MW
Live today29.60.4%
Including those under construction419.20.8%
Stated plan, low end1048.02.0%
Stated plan, high end1257.62.4%

The arithmetic is deflationary and it is the most useful thing on this page. Even a fully built twelve-site edge network adds 57.6 MW — 2.4% of the national counted capacity. Sify’s stated ambition to be in every state with edge data centres is real, but it is a distribution strategy, not a capacity strategy.

That matters for anyone valuing the company on megawatts. The edge programme will not move Sify’s capacity number. What it can move is revenue per megawatt, because an inference pod in Chandigarh sells at a very different rate to a wholesale hall in Navi Mumbai — and Sify has not published rents for either.

The comparison worth holding in mind: one Rabale tower is 43.3 MW, or 1.4 times the entire twelve-site edge plan. The edge network exists for coverage, latency and public-sector relationships. The campuses exist for the megawatt count.

5Procurement

Procurement window and scope
Gridvik assessment · 22 Oct 2026
What to buy here
Low-latency AI inferencing and enterprise colocation in Chandigarh, in a modular pod with 10-layer security
Where it is
Chandigarh. Up to 4.8 MW, modular
Who holds the answer
Sify Technologies enterprise and government sales, north region; Sify Infinit Spaces for the asset
The one question
How many pods are installed today, and what is the energised load rather than the ceiling
Why they will answer it
A newly opened asset in a city with no other hyperscale capacity
Gridvik estimate
About ₹27 crore of plant at 4.8 MW and ₹55.3 crore per MW. Labelled estimate
What changes it
An installed-capacity figure, or a named anchor tenant such as a state department or bank
All estimates are labelled as estimates. No tender dates claimed, no private contact data published.
Unlock GridFeed →

6Limits and open questions

  • 4.8 MW is an “up to” figure from a portfolio page. No installed capacity is published.
  • The figure is identical to Lucknow 01, which means it describes a modular product rather than either site.
  • No rack count, floor area, PUE or substation class is published for this facility.
  • No opening date, tenant or investment figure is published for Chandigarh, unlike Lucknow which has a groundbreaking date.
  • Chandigarh is a union territory; the registry records the state field as Chandigarh, UT and Punjab, and this record is the only one in it.
  • Counting 4.8 MW is the operator’s ceiling. If actual installed capacity is a single 1.2 MW pod, the national total is overstated by 3.6 MW.
  • What would close it. One sentence from Sify: energised IT load at Chandigarh 01 on a stated date.

7Sources

Sources: the Sify AI Edge data centre page with the up-to-4.8-MW modular specification, 10-layer security and the list of live and planned edge sites; the Sify data centre portfolio page; Sify Infinit Spaces portfolio page; the Sify manufacturing brochure of July 2026; and Blackridge Research on the Chandigarh edge facility.