Sanctioned load, headroom, grants, TTP — the 4 fields you can't scrape.

Every data centre press release says "1GW". None says which substation will give you 50MW, when, and at what landed cost. That is the Layer. 62 rows, public sources, Conf 1–3, pilot.

✓ Pilot · Sheet + walkthrough  ·  Hosted Dashboard/API in dev  ·  Weekly diff
power-layer-hero.png
POWER REALITY · PILOT

The 4 fields — what they mean in a Monday meeting

Press release = headline. Layer = whether you can energize.

🔌
Sanctioned Load

MW actually sanctioned at that substation — from DISCOM ARR / CTUIL/GNA. Not the campus headline.

e.g., 45 MW Siruseri · Conf 3
🚦
Headroom

OK / Constrained / Queue 12–18mo — can that substation take your next 50MW?

● OK ● Constrained ● Queue
🏛️
Grant & Disbursal

Policy says ₹X — has money left the treasury? G.O. ≠ bank credit.

e.g., UP G.O. 12 Oct — disbursal pending
⏳
Time-to-Power (TTP)

Months to energize at that landed cost — the only date your construction schedule cares about.

e.g., 8 mo (OK) / 24+ mo (Queue)

Where we get it — public sources only, no permits

DISCOM/CTUIL

ARR, tariff orders, GNA registers, SLDC, POSOCO

Policy portals

KIADB/RIICO/MIDC G.O.s, single-window, CEIG/EC

Press + benchmarks

Operator newsrooms, ET, Savills/C&W (aggregates only)

Every row: exact URL + announcement date + verified_date + Conf 1–3. We do not warrant error-free data — verify before you rely. Disclaimer →

Sample rows — with Layer

ProjectSanctionedHeadroomTTP
Sify Siruseri 45MW45 MW · Conf 3OK8 mo
AdaniConneX Taloja ph180 MW · Conf 3Constrained14 mo
Google Vizag (prop.)—Queue 18mo24+ mo · at own risk

Sample 3 of 62. Full pilot = 62 with Layer fields. Free 8-row preview →

Pilot — what you actually get today

Dashboard/API is in development, not yet hosted. Pilot is analyst-led:

  • Sheet with 62 + Layer fields + source URLs
  • 30-min walkthrough — how we scored headroom/TTP
  • Weekly diff on Monday (retained log)