Mumbai is 55% of live capacity. The next 5GW is not. We scored 10 states on headroom, time-to-power, and landed cost — so you pick a substation, not a headline. Free PDF.
One page per state — score, headroom map, TTP, and what to verify on site.
Headroom: Constrained in Mumbai, OK in Taloja
Headroom: OK (Siruseri), TTP 8 mo
Headroom: Queue 18mo — at own risk (HC)
| State | Score | Headroom | TTP |
|---|---|---|---|
| TN | 7.8 | OK | 8 mo |
| MH (Taloja) | 6.5 | Constrained | 14 mo |
| AP (Vizag) | 4.1 | Queue | 24+ mo |
| + 7 more states in PDF — Gujarat, UP, KA, TG, DL, RJ, MP | |||
We reply in 24h with download link. No card needed.