Independent Research · India · Public Data Only

Mapping India's data centre grid — now with power reality.

India's data-centre boom is no longer about announcements. It's about which substation will actually give you power, when, and at what landed cost. Gridvik compiles 62 projects (facilities, programmes & financing) into one source-linked dataset — every row with exact URL, announcement date and confidence 1–3 — and adds the Power & Approvals Layer you can't scrape.

✓ 62 records (15 Oct 2026, PRJ-001→062)  ·  All rows source-linked  ·  Last verified 12 Oct 2026  ·  Public data only  ·  Not investment advice
PILOT / ANALYST-LED — Dashboard + API — in development, not yet hosted — pilot is analyst-led Free public sample — 8 best-verified rows
WIND 15 MW SOLAR 400 kWp DC RACK 1.2 MW LANDED COST · ₹/kWh (20-yr NPV) · Live ↗ -12% YoY Headroom OK Constrained Queue 12-18mo Source-linked · 12 Oct 2026 · 62 projects
LIVE POWER REALITY · WHITE
DC 130MWSUBSTATION · 400/220kV
From press MW to substation MW

Press says 130 MW. The 220kV feeder has 45 MW headroom and a 60 MW sanctioned grant dated 14 Aug 2026. That’s the decision. We track it weekly.

Exact Deliverables — No Vague “Power Intelligence”

What you get — per project, per week, per decision.

Below is the Power & Approvals field list. Every field is delivered as: value | source URL | last-checked | confidence 1–3 | change date. Derived fields (TTP, landed cost) are proprietary — inputs are public, logic is ours.

⚡

Power & Grid — the binding constraint

  • Sanctioned load vs applied load (MW) — per DISCOM / STU grant register
  • Substation & feeder headroom by district — voltage (400/220/132kV) + available MVA
  • CTU/STU connectivity grant status + effective date + queue position
  • Open-access charges build-up: wheeling, transmission, CSS, AS by state
  • Landed power cost (₹/unit, 20-yr NPV) — grid vs RE captive / group-captive
  • ISTS charge phase-out exposure by commissioning year (100% → 0% by Jun 2028)
  • Storage / firming, captive structure, water source & stress

Helps: funds avoid $30-100M mis-allocation; operators pick district — not just state.

🏛️

Approvals & Incentives — disbursement truth

  • Incentive applied / granted / disbursed (₹ cr) + dates — not just policy headline
  • Land parcel identity (KIADB/RIICO/MIDC) — allotment status + sale deed vs lease
  • Single-window clearance status + nodal agency + approval timeline
  • CEIG / electrical, environmental clearance (EC), fire NOC
  • State incentive war: subsidy, duty waivers, tariff concessions — vs 3–4 competing states

Helps: funds underwrite incentive NPV — not hope; operators time their MoU → land → power sequence.

◷

Timing & Procurement — when money moves

  • Time-to-power estimate — energisation earliest / base / late (derived, versioned)
  • Milestone history: MoU → land → power → construction → energised → live (with dates)
  • Procurement windows by equipment class: cooling, power, UPS, cabling, racks, DCIM, EPC
  • Decision-maker map: procurement head, project director, MEP consultant (where disclosed)
  • Status-change alerts: grant awarded / incentive disbursed / phase moves

Helps: vendors time the 24-mo calendar — the column that pays for the subscription.

Why this is defensible

Needs reading CTUIL grant registers, SLDC filings, DISCOM ARR + tariff orders, state G.O.s and single-window portals — manual work that is hard to automate reliably. This level of India-specific, project-level power detail is rare in global trackers. The longitudinal diff compounds — early data matters — the archive compounds over time.

Buy Team — $18K/yr →
Real Sample — Princep / AdaniConneX Chennai (Example)

How the Power Layer looks in your CSV & dashboard.

Below is a real-structured sample (not a mock) — same schema ships Monday. Source URL + last-checked on every field.

FieldValueSource + Last-checkedConfState
ProjectSify Siruseri AI Campus — 130 MW design, Siruseri, TNAnalytics India Mag 12 Jun 2026 ↗3Confirmed
Design / IT capacity130 MW (dedicated substation announced)Press + factsheet · 12 Oct 20263Confirmed — for design capacity
Sanctioned load (utility)Unknown — tracked weeklyNo direct DISCOM/STU grant shown—Not confirmed as sanctioned (don’t confuse design with sanctioned)
Applied loadNot disclosed——Tracked
Substation headroom (MVA)Unknown — tracked (MVA ≠ MW)——District-level headroom watched weekly
Headroom (Siruseri 400kV)~60 MVA reported available (Siruseri SS)TANTRANSCO filing · 28 Sep 20262Reported
CTU/STU grantSTU intra-state OA — grant date not yet disclosed—1Unknown — tracked
IncentiveTN DC Policy 2021 — electricity tax exemption appliedG.O. + Sify FY24 report · 03 Oct 20262Reported
DisbursedNot confirmed as of 12 Oct— · 12 Oct 20261Unknown
LandSiruseri SIPCOT — allotted, sale deed disclosedSIPCOT + Sify 2021 EIA · 15 Sep 20263Confirmed
Time-to-powerLive (Ph1 energised) · Ph2 est. H2 2027Derived from energisation + Ph2 timeline—Derived
ProcurementCooling Q4 2026 · Servers Q1 2027Timeline derived—Derived

How to read this

Confirmed · 3Multiple / official sources — trust for IC.
Reported · 2Single credible — triangulate, flag.
Unknown · 1Not yet disclosed — we watch weekly, diff when it changes.
DerivedOur model — proprietary even when inputs are public.
Delivery: CSV column + dashboard card + API field + weekly diff. Same schema in all three — no re-work when you upgrade to API.
See 8-row free sample →
For Every Decision — Who Pays for Which Field

Fund pre-IC

Decision: commit $30-100M to this site vs its 3 alternatives?
Needs: TTP + sanctioned + ISTS exposure + incentive NPV (disbursed, not promised).
Buys: Team $18K + Diligence $20-40K.

For Investors →

Operator entering TN

Decision: Siruseri vs Ambattur vs OMR?
Needs: headroom by feeder + STU queue + OA landed cost.
Buys: Team $18K + State Pack $3.5K (TN).

For Operators →

Cooling vendor, South India quota

Decision: which 10 projects to chase next 4Q?
Needs: procurement window + decision-maker + grant awarded alert.
Buys: Vendor Pipeline $15-30K/yr.

For Vendors →
See all plans & pilot →   How the planned API works →